Text
I OU1SIANA f 24a OcanONOe s1nar POWER & L1GH T/ P O BOX 6008
- NEW ORLEANS. LOUIStANA 70174 * [SO4) 366 2345
$t $tS SYSYE August 5, 1982 G D. McLENDON Senior Vice President W3K-82-0482 Q-3-A35.07.37 Mr. John T. Collins, Regional Administrator, Region IV
@ gpg %,
U. S. Nuclear Regulatory Commission l
i'
^
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 g
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 37
" Temperature Detectors (RTD's) Failure" Fourth Interim Report
Reference:
LP&L Letter W3K-82-0352 to NRC dated June 17, 1982
Dear Mr. Collins:
Due to work requirements necessary to complete the corrective action, we will be unable to submit the Final Report on Significant Construction Deficiency No. 37 on the connitted date of August 6,1982.
The balance of the replacement resistive temperature detectors (RTD's) are scheduled for arrival on site in the very near future. Scheduling the instal-lation of the RTD's to complete the corrective action, and reviewing the documentation supporting the activity will be completed by November 5, 1982, at which time the Final Report on Significant Construction Deficiency No. 37 will be submitted.
If you have any questions, please contact us.
Vehrytrulyyours,Gr?G /f G.D. McLendon GDMcL/LLB/grf cc:
- 1) Director Office of Inspection & Enforcement
' ],
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 7Y
- 2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 WOB160023 820805 PDR ADOCK 05000382 S