ML20062D788
| ML20062D788 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/20/1978 |
| From: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| ST-HL-AE-307, NUDOCS 7811300216 | |
| Download: ML20062D788 (2) | |
Text
s
.n.m
,a 75..
~,
^ ^ ^
E ? ?":, _ ^
n j
p..
Houston i
1 khr
!"* -4 l
I COm)any ar;jg " %~ll:g 1
v.c* %. a ir'.
I Electric Tower L,
RO Box [700 to 1
u L
Houston. Texas 77001 November 20, 1978
~
~~
~
~
ST-HL-AE-307 d
Director, Region IV Office of Inspection and Enforcement Nuclear Regulatory Commission Suite 1000 614,Ryan Plaza Drive ArlinitbM; Texas 76102 t
I
Dear Sir:
South exas ect f
U its'
'& 2 Docket Nos. S 50-498, 50-h99 Interim Report on t e Report le Deficiency Concerning Containmen Voids or Unit 1 of i
the South Texas Project On October 20, 1978, pursuant to 10 CFR 50 55(e)(2), Houston Lighting & Power Company notified your office of concrete voids be-hind the liner plate in the reactor building exterior vall. If left uncorrected, these voids could have compromised the structural in-tqrity of the containment in that the containment as built could not O.
meet its design load criteria. Repair methods to restore the appro-priate level of safety to the containment are being investigated.
y These methods vill be tested and the results analyzed befor'e they are implemented.
The repairs should be completed by May,1979 At that time a
[
final report providing a description of the deficiency, an analysis of the safety implications and the corrective actions taken to pre-vent reoccurrence of the problem vill be submitted to your office.
J Very tru3y yours,
,P. a. c.
E. A. Turner Vice President Power Plant Construction h