ML20062A461

From kanterella
Jump to navigation Jump to search
Summary of 820623-24 & 29 Meetings w/C-E & C-E Owners Group Re C-E Emergency Operating Procedure Guidelines Program. C-E Will Provide Overview of Program & Discuss Validation & Implementation of Guidelines at Next Meeting
ML20062A461
Person / Time
Issue date: 07/15/1982
From: Goodman M
Office of Nuclear Reactor Regulation
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 8208030749
Download: ML20062A461 (4)


Text

-.

4 s

DISTRIBUTION DRB NRC PDR PTRB Reading MJGoodman WL I 51982 HBClayton MEM0PANDUM FOR: Dennis L. Ziemann, Chief Procedures and Test Review Branch Division of Human Factors Safety THRU:

0@nalgglPI Claytcn, Acting Section Leader Section A - ProcNures Procedures and Test Review Branch Division of Human Factors Safety FROM:

Michael J. Goodman Section A - Procedures Procedures and Test Review Branch Division of Human Factors Safety

SUBJECT:

SUMMARY

OF MEETINGS WITH COMBUSTION ENGINEERING AND COMBUSTION ENGINEERING OWNERS' GROUP ON EMERGENCY OPERATING PROCEDURE GUIDELINES, JUNE 23, 24 AND 29,1982 i

On March 31, 1982, a meeting was held with Combustion Engineering (C-E) and the C-E Owners' Group to discuss the C-E Emergency Operating Procedure Guidelines Program. Based on the presentation made by C-E, the staff identified several guideline areas requiring additional work. C-E and the C-E Owners' Group agreed to incorporate staff comments into a revised set of draft guidelines (CEN-152, REV 1) which would be provided to the staff for review by May 1, 1982. Some time after the March 31, 1962 meeting, Warren Lyon replaced Jukka Laaksonen as the RSB reviewer for C-E Owners' Group Guidelines. Meetings were scheduled for June 23, 24 and 29,1982, to provide a suitable transition between reviewers, allow the new reviewer to meet other staff reviewers and involved industry personnel, to discuss preliminary staff comments on the revised draft guidelines (CEN-152 REV.1), and to develop a schedule for future submittals and reviews. A list of attendees is enclosed (Enclosure 1).

The preliminary review of the 'progransnatic aspects of CEN-152, REV 1 by the PTRB staff was positive; no significant programmatic problems were found.

The technical review by RSB, however, did identify a number of areas for 4

which clarification or other action by the C-E Owners' Group was necessary.

The majority of these items were resolved at the meetings. Most of the ~

~

remaining "open" items fell irito four categories as follows:

l.

EPG Boundaries a.

Power Level Dependence b.

Entry Uoon Reactor Trio i

i i

emc' >

8208030749 820715 PDR TOPRP EMVC-E C

PDR t

"'I

unc ronu n nomo uacM aa OFFICIAL RECOFiD COPY

-3" 82*

t

~

~

Dennis L. Ziemann.

Wil 151982 2.

E0P Interfaces With Other Procedures a.

Natural Phenomena b.

Electrical Power Sources (e.g., Blackout) c.

RadioactivityReleaseManagement(e.g.,Handlingof Multiple S. G. Tube Ruptures) d.

Containment Integrity (e.g., Flooding, Isolstion, Site Emergency Plan) e.

Tech. Spec. Cooldown Limits f.

Condensate Management (e.g., alternate sources of water) g.

RCP Operation (e.g., Restart Criteria) 3.

Physical Phenomena a.

Hydraulic Instabilities b.

Degraded Core 4.

Design Related a.

PORVs b.

Sensor Locations It was pointed out by C-E that not all open items can be resolved in the final version of the guidelines; some itens (e.g., degraded core) are more appropriately dealt with elsewhere.

Furthermore, scheduling of future submittals and reviews could not be done until the impact of staff coments could be assessed.

In addition to the above items, the staff was concerned that guidance needed for implementation of the draft guidelines was incomplete and that the guidelines were not organized in a way that would facilitate the development of plant specific emergency operating procedures (EOPs).

In this regard, the C-E Owners' Group was requested to provide some mear.s of assuring the staff that acceptable plant specific E0Ps can be developed from the guidelines.

It was sugrjested that a set of selected procedures from a'pflot plant (Calvert Cliffs) might provide adequate assurance.

Furthermore, the staff indicated that before the next meeting it will identify for C-E and the C-E Owners' Group some specific areas in the guidelines where additional implementation guidance would be useful.

It was agreed that another meeting should be scheduled as soon as possible. At the next meeting C-E will provide an overview of their program, and discuss implementation and validation of the guidelines.

In addition, open items will i

or,,cr p wom) om>

xb.

nuc, ow 3," " * " * ' " ' '

OFFICIAL RE'COR COPY c#o

Denn'is L. Ziemar.n '

f JUL 151982 be'discu'ssed as well as those'areakin the guidelines for which additional implementation s. guidance was suggested by the staff.

/

1

. Original signed by ;

s Michael J. Goodman Section K - Procedures Procedureis and Test Review Branch Division of Hdman Factors Safety

Enclosure:

List of Attendees f

cc w/ enclosure:

H. Denton E. Case H. Thompson W. Burchill, C E J. Barrow C-E Owners' Group W. Lyon r

t

(

g

?

\\

t Omcep DHFS PT B D! IFS:PTR j.

.............. 4 eunnary M

ra%JiBClayto

....f../. 82 7/13/82 y

s, ;

7 er.n >

P.RC FORed 318 410 80) NRCM O240 OFFICIAL RECORD COPY

- m an e24 c

. i.

7

~.

s s,

,7, -

~

,\\

~

f I

.e

[

rf g"'

s x

/

.x

i a.

0,'

s

/ /

3,-

/

s, ENCLOSURE 1

)

</

]

H

' / LIST DE ATTEtt0EET y

(-

q

._'i

-(.

JUNE 23 AND 24, 1962:

e,, e,. ' l.. ' s

'. JUNE 29, 1982:'

/

/.

'.1,

~s

/.'C. ~NRC

~

W

{

',I

  • ~

NPC i

,,,.t

> -i!

' M. Goodman

~

M. Goodnan

/

D.tZiemann jf' f'

W. Lyon

/I '

~'

,,7 [ ]s j

u. Kennedy

._ [

W. Lyon g

$. Bryan J. Laakscnen a

j W.'Middleton J. Sezetis W. Kenhed9 B. Clayton D. Ziemann s,",s B. Clayton g

R. Urban,

s i

c:

S. MacKay

? C-2... -

//

R. Schemel

/

S. Bryan 9 G. Bischoff i.

,, j

'[ R. Pearce-s C-E q,*

W. Burchill W. Burchill C-E Owners' Group

^'

G. Bischoff i

R. Pearce G. Pavis J. Barrow C-E Owners' Group Other V. Callaghan J. Darrow L. Connor, Doc-Search Associates -

J. Bowlby "NRC Calendar" !

D. Crouch G. Peelen a

t G. Pavis f

o nce) suoucur)

DoTEk

  • - ise s 29824 NRC FORM 318 (10,80l NRCM O240 OFFICIAL RECORD COPY