Responds to SER Open Item 9 & Recent Meetings W/Containment Sys Branch Re Pool Dynamic Loads.Commits to Meet Load Definitions in App 3B of Gessar II 238 Nuclear Island
ML20062F455
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/05/1982
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML20062F457 List:
References
NUDOCS 8208120056
Download: ML20062F455 (3)


Text

~

f THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P O BC 4 5000 m CL EVEL AND OHIO 44101 a

T EL EPHONE '21F,1 f;22 9800 m ILLUMlNATING OLDG e 55 PUBLIC SOUARE Sereng The Best Location in the Nation Dalwyn R. Davidson w t i m wa n t s e n o vaa nnw e.o constsuctics August 5,1982 Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 SER Open Item--No. 9 Pool Dynamic Loads

Dear Mr. Schwencer:

This letter is provided in response to SER Open item No. 9 and recent meetings with the Containment Systems Branch staff regarding pool dynamic loads.

Cleveland Electric Illuminating Company has evaluated the NRC draf t acceptance criteria for Mark Ill LOCA-related pool dynamic loads (Attachment 1 ).

The Perry Nuclear Power Plant is presently committed to meet the load definitions in Appendix 3B of GESSAR 11 238 Nuclear Island, and will meet the exceptions, modifications, qualifications and/or clarifications identified in Attachment 1.

A specific discussion of cach of these items is provided in Attachment 2.

In summary, the Perry Nuclear Power Plant will meet the acceptance criteria defined in Attachment 1.

If there are any further questions, please let me know.

Very truly yours, Dalwyn 1. Davidson Vice President System Engineering and Construction DRD:EMB:mb cc: Jay Silberg John Stefano Max Gildner 0

}0 8208120056 820805 PDR ADOCK 05000440 E

PDR

ATTACHMENT 2 I

PERRY NUCLEAR POWER PLANT i

HYDRODYNAMIC LOAD DEFINITIONS

{

I LOCA RELATED LOADS 1

i t

j Perry Nuclear Power Plant has evaluated the NRC draf t acceptance criteria for Mark III LOCA-related Containment Pool Dynarnic Loads. PNPP has committed to the GESSAR defined loads and will meet the exceptions, modifications, qualifications and/or clarifications presented in the draf t acceptance criteria as follows:

l 1.1 Pool Swell Velocity i

)

Perry currently is designed to the GESSAR II specified 40 fps constant pool swell velocity. All items in the bulk pool swell area will be

}

evaluated using the velocity gradient up to 50 fps maximum as specified in the draf t acceptance criteria.

4

{

l.2 Bulk Pool Swell Loads and

.l 1.3 Perry is presently designed to the maximum impact pressures shown i

in the GESSAR II. Limitations and discussions regarding drag pressures i

and force history during impact will be addressed and included in j

the Perry design.

j l.4 Froth impact Loads The draf t acceptance criteria Figure 1.4.1 indicated an increased peak froth impact load from the original GESSAR 11 specification, to which Perry is presently designed. All items subject to froth i

impact loads will be re-evaluated, to show sufficient margins.

i

l.5 Drag Loads Drag loads will be re-evaluated in the same manner as the increased l

pool swell velocity gradient specified in item 1.1.

Any load modifications

~

4 3

will be included in the Perry design values.

I 1

l 2.0 Loads on Submerged Structures 1

l Perry will meet the draf t acceptance criteria by using procedures for computation of loads on submerged structures which result in more consersative loads than those described in GESSAR 11.

j Additionally, band m the elevation of the Perry Hydraulic Control Unit (HCU) floor being 7' higher ihan the GE Standard Plant, a plant unique pressure differential (a P) across the HCU floor was calculated to be 5.4 psi and will be used for design j

evaluation. This value compares with the GE Standard Plant calculation of 7.35

)

psi.

i i

1

~

--~w.

c,

,.w,--._,,%.-,.,.-~.._.-%,w-..-,w,.w,,.

m,,yv,-,,,,

.,,.,gy,,..,_7.,,..

,_p._7, p memw3 m.9

-p,

I ATTACHMENT 2 Page 2 11 SRV LOADS The load definitions, as they apply to the Perry Plant, are from GESSAR II, Appendix 3B. No major variations are expected in the load definition described in the acceptance criteria of the NUREG to be released.

In surnmary, we have accounted for the hydrodynamic elfects due to SRV and LOCA-related Loads as described in GESSAR 11, Appendix 3B and are committed to meeting the acceptance criteria shown in the NRC memo from T. Spies to R. Tedesco, dated March 8,1982 (Attachment 1).