Category:NOTICE OF DEVIATION/NONCONFORMANCE FROM A REGULATORY
MONTHYEARML20062H5741990-11-27027 November 1990 Notice of Deviation from Insp on 900813-1009.Deviation Noted:Spent Fuel Pool a Level Instrumentation Channel Equipment Rendered Inoperable by Removal of Power Source ML20215M4861986-10-23023 October 1986 Notice of Deviation from Insp on 860909-12 1990-11-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000271/19990111999-10-0707 October 1999 Insp Rept 50-271/99-11 on 990809-27.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000271/19990061999-09-13013 September 1999 Insp Rept 50-271/99-06 on 990621-0801.Noncited Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20211H0891999-08-19019 August 1999 Notice of Violation from Insp on 990628-0811.Violation Noted:Periodic Assessment Conducted for Period of November 1996 Through May 1998 Did Not Adequately Evaluate Maint Activities as Listed IR 05000271/19990121999-08-19019 August 1999 Insp Rept 50-271/99-12 on 990628-0811.Violation Noted.Major Areas Inspected:Maint Rule Periodic Evaluation Required by 10CFR50.65(a)(3) IR 05000271/19990051999-07-26026 July 1999 Insp Rept 50-271/99-05 on 990510-0620.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000271/19990031999-06-14014 June 1999 Insp Rept 50-271/99-03 on 990329-0509.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance,Plant Support & Review of Maint Rule Program Implementation IR 05000271/19990041999-06-0404 June 1999 Insp Rept 50-271/99-04 on 990426-28.No Violations Noted. Major Areas Inspected:Performance of Emergency Response Organization IR 05000271/19993021999-05-28028 May 1999 NRC Operator Licensing Exam Rept 50-271/99-302(including Completed & Graded Tests) for Tests Administered on 990510-11 IR 05000271/19990021999-05-0606 May 1999 Insp Rept 50-271/99-02 on 990215-0328.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000271/19990011999-03-16016 March 1999 Insp Rept 50-271/99-01 on 990104-0214.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support Re Security Procedures ML20202G2781999-01-28028 January 1999 Insp Rept 50-271/98-14 on 981122-990104.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000271/19980131998-12-23023 December 1998 Insp Rept 50-271/98-13 on 981011-1121.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000271/19980121998-11-10010 November 1998 Insp Rept 50-271/98-12 on 980830-1010.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support PNO-I-98-048, on 981016,Vermont Yankee Commenced Normal Plant Shutdown,Due to Increasing Steam Leakage from Instrumentation Line on Main Steam High Pressure Drain Sys in Steam Tunnel.Outage Expected to Last Several Days1998-10-16016 October 1998 PNO-I-98-048:on 981016,Vermont Yankee Commenced Normal Plant Shutdown,Due to Increasing Steam Leakage from Instrumentation Line on Main Steam High Pressure Drain Sys in Steam Tunnel.Outage Expected to Last Several Days IR 05000271/19980111998-09-30030 September 1998 Insp Rept 50-271/98-11 on 980719-0829.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000271/19980991998-08-28028 August 1998 SALP Rept 50-271/98-99 for Vermont Yankee Nuclear Power Station for Period of 970119-980718 IR 05000271/19980101998-08-14014 August 1998 Insp Rept 50-271/98-10 on 980614-0718.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000271/19980801998-07-24024 July 1998 Corrected Page 23 for Insp Rept 50-271/98-80 Issued on 980716.Section E8.2 Was Amended in Order to Be More Consistent W/Findings Documented in Other Sections of Rept & to More Clearly Reflect NRC Conclusion Re LER 98-005 ML20236Q8801998-07-16016 July 1998 Notice of Violation from Insp on 980518-0605.Violation Noted:In 1996,SE Performed by Licensee to Support Temporary Mod to MCR HVAC Sys,Did Not Provide Sufficient Basis to Determine That Change Did Not Involve USQ ML20236Q8831998-07-16016 July 1998 Insp Rept 50-271/98-80 on 980518-0605.Violations Noted.Major Areas Inspected:Aspects of Licensee Engineering & Technical Support Operations as They Pertain to C/A Program,Se & Core Engineering Programs & Processes IR 05000271/19980091998-07-10010 July 1998 Insp Rept 50-271/98-09 on 980609-19.Violations Noted.Major Areas Inspected:Personnel