Rept of Deficiency in Bailey Controls Pwr Supplies Installed in 10 Category I Appls,Principally HVAC Analog Instrumentation Control Loops.All Potentially Defective Pwr Supplies Will Be Replaced
ML20062G099
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/11/1978
From: Novarro J
LONG ISLAND LIGHTING CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
SNRC-343, NUDOCS 7812260211
Download: ML20062G099 (2)


Text

l

~a o

l t

1 I

j December 11, 1978 SNRC-343 w.r. Boyce Grier, Director Office of Inspection & Enforcement i

Region I l

U.S.11uclear Regulatory Commission

?

631 Park Avenua King of Prussia, PA 19406 i

LOIG ISLAITD LICHTING COPPANY.

Shoreham Nuclear Power Station - Unit 1

?

Docket No. 50-322

Dear Mr. Grier:

On November 3, 1978, in accordance with 10CFR50.55(e), we noti-ficd Mr. A. Toth of the NRC that a deficiency existed in Sailey Controls power cumplies installed in ten Category I applications, orincipally HVAC analog instrumentation control loops.

This letter serves as our 30-day written report for this deficiency.

DESCRIPTION OF THE DEFICIE!TCY Bailey Controls was advised by their pouer sunply vendor (ITT North Electric) that random premature failures of the power cun-j plies could occur due to contanination of a capacitor by the Q

packaging material used by the vendor.

The packaging material V

of concern is foamed-in-place urethane which may da= age the capacitor's dielectric material.

I' A review of the part numbers supplied by Bailey (BCC Part Nos.

8080B02P008 through 3080B02P0012, inclusive) determined that such power supplies were installed in ten Category I applica-i tions.

These applications are prheily IWAC analog instru-mentation control loops such as RBS3V, CRAC, etc.

These syste=s j

are important for post LOCA and off-site release control.

4 CORRECTIVE ACTION 1

l All potentially defective power sunplies will be replaced.

Bailey Control's has notified us that replacement power supplies I ;

will be shipped to us in early December 1973.

('

96 7 812 2 6 0 cR/l 4 5 l'-

-- _=

s-

n j

s I

December 11, 1973 l

Mr. Boyce Grier Page 2 i

I t

CORRECTIVE ACTIO;I TO PREVENT RECURPI: ICE 1

j Bailey Controls, as well as their vendor (Trf North Electric),

are fully aware of this problem and will institute corrective action to insure that the packaging c:aterial utilized in the future will not adversely affect cor:ponent reliability.

i i

DATE OF FULL COMPLIKiCE W estimate that all replacements of the affected power sun-plies will be cor:pleted by April 1,1979.

Very truly yours, l

l Origi.,a'. cier.ed i:y N E

2. : 0c;JiRo J. P. Noverro Project Ma."arer Shoreham lindear Power Station GIT:jv l

cc:

Mr. John G. Davis, Director Office of Inocection & Enforeccent l

C' U.S. Nuclear Regulatory Comission Uashington, D.C.

20545

+

t f

bec:

Dist. List 14 i

C. A. Fonseca-I R. Bernard R. Hartswell Eng. File /SR2...A21.200 1

J l,

1 L

D 1

?.

i:

a

-