ML20062A469

From kanterella
Jump to navigation Jump to search
Amend 60 to Facil Oper Lic DPR-57 Revising Tech Specs Re Limiting Conditions for Oper & Surveillance Requirements for Exisiting Fire Protec Sys & Admin Controls of Subj Facil
ML20062A469
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/04/1978
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20062A467 List:
References
NUDOCS 7810140049
Download: ML20062A469 (2)


Text

/  % UNITED STATES

.l' * *4 NUCLEAR REGULATORY COMMISSION j 1* ._j wAsHmGTON. D. C. .M

  • . 8

%...../

GEORGIA POWER COMPANY OGLETHORPE ELECTRIC MEMBERSHIP CORPORATION MUNICIPAL ELECTRIC ASSOCIATION OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-321 EDWIN I. HATCH NUCLEAR PLANT UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 60 License No. DPR-57

1. The Nuclear Regulatory Comission (the Commission) has found that:

A. The facility will operate in conformity with the provisions of the Atomic Energy Act of 1954, as amended, and the rules and regulations of the Comission; B. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; C. The issuance of this amendment will not be f nimical to the common defense and security or to the health and safety of the public; and D. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2. Accordingly, Facility Operating License No. OPR-57 is hereby amended by adding paragraph 2.C(3) to read as follows:

(3) Fire Protection Georgia Power Company shall maintain in effect and fully implement all provisions of the approved fi'e protection plan. The approved fire protection plan consists of the licensee's document entitled, " Evaluation of the Hatch Nuclear Plant Fire Protection Program" which includes:

l 3 N 9749

Original, submitted with letter dated October 1976 Amendment 1, submitted with letter dated September 6,1977 Amendment 2, submitted with letter dated December 13, 1977 Amendment 3, submitted with letter dated February 15, 1978 Amendment 4. submitted with letter dated March 28, 1978 Amendment 5, submitted with letter dated April 11, 1978 Amendment 6, submitted with letter dated April 18, 1978 Amendment 7, submitted with letter dated May 19, 1978 The licensee may proceed with and is required to complete the modifications identified in Table 1 of the NRC's Edwin I. Hatch Safety EvaTuation Report, Fire Protection Review, Unit Nos.1 and 2 dated October 4, 1978. These modifications shall be completed before the end of the third refueling outage. In the event that these modifications cannot be completed by the end of the third refueling outage, the licensee shall submit a report, explaining the circumstances, together with a revised schedule.

Further, Georgia Power Company shall, prior to implementation, provide for Corrmission review and obtain Commission approval of the final design of the modifications which would allow the reactor to be taken to cold shutdown without reliance on the cable spreading room or the control room.

Except for the modifications described in the approved fire protection plan and approved as a result of ComHssion review of the Hatch Nuclear Plant Fire Protection Prograrr rogram), Georgia Power Company is authorized to make changes tott.c Program without prior Commission approval provided that such changes do not result i

in a decrease in the effectiveness of the Program.

3. This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION J

i Thomas A Jippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Date of Issuance: October 4,1978