Forwards Partially Withheld Safeguards Insp Repts 50-295/90-23 & 50-304/90-25 on 901011-17
ML20062G905
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/21/1990
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20062G910 List:
References
NUDOCS 9012030072
Download: ML20062G905 (2)


See also: IR 05000295/1990023

Text

<

q

os

,.

"

j

SA"GtEDUCHATO)

-

.

,

NOV 211990

Docket No. 50-295

Docket No. 50-304

i'

Consnonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Opus West Ill

1400 Opus Place

l

Downers Grove, IL 60515

Gentlemen:

This refers to the routine safeguards inspection conducted by

Ms. G. M. Christoffer and Mr. T. J. Madeda of this office on October 11-17,

1990, of activities at Zion Nuclear Power Station, Units 1 and 2, authorized

by NRC Licenses No. DPR-39 and No. DPR-48 and to the discussion of our

findings with Mr. T. Joyce at the conclusion of the inspection.

The enclosed copy of oLr inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice.

The inspection

showed that actions had been taken to correct the identified violation

and to prevent recurrence. Our understanding of your corrective actions is

described in Paragraph 5 of the enclosed inspection report.

Consequently,

no reply to the violation is required and we have no further questions

regarding this matter at this time.

Areat examined during this inspection concern a subject matter which is

exempt from disclosure according to Part 73, Title 10, Code of Federal

!

^

Regulations, Section 73.21(c)(2).

This information must be handled and

'

_

protected in accordance with the provisions of 10 CFR 73.21.

Consequently,

the enclosure to this letter and our report of this inspection will not be

{

placed in the NRC Public Document Room.

t

!

1

\\

E

Enclocure Contains

SAFEGUARDS INFORMATION

Unon Separation This

~ n Is W mirM'd

SMEGUARONFORWl0N

M

901203007;, o01373

j

PDR

ADOCK oc;ocorpu;

O

FDC

D

i

SAL M RDS U0?jfr ot

-

.

~

'

.,

Connonwealth Edison Company

2 NOV 211990

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

L. Ro e t Greger, Chief

Reactor Programs Branch

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-295/90023(DRSS)

No. 50-304/90025(DRSS);

(SAFEGUARDSINFORMATION)

cc w/ enclosures:

M. Wallace, Vice President,

PWR Operations

T. Kovach, Nuclear

Licensing Manager

T. Joyce, Station Manager.

l

R. Chrzanowski, Regulatory Assurance

'

Supervisor

NRR/DR!S/SGB

NRR/DRIS/ SIB

NRR/DLPQ/PEC

cc w/ enclosure, w/o

SAFEGUARDS INFORMATION:

DCD/DCB(RIDS)

OC/LFDCB

i

Resident inspectors, Byron,

.

Braidwood, Zion

l

Richard Hubbard

!

J. W. McCaffrey, Chief, Public

Utilities Division

Mayor, City of Zion

4

Chandu Patel, LPM, NRR

Robert Newmann, Office of Public

Counsel, State of Illinois Center

i

h olosuro Contains

SAFEcurppS INFORMATION

Upon Separation Tht3

.

I209 IS DOCOO1 pp t .,,j

I

p/

&

Rill

8

Rily

P 11

11

Rlli

iri

fer/kje

Ada

-

1

~_

>