ML20062D511

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 45 to License NPF-3
ML20062D511
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/28/1982
From: Miner S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20062D488 List:
References
NUDOCS 8208060108
Download: ML20062D511 (2)


Text

'

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-346 THE TOLED0 EDISON COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 45 to Facility Operating License No. NPF-3, issued to The Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees), which revised Technical Specifications (TSs) for operation of' the Davis-Besse Nuclear Power Station, Unit No.1 (the facility) located in Ottawa County, Ohio. The amendment is effective as of its date of is s ua nce.

This amendment modifies the TSs to permit operation for a third cycle.

This cycle has a design lengtn of 230 Effective Full Power Days (EFPD), how-ever, the TSs provide flexibility to permit an extension of cycle length to 268 + 10 EFPD.

The modified TSs also incorporate revised Reactor Protection System instrumentation trip setpoints, allowable values, and Reactor Protec-tion System instrument response times.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Commission has made appropr,' ate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

8208060108 820728 DR ADOCK 05000346 PDR

7590-01 The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.

For further details with respect to this action, see (1) the applica-tion for amendrent dated March 5,1982, as revised and supplemented March 23, 1982, June 1, 1982, and June 21,1982,(2) Amendment No. 45 to License No.

NPF-3, and (3) the Commission's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW, Washington, DC, and at the William Carlson Library, University of Toledo, 2801 Bancroft Avenue, Toledo, Ohio.

A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Conmission, Washington, DC 20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 28th day of July 1982.

FOR TH: NUCLEAR REGULATORY COMMISSION Sydney Miner, Acting Branch Chief Operating Reactors Branch #4 Division of Licensing