Interim Significant Const Deficiency Rept 38 Re Startup Test Control,Flooding of Emergency Diesel Generator Control & Relay Panel.Final Rept Expected by 820910
ML20062H433
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/05/1982
From: Mclendon G
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, W3R-82-0481, W3R-82-481, NUDOCS 8208160046
Download: ML20062H433 (1)


Text

I OUISIANA f ,42 octAnoNoe sine n POWER & LIG HT/ P O BOX 6008

  • NEW OPLEANS. LOUIStANA 70174 * (504) 366-2345 us0$sEs$ August 5, 1982 G. D. McLENDON Senior Vice President W3K-82-0481 Q-3-A35.07.38 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission .

bhbbhh t

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 l

, l

SUBJECT:

Waterford SES Unit No. 3 #E 9122 .!  !

Docket No. 50-382 ' '

! sj Significant Construction Deficiency No. 38

" Start-Up Test Control; Flooding of Emergency Di> col Generator Control and Relay Panel" Third Interim Report

Reference:

LP&L Letter W3K-82-0414 to NRC dated July 14, 1982

Dear Mr. Collins:

The Final Report on Significant Construction Deficiency No. 38 was to be submitted on August 16, 1982. We are unable to meet this date.

The replacement panels for the Emergency Diesel Generator are presently being installed. Completion of the corrective action and the reivew of the supporting documentation will be accomplished to allow the submittal of the Final Report of Significant Construction Deficiency No. 38 by September 10, 1982.

If you have any questions, please advise.

Very truly yours, GDMcL/LLB/grf Or?4e/f cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

2) Direc to r Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 8208160046 820805 PDR ADOCK 05000382 S PDR