Forwards Revised Fire Protection Rept in Response to Branch Technical Position Cmeb 9.5.1. Revision Incorporates Safe Shutdown Analysis Submitted in Util & Updated Comparison w/10CFR50 App R
ML20062L241
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 08/16/1982
From: Tramm T
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20062L244 List:
References
4768, NUDOCS 8208190014
Download: ML20062L241 (2)


Text

N Commonwealth Edison

[

~ ) ona Fast National Plua, Chicago llhnois (O

Addr:ss R; ply to: Post Office Box 767 Chicago, Illinois 60690 s

August 16, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Fire Protection Report Revision NRC Docket Nos. 50-454/455 and 50-456/457 References (a):

R. L. Bolger letter to V. Stello dated October 31, 1977.

(b):

T. R. Tramm letter to H. R. Denton dated June 14, 1982.

(c):

T. R. Tramm letter to H. R. Denton dated August 31, 1981.

(d):

T. R. Tramm letter to H. R. Denton dated May 4, 1982.

(e):

T. R. Tramm letter to H. R. Denton dated January 14, 1982.

(f):

T. R. Tramm letter to H. R. Denton dated January 12, 1982.

(g):

T. R. Tramm letter to H. R. Denton dated January 7, 1982.

Dear Mr. Denton:

This is to provide a revision to the Byron /Braidwood Fire Protection Report.

This revision is a complete update of the Byron /Braidwood Stations " Fire Protection Report in Response to Appendix A of BTP APCSB 9.5-1" transmitted to the NRC by reference (a).

The original report contained a detailed evaluation of the fire hazards to all areas of the plant, a description of fire protection features and a description of the fire protection program for the stations,

%b T

F PDR 5 %

PDR ADOCK 05000454

(

- l The current revision to the report is a general update of the initial report, taking into account all relevant design changes which have been incorporated subsequent to submittal of the original report.

In addition, new material has been added to the report in response to new NRC concerns.

In particular, the safe shutdown analysis submitted in reference (b) has been incorporated into the revised Fire Protection Report.

Tne comparision to 10CFR50 Appendix R transmitted with reference (c) has been updated and incorporated.

Several other fire protection related items transmitted in references (d), (e), (f) and (g) have also been incorporated into the revised report.

Formal fire protection questions, however, are included in the appropriate " Response to NRC Questions" volume of the FSAR.

Please direct questions regarding this report to this office.

One (1) signed orignal and thirty-nine (39) copies of this letter are provided for your review.

Forty (40) copies of the report are enclosed.

Very truly yours, f.#l T. R. Tramm Nuclear Licensing Administrator

Enclosure:

" Fire Protection Report in Response to Appendix A of BTB APCSB 9.5-1",

undated.

4768N

B/B BYRON /BRAIDWOOD STATIONS FIRE PROTECTION REPORT INSTRUCTIONS FOR UPDATING YOUR B/B FIRE PROTECTION REPORT To update your set (2 volumes) of the B/B Fire Protection Report, remove and destroy the following pages and figures and insert pages and figures as indicated.

REMOVE INSERT VOLUME 1 Title Sheet for Volume 1 Title Sheet for Volume 1 Master Table of Contents Sheet Master Table of Contents Sheet Pages i through xiv Pages i through xx Behind Tab

1.0 INTRODUCTION

Pages 1.0-1, 1.1-1 and 1.2-1 Pages 1.0-1, 1.1-1, and 1. 2-1 O.

Figures 1.2-1-and 1.2-2 Figures 1.2-1 and 1.2-2 Behind Tab 2.0 FIRE HAZARDS ANALYSIS Pages 2.1-1 through 2.1-12

'Pages 2.1-1 through 2.1-14 Pages 2.2-1 through 2.2-24 Pages.2.2-1 through 2.2-35 and Figures 2.2-1 through 2.2-30 Pages 2.3-1 through 2.3-202 Pages 2.3-1 through 2.3-222 All figures after page 2.3-202 Figures 2.3-0 through 2.3-2 (through end of Volume 1)

Figure 2.3-3 (4 Sheets)

Figures 2.3-4 through 2.3-7 Figure 2.3-8 (4 Sheets)

