,* C AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-245 Millstone l 3,37 820707 l
DATE G. Hanan f
COMPLETED BY j
TELEPHONE _203/447-1791~
Ext. 419'4 l
June MONE DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe-NeO 596 592 17 2
588 592 is 3
596 19 594 4
597 20 593 5
597 21 592 6
596 22 592 597 7
23 592 8
597 24 592 9
597 576 25 to 595 472 26 11 583 593 27 12 595 28 592 13 594 592 29 14 595 587 30 15 595 31 N/A 16 591 INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771 8200120091 820712 PDR ADOCK 05000245 R
._x._.._________.__
___________1___
':l l
OPERATING DATA REPORT 50-26 1)OCKET NO.
DATE 820707 l
COMPLET ED 15Y G. Harran
/
TELEPl!ONE 203/44/-1791 Ext. 4194 OPERATING STATUS Millstone Unit 1 Notes
- 1. Unit Name:
June 1982
- 2. Reporting Period:
2011
- 3. Licensed Thermal Power (MWI):
622
- 4. Nameplate Rating (Gross MWe):
- 5. Design Elcetrical Rating (Net MWe):
660 684
- 6. Maximum Dependable Capacity (Gross MWe):
654
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:
N/A N/A
- 9. Power Lese! To Which Restricted. If Any (Net MWe):
Approximately 595 MWE
- 10. Reasons For Restrictions.lf Any:
Main Turbine complete 14th stage removal.
This Month Yr. to Date Cumulatise li. Hours In Reporting Period 720 4343 ' e.
101567
- 12. Number Of Hours Reactor Was Critical 720 4304.8 75558.9
- 13. Reactor Resene Shutdown Hours 0
0 2775.8
- 14. Hours Generator On Line 720 4295.2 72938.9
- 15. Un! Resene Shutdown Hours 0
0 26.5
- 16. Gross Tnermal Energy Generated (MWII) 1428475 8408729 131443813
- 17. Gross Electrie?! Energy Generated (MWH)
- 445_400_,
2633300 44095296
- 18. Net Electrica1 Energy Generated (MWH) 423759 2505554 42054377
- 19. Unit Senice Factor 100 98.9 71.8
- 20. Unit Asailability Facto, 100 98.9 71.8 '
63.3
- 22. Unit Capacity Factor (Using DLR Net) 89.2 87.4 62.7
- 23. Unit Forced Outage Rate 0
1.1 15.4
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of Eacht:
Refueling outage, September 11, 1982, 11 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
"O
- 26. Units In Test Status (Prior io Commercial Operationi:
Forecast Achiesed INITI Al. CRITICA LITY INITIAL ELECTRICITY N/A COMMERCI AL OPFR ATION
('3/771
i
. ~,. -
50-245 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N AM E Millstone 1 DATE @(0707 REPORT MONTH June COMPLETED BY la. H3rran TELEPHONE ?O3/d47-1709 Ext. 41%
"i
.=E r-c.
. >=
e*l, Cause & Correttive 2
g 2E4 l'."5#'
c N '-
Ud'C i
35 4
2sE Event u?
83 Action to c3 E 5
jgg Report a rN 0 U
Prevent Recurrence q
c5 3
820626.
5 0
B 4
N/A N/A N/A Decreased reactor power to approximately 50% for M.G. set re-brushing and a minor control rod pattern adjustment.
l I
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data l
R Maintenance of Test 2-Manual Scram.
Entry Sheets for Lscensee C. Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4Other (Explain) 0161)
EOperator Training & Ucense Examination
'~ Administrative 5
Goperational Error (Esplain)
...:.a i - Same Sooice (9/77) l10:her (Explain) 1 O
d
Docket No.
50-245 Page 1 of I
Date 82070/
?
Unit Name Millstone 1 Completed By G. Ha rran Telephone 203/447-1792 Ext. 4194 CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month May, 1982 I
DATE SYSTEM COMP 0NENT MAINTENANCE ACTION y
5-5-82 Fire Protection Cable Vault Smoke Detectors &
Changed out 15 Detectors, Air Duct Smoke Fusible Links and 2 Fusible Links i
5-18-82
.Nuc. Instrumentation IRM Channel 17 Power Supply Remove, repair Install & Retest 4
e e
0
Docket tio.
50-245 Page / of /
Date 820707
]
Unit Name Millstone 1 Completed By G. Harran
~ '
Telephone 203/447-17o1 Ext. 4194 CORRECTIVE MAINTEtlAtiCE SUFNARY FOR SAFETY RELATED EQUIPMENT Report Month June,1982
{
DAIf SYSTEM COMPONENT MAINTENAt4CE ACTION 6-30-82 Fire Protection Battery Charger Replaced h
9 o
A
v REFUELit.G It. 0Ri';T10! REQUEST 7
1.
flame of facility: _ Millstone 1 2.
Scheduled date for next refueling shutdown:
September 1982 3.
Scheduled date for restart foll,owing refueling:
fiovember 1982 4
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes. Technical Specification changes regarding:
(1) Maximum average planar linear heat generating rate (2) Maximum critical power ratio 5.
Scheduled date(s) for submitting proposed licensing action and supporting in formation:
s Sumer 1982 6.
Important licensing considerations associated with refueling, e.g., new or different feel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
172 " Retrofit" 8 X 8 fuel as!.emblies are scheduled for insertion in Cycle 9 (Reload 8) 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core:
580 (b) In SFP:
954 8.
The present licensed spent fuel pool storage capacity and the size of any in-crease in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
l 2184 Assemblies 9.
The projected date of the last refueling that can be discharged to the spent
~
fuel pool assuming the present licensed capacity:
l 1985, Spent Fuel Pool, full core off load capability is reached.
1991, Core Full, spent fuel pool contains 2120 bundles tmh:rmj e