LaulSIANA 442 ouAnoNoe Sinu 1 POWER & L1GHT p o sox caos. NEW OALEANS LOUIS!ANA 70174. (504) 366 2345 Ui20i!srsVIU S
l.ugust 5, 1982 G D. McLENDON Senior Vice President W3K-82-0480 Q-3-A35.07.55 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission
]
y
) sky 611 Ryan Plaza Drive, Suite 1000 f
' ~
Arlington, Texas 76012
[b 9/g
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 ih Significant Construction Deficiency No. 55
" Hold Up and Boric Acid Make Up Tanks Incorrect Structural Calculations J
Second Interim Report
Reference:
LP6L Letter W3K-82-0284 to NRC dated May 18, 1982
Dear Mr. Collins:
We are unabic to complete the corrective action on Significant Construction De'iciency No. 55 necessary to submit the Final Report by August 2, 1982.
The amount of rework required to complete the corrective action and the documentation review will be accomplished by December 15, 1982 at which time the Final Report on Significant Construction Deficiency No. 55 will be submitted.
If you have any questions, please advise.
Very.ruly yours, Pw/g G.D. McLendon CDMcL/LLB/grf ec:
- 1) Director Of fice of Inspection & Enforcement i
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l
- 2) Director
},-])
l Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8208160175 820805 PDR ADOCK 05000382 S