Figure 2.3-9 Figure 2.3-10 (4 Sheets)

Figure 2.3-11 Figure 2.3-12 (4 Sheets)

Figure 2.3-13 (2 Sheets)

Figure 2.3-14 (4 Sheets)

Figures 2.3-15 through 2.3-20 Figure 2.3-21 (2 Sheets)

Figure 2.3-22 (2 sheets)

Figure 2.3-23 (2 Sheets)

Figure 2.3-24 (2 Sheets)

Figure 2.3-25 (2 Sheets)

O' ;

Figure 2.3-26 (2-Sheets)

Figures 2.3-27-through 2.3-30 1

B/B

()

FIRE PROTECTION REPORT (Cont'd) i REMOVE INSERT 1

Figure 2.3-31 (2 Sheets) j Figure 2.3-32 Figure 2.3-33 (2 Sheets)

Figure 2.3-34 Figure 2.3-35 (2 Sheets)

Figure 2.3-36 (2 Sheets)

Figure 2.3-37 (2 Sheets)

Figure 2.3-37 (2 Sheets)

Figure 2.3-38 (2 Sheets)

Figures 2.3-39 and 2.3-40 i

VOLUME 2 Title Sheet for Vblume 2 Title Sheet for Volume 2 Master Table of Contents Sheet Master Table of Contents Sheet Pages i through xiv Pages 2.4-1 through 2.4-227

! /~'

Tab 3.0 GUIDELINES OF (New) Tab 3.0 GUIDELINES OF APPENDIX A BTP 9.5-1 4

Pages 3.1-1 through 3.1-8 Pages 3.1-1 through 3.1-11 Pages 3.2-1 through 3.2-6 Pages 3.2-1 through 3.2-4 Pages 3.3-1 through 3.3-3 Pages 3.3-1 through 3.3-6 Pages 3.4-1 through 3.4-13 Pages 3.4-1 and 3.4-2 Pages 3.5-1 through 3.5-8 Pages 3.5-1 through 3.5-14 Pages 3.6-1 through 3.6-22 Pages 3.6-1 through 3.6-8 Page 3.7-1 Pages 3.7-1 through 3.7-12 j

l Behind Tab 4.0 PROPOSED TECHNICAL SPECIFICATIONS REVISIONS Pages 4.0-1 through 4.0-3 Page 4.0-1 i

Behind Tab 5.0 APPENDICES Title Sheet for Appendix 5.1 Title Sheet for Appendix 5.1 i

Page AS.1-1 Page AS.1-1 Title Sheet for Appendix 5.2 Title Sheet for Appendix 5.2 Page AS.2-1 Page A5.2-1 i

Pages A5.2-1 through A5.2-15 Pages A5.2-1 through A5.2-15 l

Title Sheet for Appendix 5.3 Title Sheet for Appendix 5.3 Pages AS.3-1 through AS.3-16 Pages A5.3-1 through AS.3-6 l

(])

Title Sheet for Appendix 5.4 Title Sheet for Appendix 5.4 Pages A5.4-i through AS.4-iii Pages A5.4-i through AS.4-iii i

r 2

l I

B/B

(~}

FIRE PROTECTION REPORT (Cont'd)

REMOVE INSERT Pages AS.4-1 through AS.4-33 Pages A5.4-1 through A5.4-33 Figure M-28 (6 Sheets)

Figure M-28 (6 Sheets)

Figure M-52 (13 Sheets)

Figure M-52 (16 Sheets)

Figure M-58 (3 Sheets)

Figure M-58 (4 Sheets)

Title Sheet for Appendix 5.5 Title Sheet for Appendix 5.5 Pages A5.5-1 through A5.5-3 Pages AS.5-1 through AS.5-3 4

Title Sheet for Appendix 5.6 Title Sheet for Appendix 5.6 Pages for Regulatory Guide 1.120 Pages for Regulatory Guide 1.120 (June 1976)

(Rev. 1, November 1977)

Total 23 pages Total 29 pages Title Sheet for Appendix 5.7 Pages AS.7-1 through A5.7-23 l

O l

l l

l i

i i

i 3

-,