. _ _ _ _ _ _ _ _ _

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263_..____

UNIT Mont. cello __;

DATE 12-2-81____

COMPLETED BY A.

L. Myrabo TELEPHONE 612/295-515i MONTH _..____ NOVEMBER _______

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL a

(MWe-Net)

(MWe-Net) i

-4____________

17 O____________

9

_4____..._____..

10

_i____________

3

-4____________

19

-4____________

4

-4____________

20

-3_.___________

S

-4____________

21

-4____________

6

__________-4__________.._

22

-3_______..____

7

-3____________

23

-4____________

8

-3____________

't

-4___________.

9

~4____________

25

-4_____._______

10

-3____________

26

__________-4__________._

11

-3__..____

27

-4_..________.__

12

-4____________

28

-3____________

13

-3____________

29

-4____________

14

-3____________

30

-3____________

15

-1____________

31 16 O____________

INCTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting' month.

Compute to the nearest whole ruegawatt.

hp A

O R

L.

IJE G 3 1981 I

OPERATING DATA REPORT DOCKET NO.

50-263 _ ___

DATE 12-2-81____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 GPERATING STATUS (Notes i

1.

Unit Na rne

__Monticello i

I; 2.

Reporting period: _____ __. __ __ ____ NOVEMBER I

ll 3.

Licensed Thermal Power (MWt)

______1670 l

lj 4.

Na rnep l a t e Rating (Gross MWe)

_______. _ __569 l

l) 5.

Design Electrical Rating (Net MWe)'

_____545.4 l

li 6.

Ma x i m ura Dependable Capaciiy (Gross MWe).

__564 l

ll 7.

Maxiraura Dependable Capacity (Net MWe)- _ __536 1__.__..______.__....__l' O.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

__N/A___

9.

Power Level To Which Restricted. If Any (Net MWe)

___N/A__...

10. Reasons For Restrictions, If Any:

__N/A_._._.____.__.____________.______._____._

This Month Yr.-to-Date Curautative

11. Hours In Reporting Period

__._ _720

__ _8016

_.__ 91345

12. Number Of Hours Reactor Was Critical 0.0

___6416.6

._ 74935.6

13. Reactor Reserve Shutdown Hours

_ _0.0

._0. 0

__ __940.7

14. Hours Generator On-Line

___ 0.0

__._0.0

._0.0 0.0

_.__6362.6

_ 73209.7

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 0

_10058822

_119602342

17. Gross Electrical Energy Generated (MWH). _ _

0

_3410186

__38005377 i0. Net Eleciricai Euer9y Generated (MWH)

_ -2106 3260150

_ 36346153

19. Unit Service Factor
23. Unit Availability Factor 0.0%

__._ 79.4%

_ _. 80.1%

0.0%

___ 79.4%

____ 00.1%

21. Unit Capacity Factor (Using MDC Net)

_ -- 0. 5 %

__ 75.9%

74.2%

22. Unit Capacity Factor (Using DER Net)

-C.5%

.__ 74.6%

...__ 73.0%

23. Unit Forced Outage Rate 0.0%

i.37.

6.1%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)

__ June 16, 1982 - Fse f ue l i ng Outage - 42 days ___._ _ _ __ ______._.. ___.___._

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:_ _i-0-81
26. Units In Test Status (Prior to Ccmmercial Operation)

N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

~

. o NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263___.___

DATE 12-2 -01 __

COMPLETED DY A. L.

Hyrabo TELEPHONE 612/295-5151 HONTH _ ___._ NOVEMBER ____ __

11-1-01 to Continuation of Fall maintenance outa<3e.

i1-30-01

+

Note: Power operation defined as essentially 100% of 4

rated power except for weekend load drops for spec i fled survei llance tes t i nc3

y

~

~;

-,;9 "O

  • ^

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-263 UNIT NAME. Monticello DATE 12'2-31 COMPLETED BY Ai h REPORT.%f 0NTil November TELEPHONE : 612/295-5151 "i

2e 5

5== =

.=,_

s.

7 s ~4 Licensee g-t.,

5 9.,

Cause 1 Currectne No.

Date 3

5E j

yg5 Esent

?

F!

Aoinn in 35 j f. j Report S' C j '-

Prnent Recurrence 5

16 11.'.- 81 S

720.0 B

1 N/A 2ZZZ ZZZZZZ Continuation of 1981 Fall Main-tenance outage.

i 1.

2 3

4 F; Forced Reason.

Method:

Edubit G -Instructions

- S: Scheduln! -

A. Equipment Failure (Explain) l-Manual for Preparation of Data -

B. Maintenance of Test 2-Manual Scism.

Entry Sheets for Licensee C. Refueling 3-Automatic Scram.

Esent Report (LER) File tNUREG-i' D-Regulatory Restriction 4-Other (Explain )

01611-E-Operator Training & License Examination F Administrative.

5 G. Operational Error (Explain t Exhibit 1 -Same Source 19/77)

' il Other (Explain) i