ML20062C148

From kanterella
Jump to navigation Jump to search
Informs of Reassignment of Safety Review to Author Branch, Effective 780928.CP Application Will Be Amended for single- Unit Plant.Forwards Summary of Milestone Schedule & cross- Ref List for Numbering Sys
ML20062C148
Person / Time
Site: 05000502
Issue date: 10/30/1978
From: Capra R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7811070053
Download: ML20062C148 (3)


Text

2 SC 'l R

'. ~.

i.'llt?13.4T 1 TTS

~

1LCLEAp EEqulMCHY C:'MA;..,3!c'J Di(,[

IMMNC 0.'s O C. M2 ;5 J

I

~'

OCT 3 01978 l

/m L, -)

9

/

in {.

Docket Nos. 50-502

/

MEMORANDUM FOR: Distribution FROM:

Robert Capra, Licensing Project Manager, Light Water Reactors Branch No. 3, OPM

SUBJECT:

GENERAL INFORMATION ITEMS APPLICABLE TO THE TECHNICAL REVIEWERS ASSIGNED TO THE HAVEN NUCLEAR PLANT Effective 09/28/78, the Haven Nuclear Plant safety review was reassigned from Robert Stright to me.

Wisconsin Electric Power Company has sent a letter to the NRC stating that they will amend their application for a construction permit to build a single unit nuclear power plant at the Haven site.

I anticipate that the amencment when received will cause only minor readjustments in your review.

Based on the schedule by which we have been conducting the review up to this time, I have submitted all Round One Questions to the applicant with the exception of the Structural Engineering Branch.

For your information, the following is a summary of the major milestones in the review:

Applicant's Response to Q-l's 11/09/78 Formal Staff Positions to LPM 01/19/79 Applicant's Response to FSP 03/23/79 SER input to LPM 05/18/79 SER issued 08/01/79 Since the Haven plant is a replicate of the Koshkonong plant, all questions to the applicant have used the old numbering system for continuity. Enclosure 1

~

is a cross-reference list which shows the old and new numbering system. You will need this cross-reference when the applicant's responses are received.

In addition, Enclosure 2 is a copy of the Round One Questions, applicable to your branch, which have been transmitted to the applicant.

~

7811070053 A

4 i

l i

2 GCT a u 1973 l

1 If you have any questions, my extension is 27896 and my office is Room 130 of the Phillips Building.

I Robert Capra, Project Manager Light Water Reactors Branch No. 3.

Division of Project Management

Enclosures:

I 1.

Question Number Cross-Reference l

List 2.

Round One Questions (applicable l

to branch)

)

r I-i f

r e

4 i

i l-i t

I I

1 i

f L

i

-r

-m,-

-r.~--.---.y.,--.--v

w

%,f ENCLOSURE 1

-Branch cuestion and staff oosition cross-reference list for numbering NUMBERS TO BE UTILIZED FOR STANDARDIZED THE HAVEN REVIEW BRANCH REVIEW AREA BRANCH NUMBERS i

010.

ETSB All Areas 320/321/322 020.

ASB All Areas 010/011/012 042.

CSB All Areas 020/021/022 110.

MEB All Areas 110/111/112 I

120.

MTES All Areas 120 121.

MTES Mat. Integ.

121 122.

MTEB Metallurgy 122 130.

SEB All Areas 130/131/132 214 RSB All Areas 210/211/212 221.

I&CSB All Areas 030/031/032/033

+

f 222.

PSB All Areas 040 240.

AB All Areas 220/221/222 241.

CPB Fuels 230/231 242.

CPB Physics 230/232 312.

AAB All Areas 310/311/312 321.

HMB Hydrologic Eng.

370/371 331.

RAB All Areas 330/331/332 360.

GSB Seismology 360 361.

GSB Geology 361 j

362.

GSB Geo. Tech 362 372.

HMB Meterology 370/372 410.

QAB Financial 410 7

411.

