ML20062G891
From kanterella
Jump to navigation
Jump to search
ML20062G891 | |
Person / Time | |
---|---|
Site: | 07000008, 07000036, 07000925, 07002003 |
Issue date: | 11/02/1990 |
From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | Battelle Memorial Institute, COLUMBUS LABORATORIES |
Shared Package | |
ML20062G890 | List: |
References | |
NUDOCS 9012030068 | |
Download: ML20062G891 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P0971999-10-20020 October 1999
[Table view]Forwards Combustion Engineering Third Sample Event Rept in Conjunction with Hdrogeologic Investigation & Ground-Water, Soil & Stream Characterization, as Requested ML20217M1451999-10-19019 October 1999 Forwards Amend 29 to License SNM-33,allowing Requested Time Extension to Certain Commitments in Fundamental Nuclear Matl Control Plan Re Temporary Change to UF6 Receipt Sampling Procedure.Safeguards Evaluation Rept,Encl RA99-138, Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-9909301999-10-0808 October 1999 Forwards Eighth Status Rept on Criticality Safety Program Update (Cspu),Per Cspu Plan & Subsequent Revs. Rept Covers semi-annual Period from 990401-990930 ML20212J0161999-09-29029 September 1999 Forwards Insp Rept 70-0036/99-04 on 990907-10.No Violations Noted ML20216F2021999-09-14014 September 1999 Forwards Insp Rept 70-0925/99-01 on 990709-0817.No Violations Noted.Insp Covered Remediation of sub-area O & Verification That Soil in Waste Ponds 1 & 2 Met NRC Acceptance Criteria ML20216E7441999-09-13013 September 1999 Grants six-month Extension of Time for Combustion Engineering to Further Develop & Refine in-situ Leaching (Isl) Process for Recovery of U from Soils Beneath Evaporation Ponds ML20212A8951999-09-10010 September 1999 Forwards Proprietary Updated Physical Security Plan for Protection of Special Nuclear Matl of Low Strategic Significance for Abb Combusting Engineering Nuclear Power, Inc,Hematite Facility,Per 10CFR73.67.Plan Withheld RA99-133, Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl1999-08-25025 August 1999 Forwards Third Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization. Ltr from Leggette,Brashears & Graham,Inc, Authorizing Reproduction of Repts,Encl ML20211B4291999-08-19019 August 1999 Forwards Amend 28 to License SNM-33,changing Name of Licensee to Abb Combustion Engineering Nuclear Power,Inc & Incorporating Date of 990618,for Decommissioning Financial Assurance.Ser Also Encl ML20210V0971999-08-18018 August 1999 Confirms Meeting Scheduled for 990915 at Licensee Facility in Festus,Missouri.Purpose of Meeting to Discuss Current Plant Performance,Future Plant Activities,Recent Insp Activities & Pond Decommissioning RA99-129, Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal1999-08-13013 August 1999 Forwards License Application Pages Reflecting Recent Changes Made to Corporate Name.Ltr Replaces Entire 990729 Submittal RA99-082, Provides Update on Status of Abb Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same1999-08-13013 August 1999 Provides Update on Status of Abb Cenp Former Evaporation Ponds Decommissioning & Planned Actions Regarding Same ML20210Q3781999-08-11011 August 1999 Forwards Insp Rept 70-0036/99-03 on 990803-04.No Violations Noted RA99-120, Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-331999-07-29029 July 1999 Forwards License Application Pages Affected by Corporate Name Change,Consistent with Amend 27 to License SNM-33 ML20209B3031999-06-28028 June 1999 Ack Receipt of Transmitting Hydrogeologic Investigation & ground-water,soil & Stream Characterization & Ltr Transmitting Second Sampling Event Rept. Proposed Actions Appear Appropriate ML20212J3731999-06-25025 June 1999 Responds to Re Annual Fee Invoice AM4270-99 & Fee Categories Assigned to License SNM-7.Fee Category 3O on Invoice AM4270-99 Erroneously Issued & Has Been Canceled. Payment Received & Invoice Revised & Considered Paid ML20212J3791999-06-21021 June 1999 Ack & Accepts Majority of Fee Categories Assigned to License SNM-7 in Fy 1999 Annual Matls Fee Invoice AM4270-99,dtd 990601.Forwards Corrected Copy of Annual Fee Invoice.Without Encl ML20195D3741999-06-0303 June 1999 Forwards Application for Amend to License SNM-33 to Transfer Combustion Engineering,Inc Assets & Liabilities Related to NRC Licensed