Forwards Insp Rept 50-213/93-15 on Stated Dates. W/Exception of Unresolved Item Discussed in Paragraph 3.1 of Insp Rept,Progress Toward MOV Program Implementation Satisfactory
ML20062J803
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/09/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20062J806 List:
References
GL-89-10, NUDOCS 9311170330
Download: ML20062J803 (3)


See also: IR 05000213/1993015

Text

.

.

Db

L

-

^

~

NOV

9 1993

-

.

!

Docket No. 50-213

,

Mr. John F. Opeka

Executive Vice President - Nuclear

j

Connecticut Yankee Atomic Power Company

P.O. Box 270

Hartford, Connecticut 06141-0270

.

Dear Mr. Opeka:

SUBJECT: INSPECTION REPORT NO. 50-213/93-15

,

3

This refers to the safety inspection conducted by Messrs. P. Drysdale and M. Buckley of this

office on July 26 - 30,1993, at Haddam, Connecticut, and on August 2 - 13 and

October 18, 1993, at the NRC Region I office in King of Prussia, Pennsylvania. The results

,

of this inspection were discussed with Mr. J. Stetz of your staff at the conclusion of the

,

onsite inspection. Additional clarifications were provided to the inspectors subsequent to the

a

inspection. The findings from these additional reviews were discussed with you dering a

telephone discussion on October 28,1993.

Areas important to public health and safety were examined during this inspection and are

,

described in the 'NRC Region I inspection report 'which is enclosed with this letter.- Within

l

these areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel and observations by the inspectors. The

inspectio.n focused on your Motor-Operated Valve (MOV) program and the implementation

of program enhancements developed in response to previous NRC inspections in this area.

-

The NRC uses program implementation inspections to confirm continued progress towards

the scheduled program completion date and to assure satisfactory implementation of your

!

commitments and regulatory requirements. With the exception of the unresolved item

j

discussed in paragraph 3.1 of the enclosed report, our inspectors found your progress toward

i

the MOV program implementation to be satisfactory.

No response to this letter is required. Your cooperation with us in this matter is appreciated.

I

Sincerely,

i

U101% D1 E l "

.!

Jacque P. Durr, Chief

170045

Engineering Branch

Division of Reactor Safety

Enclosure: Inspection Report No. 50-213/93-15

'

/f'

n

9311170330 931109

1

l

PDR

ADOCK 05000213

G

PDR

gjf

-

.

4-

peaw-

A

2-

+e

e

m

.

.

.

- NOV

9 1993

.

'

!

f

~

.

.

Mr. John F. Opeka

2

{

!

cc w/ encl:

W. D. Romberg, Vice President, Nuclear, Operations Services

l

J. P. Stetz, Vice President, Haddam Neck Station

S. E. Scace, Vice President, Millstone Station

l

J. Solymossy, Director, Nuclear Quality and Assessment Services

i

D. J. Ray, Unit Director

R. M. Kacich, Director, Nuclear Licensing

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

!

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

j

NRC Resident Inspector

i

State of Connecticut SLO

i

!

,

i

l

.

!

-

.

.-

.

.

.

-

,

t40V

9 1993

!

,

.

,

Mr. John F. Opeka

3

bec w/ encl:

Region I Docket Room (with concurrences)

{

i

Sec w/enci (VIA E-MAIL):

l

J. Stolz, NRR/PD I-4

V. McCree, OEDO.

!

A. Wang, PM, NRR

9

T. Sullivan, NRR

j

T. Scarbrough, NRR

j

J. Norberg, NRR

!

T. Westerman, RIV

i

J. Jacobson, RIII

F. Jape,. RII

W. Ang, RV

,

\\

,

,

!

!

'

i

i

)

I

O

'

1:DRS

RI:DRS

uG:NRR

1

Drysdale

Eapen

Durr

10/l/93

10/y93

11/f/93

11/ /93

OFFICIAL RECORD COPY

A:HN9315. INS