MONTHYEARML20150B9081988-02-26026 February 1988 Notice of Violation from Insp on 871216-18.Violation Noted: Failure to Follow Procedures for Warehouse Storage,Maint Not Performed for Fire Protection Motors & Vendor Specified Maint Not Implemented on Site PM Program IR 05000520/20060141985-08-13013 August 1985 Notice of Violation from Insp on 850520-0614 IR 05000520/20070111985-08-12012 August 1985 Notice of Violation from Insp on 850520-0711 IR 05000521/20060201985-08-0202 August 1985 Notice of Violation from Insp on 850521-0620 IR 05000521/20060241985-07-23023 July 1985 Notice of Violation from Insp on 850521-0624 IR 05000518/20060151985-07-11011 July 1985 Notice of Violation from Insp on 850518-0615 IR 05000520/20060101985-07-0808 July 1985 Notice of Violation from Insp on 850520-0610 ML20062G9271978-12-15015 December 1978 Notice of Violation from Insp on 781127-30 1988-02-26
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20150B9081988-02-26026 February 1988 Notice of Violation from Insp on 871216-18.Violation Noted: Failure to Follow Procedures for Warehouse Storage,Maint Not Performed for Fire Protection Motors & Vendor Specified Maint Not Implemented on Site PM Program IR 05000518/19870011988-02-12012 February 1988 Insp Rept 50-518/87-01 on 871216-18.Violations Noted.Major Areas Inspected:Warehouse Storage,Preventive Maint,Record Storage & Adequacy & Followup to Employee Concerns IR 05000518/19860011986-08-0606 August 1986 Insp Repts 50-518/86-01 & 50-520/86-01 on 860717-18.No Violation or Deviation Noted.Major Areas Inspected:Storage & Maint of safety-related Equipment IR 05000528/19850341985-11-26026 November 1985 Insp Repts 50-528/85-34 & 50-529/85-34 on 850927-28 & 0930-1004.No Violation or Deficiencies Noted.Major Areas Inspected:Emergency Preparedness Program,Including Emergency Plan Training,Emergency Facilities & Equipment IR 05000520/20060141985-08-13013 August 1985 Notice of Violation from Insp on 850520-0614 IR 05000520/20070111985-08-12012 August 1985 Notice of Violation from Insp on 850520-0711 IR 05000521/20060201985-08-0202 August 1985 Notice of Violation from Insp on 850521-0620 IR 05000521/20060241985-07-23023 July 1985 Notice of Violation from Insp on 850521-0624 IR 05000518/20060151985-07-11011 July 1985 Notice of Violation from Insp on 850518-0615 IR 05000520/20060101985-07-0808 July 1985 Notice of Violation from Insp on 850520-0610 IR 05000518/19820091982-07-16016 July 1982 IE Insp Repts 50-518/82-09,50-519/82-08,50-520/82-09 & 50-521/82-08 on 820601-04 & 28-30.No Noncompliance Noted. Major Areas Inspected:Seismic Category 1 Concrete,Open Items & Site Deferral Preparation IR 05000518/19820071982-06-17017 June 1982 IE Insp Repts 50-518/82-07,50-519/82-07,50-520/82-07 & 50-521/82-07 on 820503-14 & 21-28.No Noncompliance Noted. Major Areas Inspected:Seismic Category 1 Concrete,Open Items,Independent Insp Effort & Site Deferral Preparation ML20062G9271978-12-15015 December 1978 Notice of Violation from Insp on 781127-30 IR 05000518/19780131978-11-0202 November 1978 IE Inspec Repts 50-518/78-13, 50-519/78-13, 50-520/78-13 & 50-521/78-13 on 781010-11 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Constr Activities & Independent Inspec IR 05000518/19780111978-10-26026 October 1978 IE Inspec Repts 50-518/78-11, 50-519/78-11, 50-520/78-11 & 50-521/78-11 on 780926-29 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Soils & Concrete Labs & Spray Pond Excavations IR 05000518/19780101978-10-11011 October 1978 IE Inspec Repts 50-518/78-10,50-519/78-10,50-520/78-10 & 50-521/78-10 on 780914-15 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Qa Prog & Records Containment Base Matl & Concrete Placement IR 05000518/19780081978-10-0404 October 1978 IE Inspec Repts 50-518/78-08, 50-519/78-08, 50-520/78-08 & 50-521/78-08 on 780815-31 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Qa Prog,Steel Plate Welding & Concrete Work Activities 1988-02-26
[Table view] |
Text
. ._ .
s .. .
I APPENDIX A NOTICE OF VIOLATION l Tennessee Valley Authority License No. CPPR-150 CPPR-151 CPPR-152 CPPR-153 Based on the results of the NRC inspection conducted on November 27-30, 1978, it appears that certain of your activities were hot conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in our correspondence to you dated December 31, 1974.
Criterion V of Appendix B to 10 CFR 50, as implemented by PSAR Section 17.1A.5, requires in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, ...and shall be accomplished in accordance with those instructions, procedures ...."
Construction Engineering Procedure 6.03 requires that design infor-mation (i.e., design and construction specifications) be received and filed in the Master Document File in the Document Control Unit and distributed to applicable Engineering Unit Supervisors. Procedure EN DES EP 3.04 requires that specifications be formally revised and reissued within 60 days of issuing a Specification Revision Notice (SRN) .
Contrary to the above, revisions to Specification N6C-875, " Earth and Rock Foundations and Fills" have not been controlled as required.
Specific examples are as follows:
- 1. Plant A Document Control Unit Master File did not contain SRN 3, SRN 4, SRN 6 and SRN 7 to Revision 5 of Specification N6C-875.
- 2. Quality control personnel in Plant A did not have access to SRN 3, SRN 4 and SRN 7 to Revision 5 of Specification N6C-875.
- 3. Specification N6C-875 was not being revised and reissued l within 60 days of the issuance of Specification Revision
! Notices (SRN's). SRN 3 to Revision 5 of the specification was issued on May 23, 1978, SRN 4 on June 22, 1978, SRN 5 on July 12, 1978, and SRN 6 on August 21, 1978. Revision 5 was the current issue of the specification on file on the date of
'~
inspection, November 30, 1978.
This is an infraction.