Activities to Combustion Engineering Nuclear Power,Inc ML20195C9991999-06-0202 June 1999 Forwards License SNM-33,amend 26,allowing Time Extension for Distributing Result Repts for Apr 1999,physical Inventory.Temporary Safeguards License Condition SG-1.9,is Being Issued to Read as Listed,Effective Immediately ML20207D4741999-05-27027 May 1999 Forwards Insp Rept 70-0008/99-01 on 990414-15.No Violations Noted.Based on Results of Insp,Nrc Did Not Identify Any Radioactive Matls in Excess of NRC Release Guidelines for Unrestricted Use RA99-099, Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan1999-05-26026 May 1999 Forwards Second Sampling Event Rept in Conjunction with Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After Second Quarter of Sampling Under CEs Hydrogeologic Work Plan ML20207D0421999-05-26026 May 1999 Discusses Which Provided Info Re Battelle Memorial Inst Special Nuclear Matl Possession Limits,Per 990121 Request.Sum Quantities of Special Nuclear Matl Would Exclude Transfer of SNM-7 License to State of Oh ML20207A6031999-05-21021 May 1999 Forwards Insp Rept 70-0036/99-02 on 990426-30.No Violations Noted RA99-093, Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 9907021999-05-20020 May 1999 Requests Extension of Time Periods for Submission of Annual Inventory Repts,As Required by Licensee Fundamental Nuclear Matl Plan & NUREG/BR-0007.NRC Forms 742C & 742 Will Be Submitted by 990604 & NRC Form 327 Submitted by 990702 ML20196L2761999-05-19019 May 1999 Forwards Amend 25 to License SNM-33 & Ser.Amend Revised Fundamental Nuclear Matl Control Plan.Nrc Has Completed Review of Submitted Changes & Determined That Changes Do Not Decrease Effectiveness of MC&A Program ML20206U5701999-05-19019 May 1999 Confirms Cancellation of 990524 Meeting in Festus,Mo.Meeting Will Be Rescheduled in Future ML20196L2721999-05-18018 May 1999 Ack Receipt of ,Transmitting Copy of Semiannual Status Rept of C-E Criticality Safety Program Update Covering Period from 981001-990331 ML20196L1391999-05-18018 May 1999 Forwards Partially Withheld Insp Rept 70-0036/99-203 Conducted on 990419-23.No Violations Noted.Major Areas Inspected:Mc&A Safeguards Program.Rept Details Withheld,Per 10CFR2.790(d) RA99-088, Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant1999-05-12012 May 1999 Provides Third Response to GL 98-03, NMSS Licensee & Certificate Holders Year 2000 Readiness. Licensee Has Upgraded Systems Having Safety or Safeguards Functions & Is Y2K Ready & Y2K Compliant ML20206G9341999-05-0303 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/99-01 Issued on 990323 ML20206B0371999-04-26026 April 1999 Forwards Insp Rept 70-0036/99-202 on 990405-09.No Violations Noted RA99-074, Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function1999-04-22022 April 1999 Responds to NRC Re Violations Noted in Insp Rept 70-0036/99-01.Corrective Actions:Special Evaluation Traveler Was Implemented to Assure That Sys to Prevent Overfilling of UF6 Cold Trap Would Perform Intended Safety Function RA99-075, Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission1999-04-21021 April 1999 Forwards App A,Figure 10 from Hydrogeologic Investigation & Groundwater,Soil & Stream Characterization Rept.Figure Was Inadvertently Ommitted from Original Submission ML20205R6161999-04-19019 April 1999 Confirms Meeting Scheduled for 990524 in Festus,Missouri to Discuss Current Plant Performance,Future Plant Activities, Recent Insp Activities & Progress of Nuclear Criticality Safety Upgrade Program ML20205P5241999-04-0909 April 1999 Forwards Amend 24 to License SNM-33,changing Mailing Addresses of Corporate Ofc & of Facility at Which Licensed Activity Will Be Conducted.Ser Also Encl RA99-070, Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 9910071999-04-0707 April 1999 Forwards Criticality Safety Program Update Seventh Status Rept for Oct 1998 - Mar 1999. Next Rept Will Be Submitted by 991007 RA99-068, Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile1999-04-0707 April 1999 Informs That Info Re Facility Has Been Reviewed & Verified, with Listed Discrepancies Noted,As Requested by NRC 990323 Fascimile ML20204J2981999-03-23023 March 1999 Forwards Insp Rept 70-0036/99-01 on 990301-05 & NOV Re Failure to Implement Program,As Required,For Testing,Calibr & Insp of Component Defined by Integrated Sa/Hazard Analysis ML20205M4321999-03-18018 March 1999 Forwards Amend 23 to License SNM-33 & Ser.Amend Incorporates Changes Made to Emergency Plan.Safety Condition S-1 Revised to Include Date of 990115 ML20207M1231999-03-11011 March 1999 Informs That Encl Ltr Explains How NRC Plans to Institute Round Robin Sample Exchange Program Administered by Nbl for Verifying Quality of Licensee U Destructive Measurement Sys.Invoice FL0232-99 Encl RA99-045, Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl1999-03-0909 March 1999 Forwards Hydrogeologic Investigation & Ground-Water,Soil & Stream Characterization, Rept Developed After First Quarter of Sampling Under Hydrogeologic Work Plan Dtd 980428. Reproduction Release Authorization,Also Encl ML20207K2711999-03-0404 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-204. Implementation of Corrective Actions Will Be Reviewed During Future Insps ML20206S5091999-02-0505 February 1999 Forwards Insp Rept 70-0036/99-201 on 990118-22.No Violations Noted.One Violation,Nine Inspector Followup Items & Two Unresolved Items Closed ML20203B2941999-01-27027 January 1999 Forwards Amend 22 to License SNM-33.Amend Allows Requested Time Extension to Certain Specified Commitments in Fundamental Nuclear Matl Control Plan.Safeguards Evaluation Rept,Encl ML20202B4791999-01-26026 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-04 Issued on 981021.Response Indicated That Licensee Conducted Root Cause Analysis & Scheduled 990209 Meeting to Discuss Issues ML20202B5541999-01-26026 January 1999 Confirms Meeting Scheduled for 990209 in Lisle,Illinois to Discuss Recent Insp Findings on CE Assessment of Lapel Air Samples & Results of Root Cause Assessment & Procedure non-conformance ML20199J9311999-01-21021 January 1999 Submits RAI Re Bcl Decommissioning Project Request to Change Decommissioning Schedule & Other Listed Subj Matters.Respond to Request within 15 Days from Date of This Ltr ML20199G3851999-01-19019 January 1999 Forwards Partially Withheld Insp Rept 70-0036/98-204 on 981207-11 & Notice of Violation.Violations Noted.Rept Details Withheld (Ref 10CFR2.790) RA99-006, Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents1999-01-15015 January 1999 Forwards Revised Pages to Hematite Nuclear Fuel Mfg Facility Emergency Plan, Revising Sections 2.1.6 & 2.1.7 Re Postulated Fire & Explosion Incidents RA99-005, Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 19981999-01-15015 January 1999 Informs That CE Will Present follow-up Info in Response to Violations Noted in Insp Rept 70-0036/98-04,at Meeting with Region Iii.Licensee Has Conducted Root Cause Analysis of Causes That Lead to Violation & Reviewed DAs for 1998 1999-09-29 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217M1451999-10-19019 October 1999
[Table view]Forwards Amend 29 to License SNM-33,allowing Requested Time Extension to Certain Commitments in Fundamental Nuclear Matl Control Plan Re Temporary Change to UF6 Receipt Sampling Procedure.Safeguards Evaluation Rept,Encl ML20212J0161999-09-29029 September 1999 Forwards Insp Rept 70-0036/99-04 on 990907-10.No Violations Noted ML20216F2021999-09-14014 September 1999 Forwards Insp Rept 70-0925/99-01 on 990709-0817.No Violations Noted.Insp Covered Remediation of sub-area O & Verification That Soil in Waste Ponds 1 & 2 Met NRC Acceptance Criteria ML20216E7441999-09-13013 September 1999 Grants six-month Extension of Time for Combustion Engineering to Further Develop & Refine in-situ Leaching (Isl) Process for Recovery of U from Soils Beneath Evaporation Ponds ML20211B4291999-08-19019 August 1999 Forwards Amend 28 to License SNM-33,changing Name of Licensee to Abb Combustion Engineering Nuclear Power,Inc & Incorporating Date of 990618,for Decommissioning Financial Assurance.Ser Also Encl ML20210V0971999-08-18018 August 1999 Confirms Meeting Scheduled for 990915 at Licensee Facility in Festus,Missouri.Purpose of Meeting to Discuss Current Plant Performance,Future Plant Activities,Recent Insp Activities & Pond Decommissioning ML20210Q3781999-08-11011 August 1999 Forwards Insp Rept 70-0036/99-03 on 990803-04.No Violations Noted ML20209B3031999-06-28028 June 1999 Ack Receipt of Transmitting Hydrogeologic Investigation & ground-water,soil & Stream Characterization & Ltr Transmitting Second Sampling Event Rept. Proposed Actions Appear Appropriate ML20212J3731999-06-25025 June 1999 Responds to Re Annual Fee Invoice AM4270-99 & Fee Categories Assigned to License SNM-7.Fee Category 3O on Invoice AM4270-99 Erroneously Issued & Has Been Canceled. Payment Received & Invoice Revised & Considered Paid ML20195C9991999-06-0202 June 1999 Forwards License SNM-33,amend 26,allowing Time Extension for Distributing Result Repts for Apr 1999,physical Inventory.Temporary Safeguards License Condition SG-1.9,is Being Issued to Read as Listed,Effective Immediately ML20207D4741999-05-27027 May 1999 Forwards Insp Rept 70-0008/99-01 on 990414-15.No Violations Noted.Based on Results of Insp,Nrc Did Not Identify Any Radioactive Matls in Excess of NRC Release Guidelines for Unrestricted Use ML20207D0421999-05-26026 May 1999 Discusses Which Provided Info Re Battelle Memorial Inst Special Nuclear Matl Possession Limits,Per 990121 Request.Sum Quantities of Special Nuclear Matl Would Exclude Transfer of SNM-7 License to State of Oh ML20207A6031999-05-21021 May 1999 Forwards Insp Rept 70-0036/99-02 on 990426-30.No Violations Noted ML20196L2761999-05-19019 May 1999 Forwards Amend 25 to License SNM-33 & Ser.Amend Revised Fundamental Nuclear Matl Control Plan.Nrc Has Completed Review of Submitted Changes & Determined That Changes Do Not Decrease Effectiveness of MC&A Program ML20206U5701999-05-19019 May 1999 Confirms Cancellation of 990524 Meeting in Festus,Mo.Meeting Will Be Rescheduled in Future ML20196L2721999-05-18018 May 1999 Ack Receipt of ,Transmitting Copy of Semiannual Status Rept of C-E Criticality Safety Program Update Covering Period from 981001-990331 ML20196L1391999-05-18018 May 1999 Forwards Partially Withheld Insp Rept 70-0036/99-203 Conducted on 990419-23.No Violations Noted.Major Areas Inspected:Mc&A Safeguards Program.Rept Details Withheld,Per 10CFR2.790(d) ML20206G9341999-05-0303 May 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/99-01 Issued on 990323 ML20206B0371999-04-26026 April 1999 Forwards Insp Rept 70-0036/99-202 on 990405-09.No Violations Noted ML20205R6161999-04-19019 April 1999 Confirms Meeting Scheduled for 990524 in Festus,Missouri to Discuss Current Plant Performance,Future Plant Activities, Recent Insp Activities & Progress of Nuclear Criticality Safety Upgrade Program ML20205P5241999-04-0909 April 1999 Forwards Amend 24 to License SNM-33,changing Mailing Addresses of Corporate Ofc & of Facility at Which Licensed Activity Will Be Conducted.Ser Also Encl ML20204J2981999-03-23023 March 1999 Forwards Insp Rept 70-0036/99-01 on 990301-05 & NOV Re Failure to Implement Program,As Required,For Testing,Calibr & Insp of Component Defined by Integrated Sa/Hazard Analysis ML20205M4321999-03-18018 March 1999 Forwards Amend 23 to License SNM-33 & Ser.Amend Incorporates Changes Made to Emergency Plan.Safety Condition S-1 Revised to Include Date of 990115 ML20207M1231999-03-11011 March 1999 Informs That Encl Ltr Explains How NRC Plans to Institute Round Robin Sample Exchange Program Administered by Nbl for Verifying Quality of Licensee U Destructive Measurement Sys.Invoice FL0232-99 Encl ML20207K2711999-03-0404 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-204. Implementation of Corrective Actions Will Be Reviewed During Future Insps ML20206S5091999-02-0505 February 1999 Forwards Insp Rept 70-0036/99-201 on 990118-22.No Violations Noted.One Violation,Nine Inspector Followup Items & Two Unresolved Items Closed ML20203B2941999-01-27027 January 1999 Forwards Amend 22 to License SNM-33.Amend Allows Requested Time Extension to Certain Specified Commitments in Fundamental Nuclear Matl Control Plan.Safeguards Evaluation Rept,Encl ML20202B5541999-01-26026 January 1999 Confirms Meeting Scheduled for 990209 in Lisle,Illinois to Discuss Recent Insp Findings on CE Assessment of Lapel Air Samples & Results of Root Cause Assessment & Procedure non-conformance ML20202B4791999-01-26026 January 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-04 Issued on 981021.Response Indicated That Licensee Conducted Root Cause Analysis & Scheduled 990209 Meeting to Discuss Issues ML20199J9311999-01-21021 January 1999 Submits RAI Re Bcl Decommissioning Project Request to