Forwards Safety Insp Rept 50-346/90-21 on 901015-1105.No Violations Noted
ML20062G067
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/21/1990
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20062G072 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 9011280380
Download: ML20062G067 (2)


See also: IR 05000346/1990021

Text

.

NOV 2 31990

.

'

.

,

'

'

Docket No. 50 346

Toledo Edison Company

ATTN:

Mr. Donald C. Shelton

l

'

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, 011 43652

,

Centlemen:

This refers to the special safety inspection conducted by Messrs. M. J. Kopp

and G. M. Hausman of this office on October 15 through November 5, 1990, of

activities at the Davis Besse Nuclear Power Station, authorized by NRC

Operating License No. NPF 3, and to the discussion of our findings with

Mr. G. Honma and others of your staff .st the conclusion of the inspection.

The purpose of this inspection was to foilow up unresolved items previously

identified in Inspection Reports No. 50 34C/82004(DRS), No. 50 346/86024(DRS)

'

and No. 50 346/88038(DRS) relative to environme.*al qualification (EQ) issues

and the implementation of commitments pertaining to Regulatory Guide (RG) 1.97.

The enclosed copy of our inspection report identifica

examined during

ava==

the inspection. Within these areas, the im;,ection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

'

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Oricinal Signed by Mark A. r'n;

M. A. Ring, Chief

Engineering Branch

M Attached for Enclosure

and Dic*ribucion

.

l

I

RII:

RIII

RII(

RII

l

4

%T

M-

p /jk

lausman

Jacki

Gardner

Ring

11/15/90

11//) /90

11/2A/90

11/ I'l/90

11/D /90

9011280300 901121

ava wwpg

m

,01

a

7

. .

_ . . .

__

_..

. _ . .

._

.

_

.

. . _ , .

.

.1

.

'i

3

- .

-

.

.

NOV 2 31990

i

.

Toledo' Edison Company-

2

'

t

>

h iosure and Distribution

_

i

Enclosure:

Inspection Report

,

No. 50 346/90021(DRS)

l,

cc w/ enclosure:

f

L. Storz, Plant Manager

,

DCD/DCB (RIDS)

>

OC/LFDCB

3

Resident Inspector, RIII.

-

James W. Harris, State of Ohio

,

Robert E. Owen, Ohio

Department of Health

A. Grandjean, State of Ohio,

Public Utilities Commission-

f

i

i

.{

h

I

f

_;

,

,

i

,

'

i

t

l-

,

a

l

.

..

!

t

?

p

!

!

.

Ic

t

,

,'t

,

--_-

..+, .

,

,

- , - , -

.

_- ,,

,.,:.-

,