Forwards Rev 1 to 900629 Simulation Facility Application for NRC Approval. Revs Reflect Computer Sys Upgrade & Installation of Phase II Dynamics to Replace Plant Full Scope Simulator
ML20062F103
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/14/1990
From: Beckman W
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20062F107 List:
References
NUDOCS 9011270090
Download: ML20062F103 (2)


Text

_ _ _

C00 Sum 8IS power

""**'8"'"'*"

Hant Manager MERM MEWMW% MROGME55 Dig P;ck Point Nuclear Plan.10269 US 31 North, Charlevoix, MI 49720 November 14, 1990 Nuclear '4cgulatory Commission Document Control Desk Washing'.on, DC 20555 DOCKET 10-155 - LICENSE DPR BIC ROCK POINT PLANT -

SIMULATION FACILITY APPLICATION - FOR NRC APPROVAL - REVISION 1 Attached are revisions to our Simulation Facility Application for NRC approval which was submitted by letter dated June 29, 1990. The revisions are in the form of page changes.

Please replace those pages in the existing Application with the attached pages. ' Changes are noted by lines or slashes in the right hand margin.

The changes primarily focus on two issues. The first results from our deci-sion to upgrade the computer system from two Compac 386/33 Mhz machines to one SAI Taurus Technologies Inc 860 computer system. This upgrade will, in affect, provide an unlimited input / output (1/0) capacity whereas the earlier design requ. ired a trade off between I/O capacity and the need to meet real time simulation of accident and transient scenarios.

The earlier design philosophy required that we develop an alternative resolu-tion for some of the control manipulations that are referred within the Application as Resolution No.3 - Other dynamic simulation.

These other dynamic simulations were scheduled to take considerable time to design, fabricate, and install alternative actuation circuits, many of which would scavenge from existing RP7ACT I/O signals. The SAI Taurus 860 computer system will permit e tn ea..ider and treat all devices resolved via either resolution No.2, RETACT I/O or resolution No.3, other dynamics as virtaa11y synonymous.

The second issue addressed by the enclosed changes relates to our plan con-cerning tne Dresden Simulator. The computer syste.n upgrade is intended to accelerate the installation of Phase II dynamics to a level sufficient to eliminate the need for the Dresden full scope simulator.

It is our plan, to complete a sufficient level of Phase II devices by the May 26, 1991 date to justify the BRP-LSS as adequate for evalusting the competency factors that were to be evaluated via the Dresden operating test. Our decision regarding the capabilities of the BRP-LSS vs Dresden will be reflected in the final revision to this Application by May 26, 1991.

OC1190-0004A-BL01 0

l 9011270090 901114

(

\\

3 DR ADOCK 0500 3

,.,, C4tg(NepGy(gyp,yy

Nuclear Rsgulatory Commission Big Rock Point Plant Simulation Facility Application - Rev 1 November 14, 1990 Please replace or add pages and/or sections to our June 29, 1990 Application as specified by the attached.

y

/% -

Will am L Beckman Plant Manager CC Administrator, Region III, USNRC NRC Resident Inspector - Big Ror.k Point OC1190 0004A-BL01