Notification That the NRC Safety Eval of Proposed Tech Spec Change Re Allowable Limits for Settlement of Svc Water Pumphouse Is Sched for the End of November
ML20062E118
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 11/15/1978
From: Swanson D
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Buck J, Mike Farrar, Rosenthal A
NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP)
References
NUDOCS 7812040251
Download: ML20062E118 (1)


Text

,#

UNITED STATES e~

M NUCt. EAR REGULATORY COMMISSION f,1 WASMNGTON. D. C. 20555

(/

November 15, 1978 g

NCp Alan S. Rosenthal, Esq., SSEElaiD,7 g,'-Atomic Safety and Licens Michael C. Farrar, Esq.

Atomic Safety and. Licensing Appeal Board Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Ccmmission Washington, D.C.

20555 Washington, D.C.

20555 Dr. John Buck Atomic Safety and Licensing Appeal pi'% /y Board U.S. Nuclear Regulatory Commission

@j' g

c Washington, D.C.

20555 7

9 [7e In the Matter of i I 3

Virginia Elec fic nd Power Company N

(North Anna Nuclear,ower tation, Units 1 and

$ p'y f

Docket Nos.

0-338 L and 50-339 OL

'*I Gentlemen:

I wish to inform the Atomic Safety and Licensing Appeal Board that the completion of the NRC Staff's safety evaluation of the proposed technical specification change for the North Anna Unit 1 Operating License regard-ing the allowable limits for settlement of the service water pumphouse is currently scheduled for the end of November.

The Staff is aware of the need for prompt resolution of this matter, in that the Appeal 8 card's review of the Initial Decision authorizing the issuance of operating licenses for North Anna Units 1 and 2 is being delayed pending receipt of the Staff's evaluation. The delay was necessitated, however, by the Staff's recent determination that it must evaluate the effects of the pumphouse settlement on connections between the pumphouse and spray piping, and that it should consider in greater detail the monitoring system for the auxiliary service water structure on Lake Anna.

Sincerely, Aaruid KL Daniel T. Swanson Counsel for NRC Staff cc:

Dr. Paul W. Purdem John J. Runzer, Esq.

Mr. R. B. Briggs Mr. James M. Torsen Michael W. Mauphin, Esq.

Mr. Bradford Whitman Richard Foster, Esq.

Mrs. James C. Arnold Dr. Kenneth A. McCollom Mr. William Warren Anthony Gambardella, Esq.

Atomic Safety and Licensing Mrs. June Allen Board Panel Mrs. Margaret Dietrich Atomic Safety and Licensing Mr. Dean P. Agee Appeal Panel William H. Rodgers, Jr., Esq.