ML20062B216
ML20062B216 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 10/11/1978 |
From: | Harding V NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Bechhoefer C, John Lamb, Luebke E AFFILIATION NOT ASSIGNED, Atomic Safety and Licensing Board Panel |
References | |
NUDOCS 7810230367 | |
Download: ML20062B216 (2) | |
Similar Documents at South Texas | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999
[Table view]Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20217D7031999-10-0707 October 1999
[Table view]Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217D7031999-10-0707 October 1999
[Table view]Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21 Category:NRC TO ASLP MONTHYEARML20214X2801986-12-0909 December 1986
[Table view]Advises That Time for Commission to Review Decision ALAB-849 Expired.Commission Declined Review.Decision Became Final Agency Action on 861201.Served on 861209 ML20197J7121986-05-16016 May 1986 Forwards LP Crocker Supplemental Affidavit Re Review of 860409 Amend 53 to Fsar,Including Changes to Chapter 13 Matl on Conduct of Operations ML20138B2291986-03-17017 March 1986 Forwards LP Crocker 860314 Memo Transmitting Correct Figure 13.1 to Appended Chapter 13 of SER (NUREG-0781),consisting of Util Organization Chart.Related Correspondence ML20141N9111986-03-14014 March 1986 Forwards LP Crocker Affidavit Re Applicant Organization for Operation & Section of Forthcoming Ser.Related Correspondence ML20138A3951986-03-10010 March 1986 Informs That Response to Applicant Affidavit Re Organization for Operation Concerning Hurricane Missile Contention Will Be Provided by 860317.Approval of Schedule Will Necessitate Extension of Response Time.Related Correspondence ML20137X0651986-02-28028 February 1986 Forwards Jn Wilson Affidavit,Concluding That Sum of Probabilities of Tornado or hurricane-borne Missile Damage Remains Below 1 X 10 -7 W/Consideration of Addl Pertinent Structures.Related Correspondence ML20214D0191986-02-19019 February 1986 Advises That SER Will Not Be Published in Feb 1986 Due to Nonconservatism Found in Analysis Supporting Auxiliary Feedwater Sys.Fsar & Tech Specs Will Require Changes.Delay Will Not Affect Filing of Testimony.Related Correspondence IR 05000498/19850211986-02-19019 February 1986 Advises That Const Appraisal Team Insp Repts 50-498/85-21 & 50-499/85-19 Sent to Applicant on 860205.Rept Also Transmitted to Board Due to Relevance to Issues B & D in Proceeding.Related Correspondence ML20138J1401985-12-13013 December 1985 Forwards Supplemental Proposed Findings of Fact & Conclusion of Law Per Board 851206 Order ML20136J2181985-11-19019 November 1985 Forwards Proposed Findings of Fact & Conclusions of Law Per ASLB 851030 Order.Proposed Findings on Contention 10 Subj to Change in Light of ASLB 851114 Memorandum & Order LBP-85-45 Requiring Reopening Hearings Be Held in Dec ML20128Q2271985-07-22022 July 1985 Notifies That Oeld Received Encl Statement of Allegations on 850703.Allegations Possibly Relevant to Issue D.W/O Encl. Related Correspondence ML20128Q2231985-07-22022 July 1985 Provides List of Cases to Which Citations Will Be Supplied. Related Correspondence ML20128A2971985-06-28028 June 1985 Advises That No Basis Exists to Subpoena Deyoung,Per Citizens Concerned About Nuclear Power,Inc 850626 Spec of Testimony Sought from Witnesses,In Response to ASLB 850626 Memorandum & Order.Related Correspondence ML20127N0361985-06-26026 June 1985 Forwards Testimony of Eh Johnson,Gl Constable,Rg Taylor, Ji Tapia,Dl Garrison,Ce Johnson,Dp Tomlinson,Dr Carpenter, DE Sells,Rf Heischman & Hs Phillips for Upcoming Hearing. Related Correspondence ML20126L7621985-06-17017 June 1985 Requests That RG Taylor,Reactor Inspector,Region Iv,Be Added to List of Prospective Witnesses for Phase II Evidentiary Hearing.Witnesses & Matters on Which Witnesses Will Testify Listed.Related Correspondence ML20211F5181982-06-28028 June 1982 Forwards SALP Board Rept Released on 820618.Deposition