ML20059P035

From kanterella
Jump to navigation Jump to search
Confirms 900921 Telcon for Technical Meeting in Region IV Ofc on 901022 to Discuss Results of Task Team
ML20059P035
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/05/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 9010250019
Download: ML20059P035 (4)


Text

k;f,. , ,

.. , 4 y 5 gggn

- 1tl

,4 IIn' Reply Refer To:

= Dockets: 50-445-50-446 vTU Electric ATTN: W. J. Cahill, Jr. , Executive

[' Vice President, Nuclear.

!o '

~Skywa'y Tower

'400 North Olive Street, L.B. 81 *

. Dallas, Texas 75201

? Gentlemen:

This,1s.to confirm arrangements made between Mr. A. T. Howell of NRC Region IV and Mr. W. Guldemond of your staff during a telephone conversation on September 21, 1990, for a technical meeting in the Region IV office on October 22, 1990, at 1 p.m.

The purpose' of the meeting is to discuss the results of- the task team that you formed to investigate secondary plant reliability problems. We-understand

.that this: task team was formed on September 19, 1990, in response to several' plant: trips -that have recently occurred.

Should 90u have any questions concerning these arrangements, we will be pleased to discuss them with you.

Sincerely,-

Original digned ny 0 % h t 0. C h m ber k:n Samuel 0. Collins, Director .

Division of Reactor, Projects

Enclosure:

Proposed Agenda e

cc:

TV Electric ATTN: Roger D. Walker, Manager, Nuclear Licensing s

. Skyway Tower-400 North'011ve Street, L.B. 81 Dallas,zTexaso 75201

@ N thh RIV:DRP/a i C: RP,Ih B DD: DRPH D:DRP

.ATHowell[O DDChamberlain TPGwynn SJCollins 10/4[/90 10/f/90 10/f/90 10/f/90 13e d, o n , n >../, M c " 4 L m 's\

PD$'~ADOCK 05000445

p PDC

r - , ..

, ,li

[Q; '

.+ '

f

,) '

j y (t z i H TU Electric w.

  • Y; .

~

Juanita Ell'is' .

4' President - CASE' L1426 South Polk Street  !

.- -Dallas,_ Texas 75224-x . GDS Associates, Inc.-

-Suite-720 1850 Parkway Place .

Marietta, Georgia 30067-8237

. Billie Pirner Garde, Esq.  ;

Robinson, Robinson. et. al.

103-East-College Avenue

-Appleton, Wisconsin 54911 TV Electrict Bethesda Licensing _ _

j 3 Metro _ Center _ Suite-610 ,

. - Bethesda , Maryland- 20814 - g Heron, Burchette, Ruckerts & Rot.hwell .

ATTN:~ William A..Burchette,'Esq.

' Counsel for Tex-La Electric Cooperatiye ofl Texas-1025 Thomas Jefferson St., N.-W.

Washington,'D.C. 20007 E.IF. Ottney~

-P.O.1 Box 1777!

^ Glen Rose,: Texas 76043 Newman & Holt:inger, P.C.

ATTN: Jack R. Newman, Esq.

1615,L. Street, N.W.

Suite 1000

Washington,,D.C. ~20036 Texas Department of Labor &' Standards

. ATTN: . .G. R. Bynog, Program Manager /

Chief Inspector Boiler Division P.O. Box 12157,-Capitol-Station

s . Honorable George Crump County Judge i Glen Rose, Texas 76043 l

l Texas Radiation Control Program Director 1100 West.49th Street-Austin,'_ Texas .78756 l l

l ;L

l t
.
c ;; , e L

. t :. -1 l

.,.U.:T Electric- '

bec to DMB (IE45).

bec distrib. by RIV: .

  • R. D.. Martin- n *ResidentInspector(2) ,

-*DRP . *DRS

  • SectionChief(DRP/B). *ProjectEngineer(DRP/B)

, *DRSS-FRPS Lisa Shea, RM/ALF J

  • MIS-System . *RSTS_ Operator
  • RIV Files
  • w/766 ,

C A

1)

-; g y r

i l.

!: ;7 l'

7^ 4~

y, $i , c- , , ,:

P '

> -i

', e s,- +

., PR POSED AGENDA

-TU Electric Meeting with NRC f'

October 22; 1990, at 1 p.m. j

1. ' INTRODUCTION.AND-PURPOSE OF MEETING Pat Gwynn, Deputy Director. '

Division of Reactor Projects II. LICENSEE OPENING REMARKS William Cahill, Executive

'Vice President, Nuclear III.-LICENSEE PRESENTAIION TV Electric Representative

- 4

-l

1. -Secondary Plant. Problems '

1.1 Background of Events

-c 2. Task Team on Secondary Plant Reliability 2.1 Purpose-and Scopei .

1 2.2 Results

{

2.2.1- Issues Affecting the Reliability of the Secondary Plant i

2.2.2 Recomended and/or' Approved Interim Actions to Enhance Reliability of the Secondary' Plant l-3 2.2.3 Proposed Long-Term Corrective Actions l s  ;

2.2.4 Other Issues Affecting-Reliability l IV. LICENSE CLOSING REMARKS William Cahill, Executive Vice President, Nuclear i

V. NRC CLOSING REMARKS- Pat Gwynn, Deputy Director, ,

Division of Reactor Projects y i

i 1

, 'l