ML20062C647

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Velan Engineering Supplied Valve Stud Matl Not Recognized Under ASME Section Iii.Initially Reported on 820629.Investigation of Deficiency Incomplete. Next Rept Will Be Provided by 820909
ML20062C647
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/28/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-63, RBF-13-113, RVF-13-113, NUDOCS 8208050316
Download: ML20062C647 (1)


Text

GULF STATES UTILITIES COMPANY

.g POST o F F IC E box 2951

  • BEAUMONT. TEXAS 77704 AREA CooE 713 838 6631 July 28, 1982 RBG- 13,113 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regula' ary Commission Region IV, Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 M

[@$ p/{k ]  ; ,

Arlington, Texas 76011 ,, l

Dear Mr. Collins:

2N f. l River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-63 On June 29, 1982, Gulf States Utilities Company (GSU) notified your office of a condition potentially reportable under 10CFR50.55(e) concerning Velan Engineering LTD supplied valve studs material not recognized for use under ASME Section III. GSU has not completed its investigation at this time. An interim or final status report will be provided by September 9, 1982.

Sincerely, I

J. E. Booker Manager-Engineering & Licensing River Bend Nuclear Group J /kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission

Washington, D. C. 20555 M .

8208050316 820728 gDRADOCK 05000458 PDR