of Wc Hubacek on 840920 in District Court of Matagorda County, Tx Encl ML20058A6911982-06-25025 June 1982 Forwards IE Investigation Repts 50-498/82-02 & 50-499/82-02 on 820205,08-12,23 & 0311-19 & NRC Responding to Util Suggested Recommendations Per 10CFR2.790 ML20126F2551981-03-11011 March 1981 Responds to ASLB 810213 Notice of Prehearing Conference, Specifying Issues to Be Considered.Scheduling Matters Should Be Finalized & Oral Arguments Included on Applicant Motion & Intervenor Request ML20062G1911978-12-0404 December 1978 Reports That NRC Obtained,During Nov 1978,discovery Documents from Texas Utils Gen Co & Houston Lighting & Pwr Co.Nrc Contemplates Serving Its Interrogatories & Requests for Documents on Other Parties to Subj Facil Proc in Dec ML20148N2801978-11-17017 November 1978 Informs ASLB That fuel-loading for Subj Facil Has Been Slipped 18 Months from May 1980 to Nov 1981.Also Requests That Conferences Scheduled for 781205 Be Held W/O Strict Regard to Scheduled Times.W/Encl ANO:7811010144 ML20197B7231978-10-23023 October 1978 Forwards Agreement on Attachment of Antitrust Lic Condition for Subj Facil ML20062B5131978-10-23023 October 1978 Forwards Agreement on Attachment of Antitrust License Conditions for Unit 1 ML20062B2161978-10-11011 October 1978 Advises of Current Pending Requests for Hearing & Petitions for Leave to Intervene.Participant Representatives Can Be Available on 781103 for Special Prehearing Conference ML20147D6571978-10-0606 October 1978 NRC Has Completed Review of Some 30,000 Discovery Documents Pursuant to Filed Stipulation;Antitrust Trial on Merits Began 781003 in Usdc for Tx,Dallas Div,W.Tx Utils Co. V Tx Elec Svc Co 1986-05-16 |
Text
__ _ _ __
~
\
f' . _ . '. .-
) << '
UNITED STATES 4 p mafog % ,1
- NUCLEAR REGULATORY COMMISSION d ID IA g
[t E WASHINGTON. D. C. 20555 ipgg; ..kl.2[
%,"~.,/
~ CIPUBLIC DOCU3gWoctober 11, 1978 R003f-
// g$
, .. - - gg]g y ,4
\ l
- k qCTU ,,,e Charles Bechhoefer, Esq. , Chairman Dr. Emmeth A. L kec % y gg 4 **
s sf Atomic Safety and Licensing Board Atomic Safety and 1p sing Boa Panel Panel 4/ 7 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory w . ission
. Washington, D . C . 20555 Washington, D . C. 20555 t
Dr. James C. Lamb , III 313 Woodhaven Road Chapel Hill, North Carolina 27514 f
p' In the Matter of Houston Lighting and Power Company, et al,.
(South Texas Project, Units 1 and 2)
- Docket Nos. 50-498 and 50-499 i
I i Gentlemen:
There are currently pending in this docket requests for hearing and petitions .
- for leave to intervene (Petitions) filed by Mr. Marke and by Citizens Con-11ern'ed About Nuclear Power, Inc. Both the Applicant and the NRC Staff have filed answers opposing the petitions. It has been asumed that the Atomic Safety a and L'icensing Board established to rule on petitions (Board) would call a spe-l cialirehearing confe: ence in the course of its consideration of the petitions.
_ To aid the Board in determining the availability of the various representatives, Counsel for the NRC Staff discussed scheduling by telephone with Counsel for
('
L th'e Applicant, Crunsel for the State of Texas, Mr, Marke, and Counsel for Citizens Concerned Abcut Nuclear Power, Inc. to see if there were any dates which would be mutually agreeable to suggest to the Board.
Representatives of the participants advised Staff Counsel that they would all be available on November 30, 1978, to attend a special prehearing conference if that date is convenient for the Board. (All of the earlier dates which were suggested conflicted with prior commitments of the participants.)
Sincerely ,
($'L[ knCb/K Vicki R. Harding Counsel for NRC Staff ec: See page 2
. ~1 fr/o A3 o 547 G l
. -. 1
~
. 5-
.-. - A
, r
.c 2
i l cc:a Melbert Schwarz, Jr. , Esq.
, t .
a: Robert A. Schulman, Esq.
Mr. David Marke
. Richard W. Lowerre, Esq.
Jack R. Newman, Esq.
Atomic Safety and Licensing
- Board Panel
! Atomic Safety and Licensing
{' Appeal Panel i
Docketing and Service Section t
t 4
}
e-.