ML20062M267
| ML20062M267 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/03/1994 |
| From: | Wigginton D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20062M270 | List: |
| References | |
| NUDOCS 9401060373 | |
| Download: ML20062M267 (4) | |
Text
y L
7590-01 UNITED-STATES NUCLEAR REGULATORY COMMISSION l
SYSTEM' ENERGY RESOURCES. INC.
SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION MISSISSIPPI POWER AND LIGHT COMPANY' GRAND GULF NUCLEAR STATION. UNIT 1
^
DOCKET NO. 50-416 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT' IMPACT The U.S. Nuclear Regulatory Commission (the Commission) is considering-issuance of an amendment to Facility Operating License No. NPF-29, issued to e
the Entergy Operations, Inc. (the licensee), for operation of the Grand Gulf; Nuclear Station (GGNS), located in Clairborne County, Mississippi.
ENVIRONMENTAL ASSESSMENT Identification of Proposed Action:
l The proposed amendment would consist of revisions to 10 CFR Part 20 4
references to recognize the new section numbers,~ revise definitions to ensure-consistency with 10 CFR Part 20, and change. administrative controls for
[
reporting and recordkeeping to maintain compliance with the new Part 20. The 1
changes would revise the limitations on concentrations of radioactive material released in liquid effluents and the limitations on the dose rate resulting from radioactive material released in gaseous effluents and reflect the relocation of the prior 10 CFR 20.106 requirements to the new 10 CFR 20.1302.
These changes are in response to the licensee's application for amendment dated August 11, 1993, implementing the new 10 CFR Part 20.
The Need for the' Proposed Action:
The proposed action is needed in order to retain operational flexibility consistent with 10 CFR Part 50, Appendix I, concurrent with the implementation of the revised 10 CFR Part 20.
9401060373 940103 PDR ADOCK 05000416 l
- P' PDR i
Environmental Imoacts of the Prooosed Action:
The proposed revision, in regards to the actual release rates as referenced in the Technical Specifications (TSs) as a dose rate to the maximally exposed member of the public, will not increase the types or amounts I
of effluents that may be released offsite, nor increase individual or cumulative occupational radiation exposures. Therefore, the Comission concludes that there are no significant radiological environmental impacts associated with the proposed amendment.
With regard to potential nonradiological impacts, the proposed changes do not affect nonradiological effluents and have no other environmental-impact.
Therefore, the Comission concludes that there are no significant nonradiological environmental impacts associated with the proposed amendment.
Alternatives to the Proposed Action:
Since the Comission concluded that there are no significant environmental impacts associated with the proposed amendment to the TSs, any alternative to the amendment either will have no significantly different environmental impact or will have greater environmental impact. The principal alternative would be to deny the requested amendment. This would not reduce environmental impacts as a result of plant operation.
Alternative Use of Resources:
This action does not involve the use of resources not previously considered in the Final Environmental Statement related to the operation of the Grand Gulf Nuclear Station, dated September 1981.
Aoencies and persons consulted:
1 The Comission's staff. reviewed the licensee's request and did not -
consult other agencies or persons.
)
s
~, _ -
-t-
-.,e
. FINDING OF NO SIGNIFICANT IMPACT Based upon the foregoing environmental assessment, we conclude that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the Commission has determined not to prepare an environmental impact statement for the proposed license amendment.
For further details with respect to this action, see the application for amendment dated August 11, 1993, which is available for public inspection at the Commission's Public Document Room, 2120 L Street, NW., Washington, DC, and at the Judge George W. Armstrong Library, Post Office Box 1406, S. Commerce at Washington, Natchez, Mississippi 39120.
Dated at Rockville, Maryland, this 3rd day cf January,19984.
FOR THE NUCLEAR REGULATORY COMMISSION
(?
~~
i f
i sav d L. g{.ginton, Acting Director s
v Project Directorate IV-3 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation i
P
~..
^
i. ;.y %
~
[/g,,L*%
'E Docket File?
UNITED STATES PNoonan NUCLEAR REOULATORY COMMISSION P0'Connor m
?
?,y
- WASHINGTON. D.C. & 55
. Reading-s
?*,..... #;
January 3, 1993~
i
.DoCKETNO.
' Regulatory Publications Branch MEMOMANDUM FOR:
Division of Freedom of Information and Publications Services Office of Administration and Resources Management FROM:
Office of Nuclear Reactor Regulation i SUBKCT:
1 Grand Gulf Nuclear Station -
-l One signed original of the Federaf Register Notice identified below is enclosed for your transmittal to the Office of the Federal
_ of the Notice are enclosed for your use.
[
Register for publication. Additional conformed copies (
~5
)
Notice of Receipt of Application for Construction Nnnit(s) and Operating License (s).
.[
Notice of Receipt of Partial Application for Construction Permit (s)and Facility
^!
License (s): Time for Submission of Views on Antitrust Matters.
Notice of Consideration of Issuance of Amendment to Facility Operating License.(Call with__.-day insert date).
Notice of Receipt of Application for Facility License (s): Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of lesuance of Facility License (s) and Notice of Opportunity for Hearing.
I Notice of Avaliability of NRC Draf t/ Final Environmental Statement.
t Notice of Limited Work Authorization.
- htice of Availability of Safety Evaluation Report.
fulce of issuance of Construction Permit (s).
5 Notice of lasuance of Facility Operating License (s) or Amendment (s).
.}
Order.
l Exemption.-
Notice of' Granting Exemption.
Environmental Assessment.
Notice of Preparation of Environmental Assessment.
j Receipt of Petition for Director's Decision Under 10 CFR 2.206.
i lasuance of Final Director's Decision Under 10 CFR 2.206.
h f
Other; d
H
. Division of Reactor Projects ~- III/IY/Y.
7
,j
~ Enctosure:.
ti As stated contact; ' Paul-Kleene j
- Phone: =504-1302 Ti
- i o-c e *
. D4.L..
...........J
..cu="^"t*
ne......
- m* J/3/.94.....
........... w q wze rona sie noisoe uncu omao OFFICIAL RECORD COPY >
l 1
-i
-