Confirms 900921 Telcon for Technical Meeting in Region IV Ofc on 901022 to Discuss Results of Task Team
ML20059P035
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/05/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 9010250019
Download: ML20059P035 (4)


Text

k;f,.

4 y 5 gggn

- 1tl

,4 IIn' Reply Refer To:

= Dockets: 50-445-50-446 vTU Electric ATTN:

W. J. Cahill, Jr., Executive

['

Vice President, Nuclear.

~Skywa'y Tower

!o

'400 North Olive Street, L.B. 81

. Dallas, Texas 75201

? Gentlemen:

This,1s.to confirm arrangements made between Mr. A. T. Howell of NRC Region IV and Mr. W. Guldemond of your staff during a telephone conversation on September 21, 1990, for a technical meeting in the Region IV office on October 22, 1990, at 1 p.m.

The purpose' of the meeting is to discuss the results of-the task team that you formed to investigate secondary plant reliability problems. We-understand

.that this: task team was formed on September 19, 1990, in response to several' plant: trips -that have recently occurred.

Should 90u have any questions concerning these arrangements, we will be pleased to discuss them with you.

Sincerely,-

Original digned ny 0 % h t 0. C h m ber k:n Samuel 0. Collins, Director.

Division of Reactor, Projects

Enclosure:

Proposed Agenda e

cc:

TV Electric ATTN:

Roger D. Walker, Manager, Nuclear Licensing s

. Skyway Tower-400 North'011ve Street, L.B. 81 Dallas,zTexaso 75201 N

thh RP,Ih DD: DRPH RIV:DRP/a i C:

B D:DRP

.ATHowell[O DDChamberlain TPGwynn SJCollins 10/4[/90 10/f/90 10/f/90 10/f/90 13e d,

o n, n >../, M c " 4 L m

's\\

PD$'~ADOCK 05000445 p

PDC

r

,li

[Q;

.+

f

,)

j i

y (t z H TU Electric w.

Y;.

~

Juanita Ell'is' 4'

President - CASE' L1426 South Polk Street

-Dallas,_ Texas 75224-x

. GDS Associates, Inc.-

-Suite-720 1850 Parkway Place Marietta, Georgia 30067-8237

. Billie Pirner Garde, Esq.

Robinson, Robinson. et. al.

103-East-College Avenue

-Appleton, Wisconsin 54911 TV Electrict Bethesda Licensing _

j 3 Metro _ Center _ Suite-610

. - Bethesda, Maryland-20814 -

g Heron, Burchette, Ruckerts & Rot.hwell ATTN:~ William A..Burchette,'Esq.

' Counsel for Tex-La Electric Cooperatiye ofl Texas-1025 Thomas Jefferson St., N.-W.

Washington,'D.C. 20007 E.IF. Ottney~

-P.O.1 Box 1777!

Glen Rose,: Texas 76043

^

Newman & Holt:inger, P.C.

ATTN:

Jack R. Newman, Esq.

1615,L. Street, N.W.

Suite 1000

Washington,,D.C. ~20036 Texas Department of Labor &' Standards

. ATTN:..G. R. Bynog, Program Manager /

Chief Inspector Boiler Division P.O. Box 12157,-Capitol-Station Austin, Texas 78711 y

s.

Honorable George Crump County Judge i

Glen Rose, Texas 76043 l

l Texas Radiation Control Program Director 1100 West.49th Street-Austin,'_ Texas.78756 l

l

L t
.
c ;;, e L

. t :.

- 1 l

.,.U. Electric- :T bec to DMB (IE45).

bec distrib. by RIV:.

  • ResidentInspector(2)
  • R. D.. Martin-n

-*DRP

  • DRS
  • SectionChief(DRP/B).
  • ProjectEngineer(DRP/B)
  • DRSS-FRPS Lisa Shea, RM/ALF J
  • MIS-System

. *RSTS_ Operator

  • RIV Files
  • w/766 C

1)

A

-; g y r

i l.

!: ;7 l'

7^

4

~

y, $i, c-P

-i

', e s,-

+

PR POSED AGENDA

-TU Electric Meeting with NRC October 22; 1990, at 1 p.m.

j f'

1.

' INTRODUCTION.AND-PURPOSE OF MEETING Pat Gwynn, Deputy Director.

Division of Reactor Projects II.

LICENSEE OPENING REMARKS William Cahill, Executive

'Vice President, Nuclear III.-LICENSEE PRESENTAIION TV Electric Representative 4

1.

-Secondary Plant. Problems

- l 1.1 Background of Events

- c 2.

Task Team on Secondary Plant Reliability 2.1 Purpose-and Scopei

- 1

{

2.2 Results 2.2.1-Issues Affecting the Reliability of the Secondary Plant i

2.2.2 Recomended and/or' Approved Interim Actions to Enhance l-Reliability of the Secondary' Plant 3

2.2.3 Proposed Long-Term Corrective Actions l

s 2.2.4 Other Issues Affecting-Reliability l

IV.

LICENSE CLOSING REMARKS William Cahill, Executive Vice President, Nuclear i

V.

NRC CLOSING REMARKS-Pat Gwynn, Deputy Director, Division of Reactor Projects y

i i