ML20062L592

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 to Security Force Training & Qualification Plan.Revision Withheld (Ref 10CFR2.790)
ML20062L592
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/09/1982
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML19297F430 List:
References
WPO-NRC-JAF-069, WPO-NRC-JAF-69, NUDOCS 8208190162
Download: ML20062L592 (2)


Text

POWER AUTHORITY OF THE STATE OF NEW YORK to COLUMaus CIRCLE NEW YORK. N. Y.10o19 (212) 397 6200 TRUSTEES GEORGE 7. BERRY JOHN s. ovSON OPE R ATING O F FIC E R CH A M M AN JOHN W. BOSTON GEORGE L. ING ALLS Pat o T&

nEctOm VIC E CH48MM AN OF POWER OPER ATIONS JOSEP Q SC lc,D E R RICHARD M. FLYNN E

RosERT. MILLO N U Ee EEa FREDERICK R. CLARK LEROY W. SINCLAIR

c~fE P 71""' '"'

August 9, 1982 a"'a '

Docket #50-333 WPO/NBC/JAF/069-82 T H o ",^ 5 a,, F R E,Y,,,,,,,,,,

c

& GENER AL roWNSEL Mr. Dmenic B. Vassallo Operating Peactors Branch #2 Division of Licensing United States Nuclear Regulatory Ccmnission Washington, D.C.

20555

SUBJECT:

James A. Fitzpatrick Nuclear Power Plant - Training and Qualification Plan (10CFR73-Appendix B).

Dear Mr. Vassallo:

Forwarded herewith are five (5) copies of the Training and Qualificaticn Plan for James A. FitzpdLilek Nuclear Power Plant with revisions in accordance with your previous conments and our correspondence.

This subnittal incorporates previous ccmaent correspondence and current requirments.

The contents of the attached subnittal contain proprietary infonnation relative to our facility security measures for physical protection. Therefore, we request in accordance with Section 2.790 (d), Part 2, Title 10, Code of Federal Regulations, that this not be placed in the Public Dccument Rocxn and should receive limited distribution.

It is requested that upon receipt of this correspondence you inventory the l

contents and return enclosure #2 to the Power Authority's Director of Security, Mr. William F. Harrington.

Soot Very truly yours, g

t T

'.11 p

~

( J, 1

ayn sxecutive Vice esident 8208190162 820809 Nuclear Generation PDR ADOCK 05000333 F

PDR JPB:ES:jw SECURITY RELATED INFORMATION cc:

(w/o Attachnents)

TO BE PROTECTED IN ACCORDANCE C. A. McNeill, Jr. (JAF)

Y.ITH 10CFR PART 2. 790(d)

L. W. Sinclair (UPO)

G. M. Wilverding (WPO)

DUPLICATION NOT AUTHORIZED ViITHOUT CONSENT OF DOCUMENT J. Lamberski (WPO)

CUSTODIAN

J.

1 POWER AUTif0RITY STATC i:t' 4

NEW YORK i

j DOCUMENT RECEIPT F0FM I do hereby acknowledge that I have received the-ilocuments listed below on-the date indicated.

Documents Transmitted:

8/12/82 James A. Fitzpatrick Training and Dualification Plan

' I 4

e-t i

Date Received:

4 l

(llame - Print)

(Signature) i 1

j i

(Date Signed)

RETURN TO:

Director of Security, lillian F.

!!arrington l

Power Authority of the State of New York 10 Columbus Circle i

j New York, NY 10019 s

i E

I l

t I,

f Figure 2

,-mm-

--,e,,w,-

-,,,w,,-,--

-m,w.v-

--,ogv,,-mm-,--w-,.,

,--n

-e,,.--,

,,,.--w-v--,

,.~,

3-ew.-

--e m e,w

.--m g

-.m,

~

.-. ~ - g

..n

-