ML20062E641

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1990 for Jm Farley Nuclear Plant Unit 1
ML20062E641
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/31/1990
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NA-90-5637, NUDOCS 9011210142
Download: ML20062E641 (5)


Text

Na-l-

/ Alab ma Power Company 40 inverncas C:ntir Parkway Post Office Dox 1295 Dirmingham, Alabama 35201 Telephone 205 068 5581 W. O. Hairston,111 Senior Vice President Nuclear Operations ggg g, NA-90-5637 tre souttern sectre system Noventier 14, 1990 Docket No. 50-348 U. S. Nuclea.: Regulatory Commission ATTN Document Control Desh Vashington, D. C. 20555 Joseph H. Parley Nuclear Plant Unit 1 Monthly operating Data Report Attached is the October 1990' Monthly Operating Report for Joseph H. Parley Nuclear Plant Unit 1, as required by Section 6.9 1.10 of the Technical Specifications.

If you have any questions,-please advise.

Respectfully submitted, 6

kr X1 . flairston, III JARiedb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell f

4 d

  • PDR ADOCK O'30003(9 ,

P Dt.

R.. . ,

i

-~

a

'c

.' '- 4 c

JOSE 111 M. FARLEY NUCLEAR PLANT UNIT I JUU.TI\'E SitFIARY OF OPFJMTIONS '

October, 1990 Timre were no significant Imer reductioris during the snonth of' Octotor.

The f ollowing nnjor safet.y-relat.ed neitrit enatice wis terrotwx1 during the nonth of Octolor:

-1. Miscellaneous corrective arrl preventive uninteruuce uts perfonurxl on t.he diesel generntors.

f l

e i

l )(1 4

. OPERATING M'In REPORT DOCKET NG. 50-348 IW1E November 5, 1990 CCMPLE'ITD BY D. N. Morey

'IELEPHONE (205)899-5156 OPERATING S'm'IUS Notes

1. Unit Name: Joseph M. Farley - Unit 1 1) Cumulative data since
2. Reporting Period October 1990 12-1-77, date of
3. Licensed hermal Power (Mt): 2,652 comercial operation.
4. Nameplate Rating (Gross Me): 860
5. Design Electrical Rating (Net Me): 829
6. Maximum Dependable capacity (Gross MWe): 866.1
7. Maximum Dependable Capacity (Net MWe): 823.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A W is Month Yr-to-Date cumulative
11. Hours In Reporting Period 745 7,296 113,232
12. Number Of Hours Reactor Was Critical 745.0 7,231.9 87,490.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 745.0 7,217.5 85,927.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,974,496 18,601,963 219,755,879
17. Gross Electrical Energy Generated (MWH) 639,710 6,022,582 70,787,732
18. Net Electrical Energy Generated (im) 607,692 5,708,522 66,803,488
19. Unit Service Factor 100.0 98.9 75.9
20. Unit Availability Factor 100.0 98.9 75.9
21. Unit Capacity Factor (Using MDC Net) 99.0 95.0 73.0
22. Unit Capacity Factor (Using DER Net) 98.4 94.4 71.2
23. Unit Forced Outage Rate 0.0 1.1 7.6
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and DuTation of Each):

Ref'aling/ Maintenance outage, March 8, 1991, approximately 7 weeks.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09M7 INITIAL ELECTRICITY 08/20M7 08/18M7 COFMERCIAL OPERATION 12/01M7 12/01M7 Form 2/34

-u.*,.. .. ,, i,,,,,,

DOCKET No. 50-348 UNIT 1 MTE November 5, 1990 COMPLETED BY D. N. Morey TELEPHONE (205)e99-5156 MON'IH October DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1' 811 17 814 2 809 18 813 3 809 19 824 4 808 20 820 5 815 21 817 6 810 22 813 7 809 23 820 8 810 24 822 9 810 25 823 10 811 26 827 11- 815 27 824 12 793 28 858 13 813 29 823 14 819 30 821 15 820 31 823 i

16 818 INSTRUCTICNS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21-

~h UNIT SEUTDOWES AND PotrER EIDeCTIC5tl DOCEIT 50. 50-348 -

UNIT MAME J. M. FARI.ET - UNIT 1*

DATE November 5,1990 *

  • COMPLETED ST D. N. MORET REPORT MONTE OCTOBER TELEPHONE (2051899-5156 l l METHOD CF I LICENSEE' l l l CAUSE & CDRRECTIVE l l l l l l EvtsT I xTres To I l 1- 1 I DeRuros i I SYSTE.M 1 Co-restwT  ;

I TrrE 1

I (noeRs) 2 1,snUrTrno,,,, ,,,c,,,3 y ,,,,, , ; cc,, g co,,s , ,,,,, , ,,cy,,,,c, ,

iso. I DATE 1 REAses  ?

lThere were no unit shutdowns or significant power reductions during the month of October. l l i i l I I l 1 1 I I I I I I I I I I I I I I I

i _i I I i l i I I I I

I I I I I I I I I I I I I I I I I I I I I i l I I I I I i I I I I I i  ! I 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I i I I l i i i i i i i l I i i i I I i l i l i l I I I I I I

! I I I I I I I I i i I l-I I I I I I I 1 I I I I I I I I I I I I I I i I I I i i i I i i i l I I I i I I I l' I i 1 1 I I I

I I I I I I I I I I I I I I I I I I I I I I

Reason: Method: Exhibit G-Instructions F: Forced A-Equipment Failure (Explain) 1-Manual for Preparation of Data S: scheduled B-Maintenance or Test 2-Manual Scram. Entry sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (EUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Itzamination F-Administrative Exhibit I -Same source G-operational Error (Explain)

B-Other (Explain)

M Rx2n M