ML20062H345
| ML20062H345 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/05/1982 |
| From: | Hairston G ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20062H342 | List: |
| References | |
| NUDOCS 8208160021 | |
| Download: ML20062H345 (4) | |
Text
-
t OPERATING DATA REPORT DOCKET NO.
5n-laR l
DATE 8-5-82
- g CO%1PLETED HW_
C.
Hairston,II TELEPliONE (2D5) R49-5156 I
OPERATING STATUS
- 1. Unit Name: Joseph M.
Farley - Unit 1 Note $
1)
Cumulative data 3
- 2. Reporting Period:
.Tuly, 14R7 since 12/01/77, date of
- 3. Licensed Thetmal Power (5tWil:
2652 commercial operation.
860
- 4. Nameplate Rating (Gross SlWe):
829
- 5. Design Electrical Rating (Net alWe):
044*b
- 6. Stasimum Dependable Capecity (Gross htWe):
803.6 i
- 7. Stasimum Dependable Capacity (Net $1We):
- 8. If Changes Occur in Capacity Ratings (Itenn Number 3 Through 7) Since Last Report,Gise Reasons:
N/A
)
- 9. Power Lesel To Which Restricted,'I Any (Net blWe):
N/A N/A
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Date Cumulatise i
744 5087-40,895
- 11. Ifours in Reporting Period
- 12. Number Of Ilours Reactor Was Critical 744 3586.1 24,567.9
- 13. Reactor Resene Shutdobn llours 0
36.6 3,528.6
- 14. Iloms Generator On-Line
'7 4 a 1997 23.726.7
- 15. Unit Resene Shutdown liours 0
0 0
- 16. Grow Thermal Energy Generated (%lWil) 1.968.060 8.577,026 59,521,937
- 17. Gross Electrical Energy Generated (SlWil) 618.,21_4..,
2,697,154 18,934,106 587,764 2,529,854 17,753,578
- 18. Net Electrical Energy Generated ( AlWill 100.0 66.8 58.0
- 19. Unit Senice Factor 100.0 66.8 58.0
- 20. Unit Asailability Factor 9R_3 61.9 54.0
- 21. Unit Capacity Factor IUsing 51D0 Net) 95.3 60.0 52.4
- 22. Unit Capacity Factor (Using DE'i Net) 0.0 32.9 20.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nes! 6 hionthslType.Date.and Duration of Eacht:
N/A N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed 8/6/77 8/9/77 INill \\ L CRITICALITY 8/20/77 8/18/77 INillTI. ELEC TRICITY 12/1/77 12/1/77 CONT %1ERCI A L OPER ATION
/
P8/77) 8208160021 820811 PDR ADOCK 05000348 R
,2.___....
DOC}'ll fiO. _50-348 U;4tT 1
1'm DALE __ 8-05-82
)
COSIPLETED DY W-G-
Ha1vnton,II)
/
1ELLPilONE
_( ? f1M R44-5156
.t!ONTil July DAY AVERAGE D AILY POWER LEVEL DAY AVERAGDD.tII.Y ff)hEit LEVEL (MWeNc0 t'.n e-Neo 784 37 791 g,
786 1:1 7on 2
19 796 3
785 20 797 4
7n3 3'-
788 5
787_
790 m
6 789 793 7
719 23 794 24 g
788 793 25 7
_7gp 26 790 f
10 74) 27 787
- II 790 792 79R 23
}2 795 I
799
- 9 r3 794 796 30 1.g 74'4 JI
^
746 15 i
746 16 l-INSmUf!IIONS On this fornut. list the simge daily unit power levelin MWe Net for each d:y in the reporting inonth. Coinpu
, the nesse.t whole nu ;r-att.
m
'1 D
4 e
9
s
^
UNIT SilOTDOWNS AND POWER REDUCHONS DOCKET NO. 50-3 4 8 UNITNAME T M_
Pavlov-Unitl DATE n-M-82 REPORT MONTil July, 1982 COMPLETED BY W -
G-Hairston,III TELEPilONE (205) 899-5156 1
"h*L
.! ?
3 Ek Licensee Ev Cause & Corrective No-Date g
3g 5
,g g 5 Event 55 E.'8 Action to N0
$U Picvent Recurrence
$ 2.,
5
~ 5; =
Report #
u u
e 6
NO
, UNIT SHUTDOWL S OR POWER REDUC 3 IONS IN JULY 1982 1
I 2
3 4
F: Forced Reasoin Method:
Exhibit G nstructions S. Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data 1
B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Repost (LER) File (NUREG-D Regulatory Restriction 4 Other (Explain) 0161i E-Operator Training & Ucense Examination F-Admimst rative 5
4 G-Opes ational Ee ror (Explain)
E.shibit I Same Source (9/77)
Il-Other (E xplain) 9
h Monthly Operating Report (for July 1982) i August 11, 1982 4
bc:
Mr. J. M. Farley Mr. W. O. Whitt Mr. R. P. Mcdonald Mr. H. O. Thrash Mr. W. G. Hairston Mr. O. D. Kingsley f
Mr. M. L. Stoltz Ms. S. N. Knight l
Mr.
J. M. Elliott Mr. J. C. Miller Mr. J. R. Crane Mr. L. B. Long Mr.
N. M. Horsley Ms. Sylvia Schoel Mr. W. L. Lavallee INP0 Records Center File:
91A2.01 l
1 I
i l
i I
i t
I 4
i 4
(
.