ML20062E957

From kanterella
Jump to navigation Jump to search
Comments on May 1982 Monthly Rept for Environ Cleanup Stds. No Changes to Costs or Final Delivery of Contracted Products Authorized
ML20062E957
Person / Time
Issue date: 07/28/1982
From: Flory C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Wogman N
Battelle Memorial Institute, PACIFIC NORTHWEST NATION
References
CON-FIN-B-2216, REF-WM-40 NUDOCS 8208110011
Download: ML20062E957 (2)


Text

.

s l'

RETURN TO WMUR 467_SS DISTRIBUTION:

WM-82-40]

Dr. N. A. Wogman

\\Prnhet File WM : JUL 2 8 1982 VM s/f WMUR r/f WMUR w/f WM r/f NMSS r/f a

ry BPFisher l

WMUR:CAF HJPettengill WM-40 JJLinehan 426.3 FIN B-2216 DEMartin RAScarano Dr. N. A. Wogman, Manager REBrowning Radiological & Inorganic JBMartin Chemistry Section MHais field Battelle Pacific Northwest Laboratories P. O. Box 999 Richland, WA 99352 i-

Dear Dr. Wogman:

I have reviewed your monthly report for the " Environmental Cleanup Standards" (B-2216) for May, 1982, and have the following comments:

1)

Your draft report, " Recommended Procedures for Measuring Radon Fluxes from Disposal Sites of Residual Radioactive Materials" (dated May,1982) was reviewed and comments were forwarded to Mr. James Young in a separate letter dated July 19, 1982.

2)

The radon flux report should be included in the report " Recommended Procedures for Identifying Properties that Require Remedial Action, i

and for Verifying that Remedial Action Has Been Successful" as section four (4) in Part II " Radiological Surveys'.

J j

3)

Your Financial Statement for May,1982 was acceptable.

~

All other aspects of your May,1982 report were adequate.

The actions taken by this letter are considered to be within the scope of the current contract (B_2216).

No changes to costs or final delivery of contracted products is authorized.

Please notify me immediately if you

\\

8208110011 820728 l

PDR WASTE WM-40 PDR 40/426.3/2216/mab/82/07/27/1 10FC :

~NAME :

jDATE:

-.i-e

--_,-.-+#wa tE---m m

w cm->r un-w

---F

-1" P"-

N'T*'

""~ '"

Dr. N. A. Wogman JUL 2 8 1982 believe this letter would result in changes or final delivery of contracted products. These matters were discussed with J. Young (PNL) by C. Flory (NRC) during a telephone conversation on July 26, 1982.

Sincerely, Original signed by Claude A. Flory, Project Manager Operating Facility Section II Uranium Recovery Licensing Branch Division of Waste Management cc:

R. Perkins, PNL P. O. Jackson, PNL J. Young, PNL 40/426.3/2216/mab/82/07/27/1 0FC :

_____:WUR.l.g'_ _ _ _ _ _ : _ FMU1_ + _ _ : MTR _ _!hjf_ : _ _ _ _ _ _ _ _ _ _ _ _ : _ _ _

N AM E [.CAf) pry _an_b_ _ l _ p P Fi s h er_ _ _ f ig_P t_tyggj)) [ _ _ _ _ _ _ _ _ _ _ _ _ l _ _ _ _ _

i DATE :

7/ C /82 7/ @ /82 7/ -[//82

,