ML20062B451
| ML20062B451 | |
| Person / Time | |
|---|---|
| Issue date: | 07/02/1982 |
| From: | Fleenor C NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Jennifer Davis, Rachel Johnson NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20062B453 | List: |
| References | |
| CON-NRC-02-82-042, CON-NRC-2-82-42 NUDOCS 8208040493 | |
| Download: ML20062B451 (1) | |
Text
" f. 34 O ht? 7',5
( g,, j g 4c 3,;g,.g g l
1 f4RC-02-82-042 DIVISION OF CONTR ACTS MODIF IC AllON tJUMBE R U.S. tJUCLE AR HE GUL ATORY CCMMISSION IWo (2)
W ASHINGT ON. D.C. 20555
_O NE W
@ MOOlF IC ATION OT H E R 15pecotyl NOTIFICATION OF CONTRACT EXECUTION John Davis, Director CONTR ACT HASE D ON-g 7,,gj AUTHOR 12 ATION NUMBE R Office of fluclear_fjaterial Safety & Safeguards oATE IOrganaatoon) b' A yfgp',
o I H OM:
Cind l}cepor 2 M. h
/
o CONTR ACT CH ANGES PER THIS ACTION
^
tomi Article lll-Consideration modified.
Technical Assistance Contracts Branch Division of Contracts, ADM CON T R AC I OR /t.' mr & E ocation)
EXECullON DAT E Golder Associates 7/2/82 Lakewood, CO 8228 TYPE OF CONT H ACT Time / Material FHOJECT TITLE PE HIOD OF PE RF ORM ANCE
~
4/7/82/-4/7/2/82 Nevada Test Site (fits) Visit PRINCIPAL ltJVE STIG AT OR Adrian Brown NRC AUTHORIZED REPHESENT ATIVE Rob.ert Johnson BF.R tJUMBE R F IN NUMBER N/A N/A AMDUNT NEW NRC FUNDS S F UNDING
~
TOTAL FY 82 FUNDING s
13,644.00 13,644.00 a
TOTAL NRC OBLtGAT)QNS GOVE RNMI NT F ROPE RTY AT T ACHME NT(5):
.q CONI R ACT DOCUME NT I __ _
l NRC F ORM 255
)
(1076) 8208040493 820702 PDR CONTR NRC-02-82-042 PDR l5%Mh7 M E%T S