Actions & Equipment Response Associated w/980609 Event,In Which There Was Rv High Level Water Level Turbine Trip & Reactor Scram ML20236P9751998-07-10010 July 1998 Notice of Violation from Insp on 980610-0619.Violations Noted:As of 980609,Procedure Ot,Reactor High Level,Rev 9, Did Not Direct or Alert Operators to Place RFW Pump Breaker Control Switches in Pull to Lock to Prevent Start IR 05000271/19980061998-07-0202 July 1998 Insp Rept 50-271/98-06 on 980407-0521.Violations Noted.Major Areas Inspected:Aspects of Licensee Engineering & Technical Support Operations Pertaining to Basis for Maint Operations Process ML20236M2321998-07-0202 July 1998 Notice of Violation from Insp on 980407-0521.Violation Noted:On 970320,licensee Identified That EOPs Directed Operators to Flood Containment to Top of Active Fuel ML20236L3371998-07-0101 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:In March 1992,Standby Gas Treatment Sys Fans & Associated Electrical Circuit Breakers Replaced & Not Adequately Translated Into Procedures IR 05000271/19980081998-07-0101 July 1998 Insp Rept 50-271/98-08 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint,Plant Support,Insps by Regional Radiation Protection, Emergency Preparedness & Fire Protection Specialists PNO-I-98-021, on 980609,automatic Reactor Scram Occurred. Except for Single Control Rod Position Indication Problem, Initial Plant Response to Scram Expected.Licensee Initiated Investigation to Understand Causes of Event Complications1998-06-0909 June 1998 PNO-I-98-021:on 980609,automatic Reactor Scram Occurred. Except for Single Control Rod Position Indication Problem, Initial Plant Response to Scram Expected.Licensee Initiated Investigation to Understand Causes of Event Complications ML20249A1191998-06-0404 June 1998 Notice of Violation from Insp on 980315-0502.Violation Noted:Entrance Pathway to Reactor Bldg Vital Area Was Identified That Was Neither Locked Nor Guarded IR 05000271/19980041998-06-0404 June 1998 Insp Rept 50-271/98-04 on 980315-0502.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support Re Unmonitored Access Into Reactor Bldg Vital Area ML20217B3781998-04-14014 April 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:In 1982,licensee Failed to Control Design Interfaces & Failed to Assure That Design Basis for Max Torus Temp Normal Limit,Correctly Translated ML20216F8661998-04-13013 April 1998 Notice of Violation from Insp on 980316-19.Violation Noted: on 980317 During Performance Testing of Protected Area Intrusion Detection Sys,Number of Climbing Attempts,In Multiple Locations,Not Detected That No Alarm Was Generated ML20216F9081998-04-13013 April 1998 Insp Rept 50-271/98-05 on 980316-19.Violations Noted.Major Areas Inspected:Selective Exam of Procedures & Representative Records,Interviews W/Personnel,Performance Tests of Security Equipment & Observations by Inspectors IR 05000271/19980011998-04-13013 April 1998 Insp Rept 50-271/98-01 on 980125-0314.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20247M2441998-04-0909 April 1998 EN-98-021:on 980414,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Problem Involving TS Limit for Max Torus Operating Temp Being Inconsistent W/Plant Design Basis IR 05000271/19970121998-03-0303 March 1998 Insp Rept 50-271/97-12 on 971207-980124.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216A9921998-03-0303 March 1998 Notice of Violation from Insp on 971207-980224.Violation Noted:Hpci Room App a Fire Barrier Was Found to Be Inoperable on 970113 & Door Would Not Close IR 05000271/19980021998-02-20020 February 1998 NRC Operator Licensing Exam Rept 50-271/98-02OL on 980210. Exam Results:Applicant Passed Simulator Retake Exam & Issued SRO License ML20202D3361998-02-0505 February 1998 Notice of Violation from Insp on 970929-1120.Violation Noted:Prior to 950420,licensee Failed to Assure That Test Instruments Used in RHR Heat Exchanger Performance Testing Were Adequate to Assure Test Requirements Were Satisfied ML20202D3431998-02-0505 February 1998 Insp Rept 50-271/97-10 on 970929-1120.Violations Noted.Major Areas Inspected:Engineering & Technical Support Operations IR 05000271/19970111997-12-23023 December 1997 Insp Rept 50-271/97-11 on 971031-1206.