2 SC 'l R
'. ~.
i.'llt?13.4T 1 TTS
~
1LCLEAp EEqulMCHY C:'MA;..,3!c'J Di(,[
IMMNC 0.'s O C. M2 ;5 J
I
~'
OCT 3 01978 l
/m L, -)
9
/
in {.
Docket Nos. 50-502
/
MEMORANDUM FOR: Distribution FROM:
Robert Capra, Licensing Project Manager, Light Water Reactors Branch No. 3, OPM
SUBJECT:
GENERAL INFORMATION ITEMS APPLICABLE TO THE TECHNICAL REVIEWERS ASSIGNED TO THE HAVEN NUCLEAR PLANT Effective 09/28/78, the Haven Nuclear Plant safety review was reassigned from Robert Stright to me.
Wisconsin Electric Power Company has sent a letter to the NRC stating that they will amend their application for a construction permit to build a single unit nuclear power plant at the Haven site.
I anticipate that the amencment when received will cause only minor readjustments in your review.
Based on the schedule by which we have been conducting the review up to this time, I have submitted all Round One Questions to the applicant with the exception of the Structural Engineering Branch.
For your information, the following is a summary of the major milestones in the review:
Applicant's Response to Q-l's 11/09/78 Formal Staff Positions to LPM 01/19/79 Applicant's Response to FSP 03/23/79 SER input to LPM 05/18/79 SER issued 08/01/79 Since the Haven plant is a replicate of the Koshkonong plant, all questions to the applicant have used the old numbering system for continuity. Enclosure 1
~
is a cross-reference list which shows the old and new numbering system. You will need this cross-reference when the applicant's responses are received.
In addition, Enclosure 2 is a copy of the Round One Questions, applicable to your branch, which have been transmitted to the applicant.
~
7811070053 A
4 i
l i
2 GCT a u 1973 l
1 If you have any questions, my extension is 27896 and my office is Room 130 of the Phillips Building.
I Robert Capra, Project Manager Light Water Reactors Branch No. 3.
Division of Project Management
Enclosures:
I 1.
Question Number Cross-Reference l
List 2.
Round One Questions (applicable l
to branch)
)
r I-i f
r e
4 i
i l-i t
I I
1 i
f L
i
-r
-m,-
-r.~--.---.y.,--.--v
w
%,f ENCLOSURE 1
-Branch cuestion and staff oosition cross-reference list for numbering NUMBERS TO BE UTILIZED FOR STANDARDIZED THE HAVEN REVIEW BRANCH REVIEW AREA BRANCH NUMBERS i
010.
ETSB All Areas 320/321/322 020.
ASB All Areas 010/011/012 042.
CSB All Areas 020/021/022 110.
MEB All Areas 110/111/112 I
120.
MTES All Areas 120 121.
MTES Mat. Integ.
121 122.
MTEB Metallurgy 122 130.
SEB All Areas 130/131/132 214 RSB All Areas 210/211/212 221.
I&CSB All Areas 030/031/032/033
+
f 222.
PSB All Areas 040 240.
AB All Areas 220/221/222 241.
CPB Fuels 230/231 242.
CPB Physics 230/232 312.
AAB All Areas 310/311/312 321.
HMB Hydrologic Eng.
370/371 331.
RAB All Areas 330/331/332 360.
GSB Seismology 360 361.
GSB Geology 361 j
362.
GSB Geo. Tech 362 372.
HMB Meterology 370/372 410.
QAB Financial 410 7
411.
CAB Quality Assur.
421 41 2.
QAB Cond. of Ops.
422 41 3.
0AB Init. Test & Oos.
423 430.
OLB Training 441 431.
OLB Procedures 442 432.
AAB Emerg. Plan.
432 500.
RSLB Rx. Safeguaros 500 i
r l
l l
T I
l
.-------4e
,,.,. -. ~.
.s t.
~
'nc u m rss f
wcLEAa rem;LArcay ca.:.u.;3:c 4
- somc~ n : c.=us
.T'J f
OCT 3 0 s78 Docket Nos. 50-502 MEMORANDUM FOR: Distribution FROM:
Robert Capra, Licensing Project Manager, Light Water Reactors Branch No. 3, OPM
SUBJECT:
GENERAL INFORMATION ITEMS APPLICABLE T0.THE TECHNICAL REVIEWERS ASSIGNED TO THE HAVEN NUCLEAR PLANT Effective 09/28/78, the Haven Nuclear Plant safety review was reassigned from Robert Stright to me.
Wisconsin Electric Power Company has sent a letter to the NRC stating that they will amend their application for a construction permit to build a single unit nuclear power plant at the Haven site.
I anticipate that the amendment when received will cause only minor readjustments in your review.
Based on the schedule by which we have been conducting the review up to this time, I have submitted all Round One Questions to the applicant with the exception of the Structural Engineering Branch.
For your information, the following is a summary of the major milestones in the-review:
Applicant's Response to Q-l's 11/09/78 s
Formal Staff Positions to LPM 01/19/79 Applicant's Response to FSP 03/23/79 SER input to LPM 05/18/79 i
SER issued 08/01/79 Since the Haven plant is a replicate of the Koshkonong plant, all questions to the appitcant have used the old numbering system for continuity. Enclosure 1 is a cross-reference list which shows the old and new numbering system. You will need this cross-reference when the applicant's responses are received.
l In addition, Enclosure 2 is a copy of the Round One Questions, applicable to your branch, which have been transmitted to the applicant.
I f
e t
-2 CCI L 01975 If you have any questions, my extension is 27896 and my office is Rocm 130 of the Phillips Building.
Robert Capra, Project Manager 3
Light Water Reactors Branch No. 3 Division of Project Management
Enclosures:
l.
Question Number Cross-Reference List t'
2.
Round One Questions (applicable to branch) 4 e
1 i-t e
i e
i h
9 m
=
ENCLOSURE 1
- Branch ouestion and staff cosition cross-reference list for numbering P
i NUMBERS TO BE t
UTILIZED FOR STANDARDIZED t
THE HAVEN REVIEW BRANCH REVIEW AREA
-BRANCH NUMBERS l
010.
ETSB All Areas 320/321/322 5
020.
ASB All Areas 010/011/012 042.
CSB All Areas 020/021/022 t
110.
MEB All Areas 110/111/112 120.
MTES All Areas 120 121.
MTES Mat. Integ.
121 122.
MTEB Metallurgy 122 130.
SES All Areas 130/131/132 214 RSB All Areas 210/211/212 221.
I&CSB All Areas 030/031/032/033 222.
PSB All Areas 040 240.
AB All Areas 220/221/222 241.
CPB Fuels 230/231 242.
CPB Physics 230/232 312.
AAB All Areas 310/311/312 321.
HMS Hydrologic Eng.
370/371 331.
RAB All Areas 330/331/332 360.
GSB Seismology 360 361.
GSB Geology
.361 362.
GSB Geo. Tech 362 372.
HMB Meterology 370/372 410.
QAB Financial 410 411.
QAB Quality Assur.
421 412.
QAB Cond. of Ops.
422 413.
0AB Init. Test & Oos.
423 i
430.
OLB Training 441 431.
OLB Procedures 442 432.
J{(p Rx. Safeguards 500 AAB Emerg. Plan.
432 r
500.
~
l i
(
i s
i
. -, _