CAB Quality Assur.

421 41 2.

QAB Cond. of Ops.

422 41 3.

0AB Init. Test & Oos.

423 430.

OLB Training 441 431.

OLB Procedures 442 432.

AAB Emerg. Plan.

432 500.

RSLB Rx. Safeguaros 500 i

r l

l l

T I

l

.-------4e

,,.,. -. ~.

.s t.

~

'nc u m rss f

wcLEAa rem;LArcay ca.:.u.;3:c 4

somc~ n : c.=us

.T'J f

OCT 3 0 s78 Docket Nos. 50-502 MEMORANDUM FOR: Distribution FROM:

Robert Capra, Licensing Project Manager, Light Water Reactors Branch No. 3, OPM

SUBJECT:

GENERAL INFORMATION ITEMS APPLICABLE T0.THE TECHNICAL REVIEWERS ASSIGNED TO THE HAVEN NUCLEAR PLANT Effective 09/28/78, the Haven Nuclear Plant safety review was reassigned from Robert Stright to me.

Wisconsin Electric Power Company has sent a letter to the NRC stating that they will amend their application for a construction permit to build a single unit nuclear power plant at the Haven site.

I anticipate that the amendment when received will cause only minor readjustments in your review.

Based on the schedule by which we have been conducting the review up to this time, I have submitted all Round One Questions to the applicant with the exception of the Structural Engineering Branch.

For your information, the following is a summary of the major milestones in the-review:

Applicant's Response to Q-l's 11/09/78 s

Formal Staff Positions to LPM 01/19/79 Applicant's Response to FSP 03/23/79 SER input to LPM 05/18/79 i

SER issued 08/01/79 Since the Haven plant is a replicate of the Koshkonong plant, all questions to the appitcant have used the old numbering system for continuity. Enclosure 1 is a cross-reference list which shows the old and new numbering system. You will need this cross-reference when the applicant's responses are received.

l In addition, Enclosure 2 is a copy of the Round One Questions, applicable to your branch, which have been transmitted to the applicant.

I f

e t

-2 CCI L 01975 If you have any questions, my extension is 27896 and my office is Rocm 130 of the Phillips Building.

Robert Capra, Project Manager 3

Light Water Reactors Branch No. 3 Division of Project Management

Enclosures:

l.

Question Number Cross-Reference List t'

2.

Round One Questions (applicable to branch) 4 e

1 i-t e

i e

i h

9 m

=

ENCLOSURE 1

- Branch ouestion and staff cosition cross-reference list for numbering P

i NUMBERS TO BE t

UTILIZED FOR STANDARDIZED t

THE HAVEN REVIEW BRANCH REVIEW AREA

-BRANCH NUMBERS l

010.

ETSB All Areas 320/321/322 5

020.

ASB All Areas 010/011/012 042.

CSB All Areas 020/021/022 t

110.

MEB All Areas 110/111/112 120.

MTES All Areas 120 121.

MTES Mat. Integ.

121 122.

MTEB Metallurgy 122 130.

SES All Areas 130/131/132 214 RSB All Areas 210/211/212 221.

I&CSB All Areas 030/031/032/033 222.

PSB All Areas 040 240.

AB All Areas 220/221/222 241.

CPB Fuels 230/231 242.

CPB Physics 230/232 312.

AAB All Areas 310/311/312 321.

HMS Hydrologic Eng.

370/371 331.

RAB All Areas 330/331/332 360.

GSB Seismology 360 361.

GSB Geology

.361 362.

GSB Geo. Tech 362 372.

HMB Meterology 370/372 410.

QAB Financial 410 411.

QAB Quality Assur.

421 412.

QAB Cond. of Ops.

422 413.

0AB Init. Test & Oos.

423 i

430.

OLB Training 441 431.

OLB Procedures 442 432.

J{(p Rx. Safeguards 500 AAB Emerg. Plan.

432 r

500.

~

l i

(

i s

i

. -, _