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 07100031/20120061997-12-23023 December 1997 Notice of Violation from Insp on 971031-1206.Violation Noted:Plant Auxiliary Operators Implemented Unapproved Vermont Electric Power Co Switching Order on 971125 to Open 345 Kv Scobie Line 379-3 ML20202E7091997-11-28028 November 1997 Insp Rept 50-271/97-08 on 970907-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199J4021997-11-22022 November 1997 NRC Operator Licensing Exam Rept 50-271/97-09 for Tests Administered on 970902-04.Two of Four Applicants Passed.One SRO Upgrade Applicant Failed Written & Operating Portion of Exam & One SRO Failed Operating Portion of Exam IR 05000271/19970801997-10-16016 October 1997 Insp Rept 50-271/97-80 on 970728-0822.No Violations Noted But Exercise of Discretion Was Issued to Ack Effort to Correct Violation.Major Areas Inspected:Review of Fire Protection & Engineering ML20217E7011997-10-0101 October 1997 Notice of Violation from Insp on 970720-0906.Violation Noted:Vermont Yankee Staff Failed to Correct Condition Adverse to Quality Involving Standby Gas Treatment Sys over-pressure Vulnerability IR 05000271/19970061997-10-0101 October 1997 Insp Rept 50-271/97-06 on 970720-0906.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering, Maintenance,& Plant Support IR 05000271/19970071997-09-0404 September 1997 Insp Rept 50-271/97-07 on 970826.No Violations Noted.Major Areas Inspected:Licensee Access Authorization Program ML20210R0151997-08-27027 August 1997 Design Insp Rept 50-271/97-201 on 970505-0613.No Violations Noted.Major Areas Inspected:Lpci & RHRSW Sys PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997 PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR ML20210S0171997-08-19019 August 1997 Notice of Violation from Insp on 970601-0719.Violation Noted:Reactor Was Placed in Run Mode on 970507,but Atmosphere Oxygen Concentration in Torus Air Space Remained Greater than Four Percent Until Morning of 970512 1999-09-13
[Table view] |
Text
.
l .
APPENDIX B NOTICE OF DEVIATION Vermont Yankee Nuclear Power Corporation Docket No. 50-271 Vermont Yankee Nuclear Power Station License No. DPR-28 During a routine NRC inspection conducted on August 13 - October 9,1990, a deviation of the licensee's written commitment of May 3,1985 was identified, in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1990), the deviation is listed below.
Vermont Yankee Nuclear Power CorIx> ration letter to the NRC, dated May 3,1985, stated that it is the policy of Vermont Yankee's corporate management that all equipment and components which are addressed by Vermont Yankee's Environmental Qualification (EQ) program shall be maintained operable ard fully environmentally qualified at all times, commensurate with the status of the plant. In addition, the licensee committed that whenever safety class equipment or components which are EQ but are not covered by Vermont Yankee Technical Specifications fail (cre not operable), a Nonconformance Report shall be generated with disposition of the discrepancy provided within 30 days.
Contrary to the above, on July 5,1989, the "A" Spent Fuct Pool level instrumentation channel equipment (safety class and addressed by Vermont Yankee's EQ program) was made inoperable by the removal of its power source. This condition remained until July 3,1990, and a Nonconformance Report had not been r,enerated to disposition the discrepancy.
Please provide to the U.S. Nuclear Regulatory Commission, ATTN: Document control Desk, Washington, D.C.,20555, with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector, in writing within 30 days of the date of this Notice, the reason (s) for the deviation, the corrective steps which have been taken and the results achieved, the corrective' steps which will be taken to avoid further deviations, and the date when your corrective action will be completed. Where good cause is shown, consideration will be given to extending the response time.
Under the Paperwork Reduction Act of 1980, PL 96-511, the response directed above is not subject to clearance by the Office of Management r / Budget.
.g'[0MN $b /i o