Discusses Employee Dismissal Re Firewatches Conducted That May Not Have Been Performed Per Tech Spec Requirements. Discrepancies Identified Between Firewatch Log Entries & Security Data Mgt Sys Histories
ML20062A038
Person / Time
Site: Davis Besse 
Issue date: 10/05/1990
From: Shelton D
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1857, NUDOCS 9010190005
Download: ML20062A038 (2)


Text

,t. W S.#.-

~ '

~

~

.m m

LI i

g ;; /,. c,'i

.. w

i

,,y i

Donehl C. Shenon 300 Madman Avenue

'f I

Vce President Nuclear

Toiedo, OH 436520001

- Davis Besse (419)249 2300 -

u.

=

Docket l Number 50-346.-

Licrbse Number NPF-3 i

~ Serial Number 1857 1

y

<0ctober 5, 1990.

yx

. United States Nuclear Regulatory Commission 0

Document Control Desk ~

y Vashington, D. C.. 20555-y Subj ect: _ Employee' Dismissal Jf

&9s

'Gedtlement L

On August l16, 1990,J Davis.Besse personnel,.While evaluating
overtime for-4 4

W,.

firevatch' personnel discovered that'several' roving. continuous firevatches.

1

i';condueted on August'14 and 15, 1990 may not have been performed;at the' frequency.

m,

E

' required by Technical Specification 3.7.10. ~This concern was based on 4

' ' discrepancies found between Security Data Management System;(SDMS)L records of W4 keycard. time entries into firevatch areas-and the times recorded inithe' Roving, L

' Continuous lFirevatch Logs 7for patrol of firevatch' areas.;!Due to indications.

'f ithatlfirevatch records:may have'been falsified, plant management; initiated a-a ^

securityfinvestigation7to'determineivhether the records. vere in fact ~ falsified' lj
and,-'if'so,3 o'de.termine'the extent of the' problem.-

t t

.1 p

-r' Concurrent vithi he initiation of the security = investigation,Lprompt.' actions 1

f,

. vere,taken to. ensure.that'firevatches were:being performed as required by'.

4 w,

'.TechnicaliSpecification 347.10 and. applicable plant procedures.

These ' ac.tions -

Ef

included:' 1)1 ensuring that personnel coming on shift:to: perform firevatches were y

~

. thoroughly trained?on. requirements Involving firevatches:and properL N

documentation,;2) varforming a. daily! review of security
card access. history!to g

(confirm complianceJtoJthe:firevatch. procedure, and, 3) verifying firevatches!by[

jw

. requiring firevatch! personnel,to shovLthe.firevatch log to-the shiftisupervisor' f

Dorfshif t manager at - the end? of: each. hour. -

.y W 'y % Jevalitated the SDMS histories of 'firevatch employees against the Rovin

%(

Q 7 Continuous Firevatch. Logs'for the period;from July 24, 1990 to. August.16, 1990.

1 Gg

The! investigation identified discrepancies between the firevatch^ 1og entries and LSDMS-histories. These discrepancies were limited to-the firevatch reporting a

1 b

M recordsLof-twoLindividuals=during the period August 13 through August 16, 1990 WW

between 2300
hours and 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> (th4 ti shift).

n;

]

n, 5

o -

Mf opemteg componiest 9010190005 901005 P

g M JM e cimeland Electnc muminctng PDR ADOCK 05000346 M pj WBapg!k_ w Jtoledo Edison 1 p

PNV

'g-

/

wMf Ja As.

.g Do,c,kst Nu ber 50-346 c *: ~ Lic:nsa Nunber NPF-3=

Serial Number 1857 i

Page 2-

=Intervievs' vere then conducted with these individuals.

Based on1the evidence i

obtained, including the discrepancies and the personnel intervievs' conducted,.

Toledo Edison.has concluded that some firevatch log entries were falsified by two individuals..As a result, consistent with company policy,' the employees

. involved vere discharged.: Based on the security investigation results and the-subsequent personnel interviews, Toledo Edison has confidence _that this ' concern vas limited =to the two employees and not indicative of a generic problem in the firevatch program.

The subject firevatches vere established on July 24, 1990 as a conservative entry into the action statements of Technical Specification 3.7.10.

Subsequently, Toledo Edison developed and submitted and the NRC concurred with an interpretation _(Serial Number 1841) concluding that the continuous fire vatches implemented were in excess of actual Technical Specification requirements. Therefore, the firevatches missed as a result of this incidence are not reportable as a Licensee Event Report. However, due.to the potential significance of employee misconduct, Toledo Edison decided a voluntary report should be submitted.

3 Toledo Edison believes that the failure to perform roving continuous firevatches vithin the 15 minute time. period required by.the firevatch procedure was due to

' misconduct by two employees.

Toledo Edison's investigation provided reasonable o

assuranceLthat there were no generic problems with the firevatch program..

Missed ~firevatches by contract employees were previously reported by Toledo.

Edison'in LER 87-005, however, the cause was attributed to firevatch program deficiencies.

Corrective actions implemented for these deficiencies vould not be expected to' preclude the isolated incidences of unauthorized employee conduct described above. 'It'is believed'that the corrective action taken for the.

-i current incident.(i.e., discharge of employees) vill be effective in preventing.

potential' future occurrences.

H

Should there be any questions concerning this utter, please contact Mr. R. V. Schrauder, Manager - Nuclear Licensing, at (419) 249-2366.

y Sincerel,

4

(

s.

BS/mnb

}

cci P. H. Byron, DB-1 NRC Senior Resident Inspector A'. B.. Davis, Regional Administrator, NRC Region III H. D.. Lynch, DB-1 NRC Senior Project Manager Utility Radiological Safety Board t