Change Decommissioning Schedule & Other Listed Subj Matters.Respond to Request within 15 Days from Date of This Ltr ML20199G3851999-01-19019 January 1999 Forwards Partially Withheld Insp Rept 70-0036/98-204 on 981207-11 & Notice of Violation.Violations Noted.Rept Details Withheld (Ref 10CFR2.790) ML20199D8461999-01-11011 January 1999 Discusses Insp Rept 70-0008/98-03 on 981215-17.No Violations Were Identified.Insp Consisted of Observations & Evaluations of on-going Decommissioning Activities Including Reviews of Environ Monitoring Sys & Controls & Radiation Protection ML20199D8761999-01-0404 January 1999 Requests Addl Info for Info Not Found During Review of Listed Licensing Documents.Nrc Is in Process of Preparing Rtm Suppl for Each Fc Facility,Per .Suppl Assist NRC Incident Response Staff as Emergency Assessment Tool ML20198E8001998-12-18018 December 1998 Informs That NRC Received Ltr Dtd 981201,clarifying Intent of Section 4.2 of Hematite Evaporation Ponds Dcommissioning Plan ML20198D5001998-12-14014 December 1998 Forwards Insp Rept 70-0008/98-02 on 981116-18 & 1211.No Violation Noted.Purpose of Insp Was to Determine Adequacy of Confirmantory Survey Conducted by Orise in Building 2 ML20206N4301998-12-14014 December 1998 Forwards Insp Rept 70-0008/98-01 on 981116-18 & 1211.No Violations Noted.Insp Consists of Radiological Surveys,Used by NRC to Evaluate Orise Effectiveness in Conducting Its Confirmatory Survey & Releasing Bldg for Restricted Use ML20197H4111998-12-0707 December 1998 Discusses 981030 Meeting with Hematitle Fuel Operations & NRC at Region III Office Re General Plant Topics Which Included Part 70 Rulemaking & Nuclear Criticality Safety Program Updates ML20196D2341998-11-24024 November 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-04 & 990115 Commitment to Provide Addl Steps to Be Taken Subsequent to Mgt Review of Root Cause Assessment Team Findings ML20196C3601998-11-24024 November 1998 Forwards Insp Rept 70-0036/98-05 on 981102-06 & Notice of Violation.Violation of Concern Because of Indication of Lack of Attention to Detail in Implementation of Posted Criticality Safety Controls for Routine Operations in Plant ML20195J6221998-11-23023 November 1998 Responds to Indicating That Battelle No Longer Disputes Listed Invoices & That Payment Sent ML20196A9331998-11-20020 November 1998 Ack Receipt of Ltrs & 1103,which Provided Biennial Update for Demonstration Sections of License SNM-33.Update Reflects Current Operations & Includes Operational Data & Info on Current Environmental Release ML20195E2121998-11-17017 November 1998 Responds to Re Receipt of Overdue Notices for Listed Invoices ML20155H7561998-11-0303 November 1998 Forwards Insp Rept 70-0925/98-02 on 980922-1022.No Violations or Deviations Noted ML20155B7141998-10-28028 October 1998 Informs That Staff Reviewed Response to Violations Noted in Insp Rept 70-0036/98-202 & Determined Response Meets Requirements of 10CFR2.201.Implementation of Licensee Corrective Actions Will Be Reviewed During Future Insps ML20154R4251998-10-21021 October 1998 Forwards Insp Rept 70-0036/98-04 on 980914-18 & Nov.One Violation Identified & of Concern Because Examples Indicate Weakness in Implementation of Mgt Program for Performance of Certain Operations ML20154L4861998-10-14014 October 1998 Ack Receipt of 980827 & 1005 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0036/98-03 Issued on 980730.C/As Will Be Examined During Future Insp ML20155A6331998-10-13013 October 1998 Ack Receipt of Ltr Dtd 980925,transmitting Copy of Semiannual Status Rept of C-E Criticality Safety Program Update Covering Period from 980331-0930 ML20154J8371998-10-13013 October 1998 Confirms Meeting Scheduled for 981030 in Lisle,Il to Discuss General Facility Performance ML20154D5111998-10-0202 October 1998 Forwards Nuclear Criticality Safety Insp 70-0036/98-203 on 980804-07.One Unresolved Item & One non-cited Violation Was Noted.Unresolved Item Involved Need to Identify Un Tank in Recovery Area as Single Parameter Control Component ML20151V2481998-09-10010 September 1998 Provides Addl Staff Comment on Licensee 980615 Response to NRC Comments Re Final Status Survey Rept for Concrete Rubble in sub-area F 1999-09-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20062G891&oldid=3553731"