Interim Deficiency Rept Re Unsatisfactory Insps Performed by Former Field QC Inspector.Initially Reported on 820329. Re-evaluation of Insps in Progress.Next Rept Will Be Provided by 820930
ML20062K356
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/09/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-43, NUDOCS 8208170137
Download: ML20062K356 (1)


Text

-

GULF STATES UTILITIES COMPANY-H E.A U M o N T.

TEXAS 77704 POST OFFICC dor 295I AREA CODE 713 838-6631 August 9, 1982 RBG-13,165 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator 3 ]hj h/ [ D U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement s

611 Ryan Plaza Drive, Sufto 1000

$ I l lE Arlington, Texas 76011 l

t.

Dear Mr. Collins:

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-43 On March 29, 1982, Gulf States Utilities Company (GSU) notified the Nuc1 car Regulatory Commission Region IV Office of a condition potentially reportable under 10CFR50.55(c) concerning unsatisfactory inspections performed by a former Field Quality Control (FQC) inspector at River Bend Station (DR-43). Our reevaluation of the inspections performed by the former FQC inspector is continuing. An interim or final status report will be provided by September 30, 1982.

Sincerely,

/

  • J. E. Booker Manager-Engineering & Licensing River Bond Nuclear Group JEB/

kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission (NRC Personne!)

Washington, D. C. 20555

  • 8" "

i EM0W:

2 AUG 1 1 198?

8208170137 820809 gDRADOCK 05000458 PDR