Second Interim Rept of Significant Const Deficiency 55 Re Holdup & Boric Acid Makeup Tanks W/Incorrect Structural Calculations.Submittal of Final Rept Delayed Until 821215
ML20062H821
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/05/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3K-82-0480, W3K-82-480, NUDOCS 8208160175
Download: ML20062H821 (1)


Text

LaulSIANA POWER & L1GHT 442 ouAnoNoe Sinu 1 p o sox caos . NEW OALEANS LOUIS!ANA 70174 . (504) 366 2345 S

Ui20i!srsVIU l.ugust 5, 1982 G D. McLENDON Senior Vice President W3K-82-0480 Q-3-A35.07.55 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission ] y 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 ) sky f

' ~

SUBJECT:

Waterford SES Unit No. 3 9/g Docket No. 50-382 [b i Significant Construction Deficiency No. 55

" Hold Up and Boric Acid Make Up Tanks h

Incorrect Structural Calculations J Second Interim Report

Reference:

LP6L Letter W3K-82-0284 to NRC dated May 18, 1982

Dear Mr. Collins:

We are unabic to complete the corrective action on Significant Construction De'iciency No. 55 necessary to submit the Final Report by August 2, 1982.

The amount of rework required to complete the corrective action and the documentation review will be accomplished by December 15, 1982 at which time the Final Report on Significant Construction Deficiency No. 55 will be submitted.

If you have any questions, please advise.

Very .ruly yours, CDMcL/LLB/grf Pw/g G.D. McLendon ec: 1) Director Of fice of Inspection & Enforcement i U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l 2) Director Office of Management

},-])

l Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8208160175 820805 PDR ADOCK 05000382 S PDR