Fr Notice of Granting Relief from Certain Requirements of Amse Boiler & Pressure Vessel Code,Section XI Re Inservice Insp of Nuclear Power Plant Components
ML20062E092
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/29/1982
From: Miner S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20062E086 List:
References
NUDOCS 8208060336
Download: ML20062E092 (2)


Text

.... -..............

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-346 THE TOLEDO EDIS0N COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY NOTICE OF GRANTING RELIEF FROM ASME CODE REQUIREMENTS.

The U.S. Nuclear Regulatory Comission (the Commission) has granted relief from certain requirements of the ASME Code, Sectica XI, " Rules for Inservice Inspection of Nuclear Power Plant Components,"

to The Toledo Edison Company and The Cleveland Electric Illuminating Company, which revised the inservice inspection program for the Davis-Besse Nuclear Power Station, Unit No.1, located in Ottawa County, Ohio. The ASME Code requirements are incorporated by reference into the Comission's Rules and Regulations in 10 CFR Part 50. The relief is effective as of the date of issuance.

This action provides relief from performing a hydrostatic test on certain piping system welds of the auxiliary feedwater header i

replacement system..' An alternative pressure testing program will be j

performed.

i The request for relief complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate l

findings as required by the Act and the Comission's rules and regulations

)

in 10 CFR Chapter I, which are set forth in the letter granting relief and accompanying Safety Evaluation.

8208060336 920729 PDR ADOCK 05000346 O

PDR

.u

__..._x 7590-01

. The Commission has determined that the granting of this relief will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with this action.

For further details with respect to this action, see (1) the letter from The Toledo Edison Company dated June 22, 1982, (2) the letter to The Toledo Edison Company dated July 29, 1982, and (3) the Commission's related Safety Evaluation. All of thesc items are available for public inspection at the Commission's Public Document Room,1717 H Street, N.W., Washington, D.C. and at the William Carlson Library, University of Toledo, 2801 Bancroft Avenue, Toledo, Ohio.

A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.

E0555, Attention:

Director Division of Licensing.

Dated at Bethesda, Maryland, this 29th day of July 1982.

FOR THE NUCLEAR REGULATORY COMMISSION 7

M Sydnev Miner, Acting Chief Operating Reactors Branch #4 Division of Licensing t