ML20062E884

From kanterella
Jump to navigation Jump to search
Forwards Insvc Inspec NIS-1 Data Rept & Summary Resulting from Summer 1978 Refueling Outage Including a Summary Rept of the Steam Generator Channel Head Visual & Ultrasonic Inspec
ML20062E884
Person / Time
Site: Indian Point 
Issue date: 12/06/1978
From: Early P
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML100271756 List:
References
NUDOCS 7812130168
Download: ML20062E884 (1)


Text

_.

O-276 POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMous CIRCLC NEW YORK N. Y.10019 (212) 307 6200 T RUST, t 9 GEORGE T. BERRY f REDERfCK R. CLARK

""E" c Ata-N ta wis,r,,o,g nErr _

g ofoRcE t.vuoAtts V IC E CHARAMAN g Gg- <NeuL RICH ARD M. FLYNN As s AN GEh NAL M A N A G E R.I NGIN E E RING RongRT 1. MILLONZ1 g

g7g witu A M r. " '

IPO-177

%"w'N LEAnOn THOM AS F. MCCRANN.JR.

CO NTR O LL E R Director of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D.C.

20555

.,i

~

Attention:

Mr. Albert Schwencer, Chief

[.' '

Operating Reactors Branch No. 1 f

Subject:

Indian Point Unit No. 3 Inservice Inspection Report for First Refueling Outage

Reference:

Docket No. 50-286

Dear Mr. Schwencer:

Enclosed are ten (10) copies of the Indian Point Unit No. 3 Nuclear Power Plant " Inservice Inspection NIS-1 Data Report and Summary" resulting from the summer 1978

]

refueling outage.

j This firs.t refueling outage inservice inspection was i

w.iducted in accordance with the ASME Boiler and Pressure l

Vessel Code Section XI, 1970 edition and the Plant Technical Speci fi ca tion.

However, one weld on the Pressurizer, (Weld L-1)

I was inspected in accordance with Sect XI, 1974 edition S75 l

addenda as approved by NRC in Technical Specification Amend-ment No. 16.

I Also, included in the summary report, are the results of the Steam Generator Channel Head visual and ultrasonic j

^

inspection as required by the Plant Technical Specifications.

Remova) of Reactor Surveillance capsule "T" was also accomplished during this outage and specimen testing is now being conducted.

Very tru1 p ours,

/'

, ( '/.s. I. L._ q y

PaulfJ. Early e r - '

Assistant Chj'f Engineer-Projects

/