4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263_..____
UNIT Mont. cello __;
DATE 12-2-81____
COMPLETED BY A.
L. Myrabo TELEPHONE 612/295-515i MONTH _..____ NOVEMBER _______
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL a
(MWe-Net)
(MWe-Net) i
-4____________
17 O____________
9
_4____..._____..
10
_i____________
3
-4____________
19
-4____________
4
-4____________
20
-3_.___________
S
-4____________
21
-4____________
6
__________-4__________.._
22
-3_______..____
7
-3____________
23
-4____________
8
-3____________
't
-4___________.
9
~4____________
25
-4_____._______
10
-3____________
26
__________-4__________._
11
-3__..____
27
-4_..________.__
12
-4____________
28
-3____________
13
-3____________
29
-4____________
14
-3____________
30
-3____________
15
-1____________
31 16 O____________
INCTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting' month.
Compute to the nearest whole ruegawatt.
hp A
O R
L.
IJE G 3 1981 I
OPERATING DATA REPORT DOCKET NO.
50-263 _ ___
DATE 12-2-81____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 GPERATING STATUS (Notes i
1.
Unit Na rne
__Monticello i
I; 2.
Reporting period: _____ __. __ __ ____ NOVEMBER I
ll 3.
Licensed Thermal Power (MWt)
______1670 l
lj 4.
Na rnep l a t e Rating (Gross MWe)
_______. _ __569 l
l) 5.
Design Electrical Rating (Net MWe)'
_____545.4 l
li 6.
Ma x i m ura Dependable Capaciiy (Gross MWe).
__564 l
ll 7.
Maxiraura Dependable Capacity (Net MWe)- _ __536 1__.__..______.__....__l' O.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
__N/A___
9.
Power Level To Which Restricted. If Any (Net MWe)
___N/A__...
- 10. Reasons For Restrictions, If Any:
__N/A_._._.____.__.____________.______._____._
This Month Yr.-to-Date Curautative
- 11. Hours In Reporting Period
__._ _720
__ _8016
_.__ 91345
- 12. Number Of Hours Reactor Was Critical 0.0
___6416.6
._ 74935.6
- 13. Reactor Reserve Shutdown Hours
_ _0.0
._0. 0
__ __940.7
- 14. Hours Generator On-Line
___ 0.0
__._0.0
._0.0 0.0
_.__6362.6
_ 73209.7
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 0
_10058822
_119602342
- 17. Gross Electrical Energy Generated (MWH). _ _
0
_3410186
__38005377 i0. Net Eleciricai Euer9y Generated (MWH)
_ -2106 3260150
_ 36346153
- 19. Unit Service Factor
- 23. Unit Availability Factor 0.0%
__._ 79.4%
_ _. 80.1%
0.0%
___ 79.4%
____ 00.1%
- 21. Unit Capacity Factor (Using MDC Net)
_ -- 0. 5 %
__ 75.9%
74.2%
- 22. Unit Capacity Factor (Using DER Net)
-C.5%
.__ 74.6%
...__ 73.0%
- 23. Unit Forced Outage Rate 0.0%
i.37.
6.1%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
__ June 16, 1982 - Fse f ue l i ng Outage - 42 days ___._ _ _ __ ______._.. ___.___._
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:_ _i-0-81
- 26. Units In Test Status (Prior to Ccmmercial Operation)
N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~
. o NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263___.___
DATE 12-2 -01 __
COMPLETED DY A. L.
Hyrabo TELEPHONE 612/295-5151 HONTH _ ___._ NOVEMBER ____ __
11-1-01 to Continuation of Fall maintenance outa<3e.
i1-30-01
+
Note: Power operation defined as essentially 100% of 4
rated power except for weekend load drops for spec i fled survei llance tes t i nc3
y
~
- ~;
-,;9 "O
- ^
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-263 UNIT NAME. Monticello DATE 12'2-31 COMPLETED BY Ai h REPORT.%f 0NTil November TELEPHONE : 612/295-5151 "i
2e 5
5== =
.=,_
s.
7 s ~4 Licensee g-t.,
5 9.,
Cause 1 Currectne No.
Date 3
5E j
yg5 Esent
?
F!
Aoinn in 35 j f. j Report S' C j '-
Prnent Recurrence 5
16 11.'.- 81 S
720.0 B
1 N/A 2ZZZ ZZZZZZ Continuation of 1981 Fall Main-tenance outage.
i 1.
2 3
4 F; Forced Reason.
Method:
Edubit G -Instructions
- S: Scheduln! -
A. Equipment Failure (Explain) l-Manual for Preparation of Data -
B. Maintenance of Test 2-Manual Scism.
Entry Sheets for Licensee C. Refueling 3-Automatic Scram.
Esent Report (LER) File tNUREG-i' D-Regulatory Restriction 4-Other (Explain )
01611-E-Operator Training & License Examination F Administrative.
5 G. Operational Error (Explain t Exhibit 1 -Same Source 19/77)
' il Other (Explain) i