ML20062C869
| ML20062C869 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/21/1982 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20062C863 | List: |
| References | |
| 1-279, NUDOCS 8208050385 | |
| Download: ML20062C869 (1) | |
Text
.
e.
TOLEDO EDISON Docket No. 50-346 License No. NPF-3 Rowo P. CAOUSE v<.sv. - t PduCleF Serial No. 1-279 mm ag wa, July 21, 1982 Mr. James G. Keppler, Director U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Toledo Edison acknowledges receipt of your June 25, 1982 letter and Inspection Report No. 82-17 referencing apparent non-compliance with NRC requirements.
Toledo Ldiuon's response to the apparent items of non-compliance are attached.
Application is made to withhold the enclosed information from public disclosure pursuant to 10 CFR Part 2.790(d).
Yours very truly,
/ff 1
l RPC:GMG:ds Enclosure cc: NRC Davis-Besse Resident Inspector JUL 2 ' 1932 egepg@foNbp l
n o
EDISON PLAZl,l I l
THE TOLEDO EDISON COMPANY
- 300 MADISON AVENUE TOLEDO. OHIO 43652 Hl A