ML20062J803
| ML20062J803 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 11/09/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20062J806 | List: |
| References | |
| GL-89-10, NUDOCS 9311170330 | |
| Download: ML20062J803 (3) | |
See also: IR 05000213/1993015
Text
.
.
Db
L
-
^
~
9 1993
-
.
!
Docket No. 50-213
,
Mr. John F. Opeka
Executive Vice President - Nuclear
j
Connecticut Yankee Atomic Power Company
P.O. Box 270
Hartford, Connecticut 06141-0270
.
Dear Mr. Opeka:
SUBJECT: INSPECTION REPORT NO. 50-213/93-15
,
3
This refers to the safety inspection conducted by Messrs. P. Drysdale and M. Buckley of this
office on July 26 - 30,1993, at Haddam, Connecticut, and on August 2 - 13 and
October 18, 1993, at the NRC Region I office in King of Prussia, Pennsylvania. The results
,
of this inspection were discussed with Mr. J. Stetz of your staff at the conclusion of the
,
onsite inspection. Additional clarifications were provided to the inspectors subsequent to the
a
inspection. The findings from these additional reviews were discussed with you dering a
telephone discussion on October 28,1993.
Areas important to public health and safety were examined during this inspection and are
,
described in the 'NRC Region I inspection report 'which is enclosed with this letter.- Within
l
these areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel and observations by the inspectors. The
inspectio.n focused on your Motor-Operated Valve (MOV) program and the implementation
of program enhancements developed in response to previous NRC inspections in this area.
-
The NRC uses program implementation inspections to confirm continued progress towards
the scheduled program completion date and to assure satisfactory implementation of your
!
commitments and regulatory requirements. With the exception of the unresolved item
j
discussed in paragraph 3.1 of the enclosed report, our inspectors found your progress toward
i
the MOV program implementation to be satisfactory.
No response to this letter is required. Your cooperation with us in this matter is appreciated.
I
Sincerely,
i
U101% D1 E l "
.!
Jacque P. Durr, Chief
170045
Engineering Branch
Division of Reactor Safety
Enclosure: Inspection Report No. 50-213/93-15
'
/f'
n
9311170330 931109
1
l
ADOCK 05000213
G
gjf
-
.
4-
peaw-
A
2-
+e
e
m
.
.
.
- NOV
9 1993
.
'
!
f
~
.
.
Mr. John F. Opeka
2
{
!
cc w/ encl:
W. D. Romberg, Vice President, Nuclear, Operations Services
l
J. P. Stetz, Vice President, Haddam Neck Station
S. E. Scace, Vice President, Millstone Station
l
J. Solymossy, Director, Nuclear Quality and Assessment Services
i
D. J. Ray, Unit Director
R. M. Kacich, Director, Nuclear Licensing
Gerald Garfield, Esquire
Nicholas Reynolds, Esquire
K. Abraham, PAO (2)
!
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
j
NRC Resident Inspector
i
State of Connecticut SLO
i
!
,
i
l
.
!
-
.
.-
.
.
.
-
,
t40V
9 1993
!
,
.
,
Mr. John F. Opeka
3
bec w/ encl:
Region I Docket Room (with concurrences)
{
i
Sec w/enci (VIA E-MAIL):
l
J. Stolz, NRR/PD I-4
V. McCree, OEDO.
!
9
T. Sullivan, NRR
j
T. Scarbrough, NRR
j
J. Norberg, NRR
!
T. Westerman, RIV
i
J. Jacobson, RIII
F. Jape,. RII
W. Ang, RV
,
\\
,
,
!
!
'
i
i
)
I
O
'
1:DRS
RI:DRS
uG:NRR
1
Drysdale
Eapen
Durr
10/l/93
10/y93
11/f/93
11/ /93
OFFICIAL RECORD COPY
A:HN9315. INS
_
i