Interim Rept of Significant Const Deficiency 60 Re Turnover Documentation & Inadequate Hanger Weld Problems.Reinsp, Tompkins-Beckwith QA Audit & Retraining Program Will Be Completed by 830215
ML20062K683
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/06/1982
From: Debruin J, Hart J, Mclendon G, Milhiser R, Wills J
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0497, W3K-82-497, NUDOCS 8208170341
Download: ML20062K683 (4)


Text

.  :

142 DELARONDE STREET P O W E R & L 1 G H T! P O BOX 6008 . NEW OALEANS. LOUISlANA 70174

  • (504) 366-2345 FADOL E SOU T H UDUDES S(STEFA August 6, 1982 G D. McLENDON Senior Vice President W3K-8 2-0497 Q-3-A35.07.60 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000
\rlington, Texas 76012

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Interim Report of Significant Construction Deficiency No. 60

" Turnover Documentation and Inadequate Hanger Weld Problems"

Reference:

Telecon - R. Bennett (LP&L) to L. Martin (NRC) on July 19, 1982

Dear Mr. Collins:

In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Interim Report of Significant Construction Deficiency No. 60, " Turnover Documentation and Inadequate Hanger Weld Problems."

l l If you have any questions, please advise.

Very truly yours, I

C /g G.D. McLendon GDMcL/LLB/grf Attachment f cc: 1) Director l Office of Inspection & Enforcement -

7 U. S. Nuclear Regulatory Commission 0 <<m" f Washington, D. C. 20555 (with 15 copies of report) g g. - - -,j .

2) Director Office of Management l Information and Program Control II3*

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (with 1 copy of report) 8208170341 820806 PDR ADOCK 05000382 S PDR

LOUISl#M FGER S LIGiT CD/PANY VATERFORD STEA\1 ELECTRIC STATION - LNIT NO. 3 INTERIM REFORT OF slo 41FICANT CONSTNUCTION DEFICIEtCY to. 60 "TlRO/ER DOOfiNTATICN NO INAD8QLRTE HEER % ELD PRJBLEMS" Reviewed by: /

M.'J. Milbiser+- Site e vanager Date Reviewed by: f' J". L. Wilis 3roject Superintendent Uate Reviewed by: A /dsf 7

/ /2 N W// g 8 L K Hart -ProjecyLicensing Engineer Date Reviewed by: ,,[ [M fd/9A J Bruin - ESSE Project Engineer [ / Date Reviewed by: , Agf 8'2 -8 L Jf Gutiefre'z - Q. y Site Supervisor Date July 30,1982

INERIM REFORT OF SICNIFICANT GJNSTRUCTION DEFICIENCY NO. 60 "TWNDs/ER 000. MENTATION #D ltMDTlMTE HANGER VELD FFOBLEAS TO/a(INS-BEOGVITH" INIFIIJUCTION:

This report is sutmitied pursuant to 10CFR50.55(e). It describes Seismic I hangers installed by Torrpkins-Beckwith, Inc. which do not conply with design and installation drawings nor with MS requirements. The hangers were among those inspected and accepted by the Quality Control department of

> Tortpkins-Beckwith and were included in turnover packages for start-up systems released to the Ovner. This reflects a breakdown in the Quality Control / Qual i ty Assurance Programs of Tonpkins-Beckwi th, Inc. , Ebasco Services, Inc. and Louisiana Power and Light Conpany. This condition is considered reportable under the requirements of 10CFR50.55(e). To the best of our knowledge, this problem has not been reported to the Nuclear Regulatory Corrmission pursuant to 10CFR21.

DESCRIPTION:

Upon receipt of turnover documents for Start-Up System 60B - Low Pressure Safety injection, Louisiana Power S Light (LPSL) Q4 perfonned an audit of docunentation for hanger installations contained in the turnover package.

LP&L Q4 identifled nurnerous discrepancies which included: installation that was not in accordance with design docunents, welds called for on the design docunents/ detail drawings that do not meet AVS size requironents, field welds that were not made per requirements between the as-built drawings and actual construction. This condition indicates a breakdown of the Quality Assurance programs of Tonpkins-Beckwi th, Inc. , Piping Contractor, Ebasco Services, Inc. and Louisiana Power & Light C7npany in that the Tccpkins-Beckwith (T-B) turnover packages that were sutmitted contained discrepancies between the final Quality Assurance / Quality Control certification and the final actual construction.

SAFETY EVALLMTION:

The deficiencies frun accepted as-built hanger sketches as described herein occur on Seisnic Category I systems required to mitigate the consequences of an accident and bring the plant to a safe shutdown condition. Untii the extent of the deficiencies are known, it nust be assuned that they could detract fran the ability of these systems to perform their function under SSE condi tions.

GJRRECTIVE ETICN Corrective Action has been irrplemented as follavs:

(1) T-B has carpleted a retraining program with particular enphasis on as-buiit records for alI Hanger Engineering personneI and QuaIity Control inspectors to requalify them to properly perform the field inspections of pipe support / restraint and to carplete the necessary documentation.

(2) T-B Quality Control and Engineering have initiated a reinspection of approximately 4400 hangers which were cortpleted and accepted prior to July 6, 1982. NCR W3-4010 will be supplanented to track the disposition and '

corrective action taken for hangers found to have deviations from design requirements which were corrpleted and accepted prior to July 6,1982. Any rework required will be noted on NCR W3-4010 which shall then be returned to T-B for their action.

(3) Presently speci fied fillet weld sizes meet structural design requirenents.

Havever, in order to verify the adequacy of the specifled weld size, T-B shall quali fy existing prequalified AhS fillet weld procedures to verify the acceptabiiity of performing trultipass fiilet weIds using smalI diameter esectrodes. Rese qualified procedures wili verify the acceptability of specifying and welding fillet weld sizes smaller than AWS allowables.

(4) A Torrpkins-Beckwith Quality Assurance Audit is undenvay to inspect a sartple lot of hangers to veri fy that the reinspection and future inspections are perfonned properly.

(5) Ebasco Services incorporated has carpleted a retraining program for Quality Assurance personnel involved in the review of piping hanger docurentat ion.

Corrective action will be carpleted by February 15, 1983 and a Final Report will be subnitted to the PRC at that time.