Forwards Suppl & Corrected Data to Be Included in Rept on Reactor Containment Bldg Integrated Leak Rate Test
ML20062B111
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 10/16/1978
From: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7810230148
Download: ML20062B111 (4)


Text

.--

R E CE!'fr a l7 [

J B ALTIMORE GAS AND ELECTRIC COMPANY b3.Uso9 74Esl m ALW9m Muray,L ANf; 21203 D.C.

Aamu. c.tu ov m.s.

October 16, 1970 v.u........,

Su ces, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D. C.

20555 l

ATTENTION: Mr. Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors

SUBJECT:

Calvert Cliffs Nuclea.

Plant Unit No.1, Docket

. 50-317

(.._)

Reactor Containment Integrated Leakage Rate Test Report

REFERENCE:

(1) 10 CFR 50, Appendix J (2) Calvert Cliffs Nuclear Power Plant Unit No.1, Docket No. 50-317 Reactor Containment Building Integrated Leakage Rate Test Report, dated July 13, 1978 Gentlemen:

During March 1978, Unit No.1 successfully conducted a periodic reactor containment building integrated leak rate test in accordance withreference(1). The results of this test were forwarded for your

{',

reviewasreference(2). Enclosed is supplementary and corrected data to be included in this report.

r ' >7 Very truly yours.

_ h 3 Lk

~

l e

_ t -_ -

A.E.Lu[dva\\l,Jr.

i Vice President - Supply AEL/MJM/gfc Enclosure gg/03.30I N b

}$

\\

1 s\\

O O

Page 85 i

PENETRATION LEAKAGE SIM4ARY_

PEN. NO.

FUNCTION VALVES LEAKAGE (sccm)

PRE OP 12/5/75 5/1/76 3/24/77 3/30/78 5

15 60 Steam to Reactor Head 130-2, 19-1 0

1 Cleanup Area

~

51 0

61 Refueling Pool Cooling 76Y1, 293-M-1, 293M-1, 0

1 293M-1 3

333H 380 62 Containment Heating MOV-6579 0

22 0

64 Containment Heating 238-1 55 9

67 Equipment Hatch 0

0 5

6 68 Personnel Lock 1680 8430 29591 8175 3699 69 Emergency Escape Lock 0

1058 3699 462 0

Steam Generator 11-1 0

0 28 288 50 64 192 110 Secondary Manways 11-2 0

12-1 0

0 834B 338 41 16 421 59 12-2 0

i TOTAL 3537 28471 142954 61430 35303 s.

.-.-c m

_ - -. - -.. ~.. _

Q Q

Page 85a t

PENETRATION LEAKAGE

SUMMARY

PEN. NO.

FUNCTION LEAKAGE (sccm) l 10/8/74 4/18/75 10/6/76 9/26/77 I

68 Personnel Lock 6749 5887 18.494 1850 K

69 1

Emergency Escape Lock 1050 630 1849 0

  • This table sumarizes the air lock leak tests not covered in the annual penetration leakage sumary.

o L

e b

i

u-

.=

Page 86a FOOTNOTES (Continued) adjusted leakage dropped to the reported valv,, door packing was As found leakage was 59,183 secm. After the I.

e.

The as found leakage when added to the remaining penetration leakage did not exceed the technical specification limit.

J.

During this reporting period a total of 325 personnel lock door seal tests were conducted. The test was performed satisfactorily in all but one case when the door was re-quired to be operable. On 3/24/77 the outer door seal was found leaking at 267 seem exceeding the technical specifi-cation limit by 204 secm. The seal was repaired an retested satisfactqrily.

i K.

During this reporting period a total of 28 emergency escape

(])

lock seal tests were conducted.

In all cases when the door was required to be operable the test was performed satisfactorily.