Text
?
i l
'NedH mpshiro Yankee t
e NYN 90185 October 12, 1990 United States Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Document Control Desk
References:
Facility Operating License No NPF 86, Docket No. 50 443
Subject:
Monthly Operating Report Gentlemen:
Enclosed please find Monthly Operating Report 90 09.
This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month _ of September,1990 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Very truly yours, g
g h c-Ted C. Fei enbaum B
President and Chief Executive Officer Enclosure TCF/WJT: tad cc:
Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region 1 l
475 Allendale Road l
King of Prussia, PA 19406 i
Mr. Noel Dudley NRC Senior Resident inspector P.O. Box ' 1149 Seabrook, NH 03874 9010240118 900930 PDR ADOCK 05000443
/
PDC R
New Hampshire Yonkee Division of Public Service Company of New Hampshire
/ g\\
P.O. Box 300
- Seabroc,k, NH 03874
- Telephone (603) 474 9521
\\
1 i
?
OPERATING DATA REPORT I
[
DOCKET NO.
50-443 UNIT Seabrook 1 DATE 10/12/90 1
COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)
OPERATING STATUS 1.
Unit Name:
Seabrook Station Unit 1 2.
Reporting Period:
SEPTEMBER 1990 3.
LicensedThermalPower(MWt):
3411 4.
NameplateRating-(GrossMWe):
1197 5.
DesignElectricalRating(NetMWe):
1148 1
6.
MaximumDependableCapacity(GrossMWe):
1200 MaximumDependableCapacity(NetMWe)(: ItemsNumber3Through7) 1150 7.
If Changes Occur in Capacity Ratings 8.
Since Last Report, Give Reasons:
Not ADDlicable l-9.
Power Level To Which Restricted, If Any:
None
- 10. Reasons For Restr'ictions, If Any:
Not ADDliCable This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720.0 6551.0 34680.0
- 12. Number Of Hours Reactor Was Critical 720.0 3664.0 _
3858.4
- 13. Reactor Reserve Shutdown Hours 0.0 918.8 918.8
- 14. Hours Generator On-Line 720.0 2358.6 2358.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2316184 6685110 6686201 _
- 17. Gross Elec. Energy Generated (MWH) 811777 2209207 2209207 18.NetElectricalEnergyGenerated(MWH)-
781243 2109483
__L109483
- 19. Unit Service Factor
-100.0 97.2 97.2
- 20.-Unit. Availability Factor 100.0 97.2 97.2
[
- 21.UnitCapacityFactor(UsingMDCNet) 94.4 91.6 91.6 l
- 22.. Unit Capacity Factor (Using DER Net) 94.5 91.8 91.8 i
- 23. Unit Forced Outage Rate 0.0-2.8 2.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None Scheduled l
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
Not ADolicable
- NOTE: Values based on accumulated hours starting 08/19/90, date Regular Full l-Power Operation began.
1 of 5 l
[U j.
- g. '
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-443 t
UNIT Seabrook 1 r
DATE 10/12/90 COMPLETED BY P. Nardone i
TELEPHONE (603) 474-9521 (Ext. 4074)
MONTH SEPTEMBER. 1990
[
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1151 16 1153 2
1154 17 1151
?
3 1140 18 1152 4
1146 19 908' 5
1149 20 372 6
1150 21 1028 7
1152 22 1072 8
1101 23 1023
{
9 1148 24 1060 10 1150 25 1069 11 1149 26 1072 12 1150 27 1074 13 1151 28 1074
[
14 1152 29 1079 15' 1146 30 1078 INSTRUCTIONS On this format, list the~ average daily unit power level in MWe-Net for each day in the
. reporting month. Compute to the nearest whole megawatt.
2 of 5 1
INIT SHUID00GGS AIO POWER REDUCTIGES DOCl T NO.
50-443 INIT Seabrook 1 DRTE 10/12/90 REP N r M NIH SEPrD!BER, 1990 CCEPIEIED BY P. Nard m e
'ITIEPIDGE (603) 474-9521 (Ext. 4074)
No.
Date Type Duration Reason 2 Method of Licensee Cause & Corra:tive l
(Hours)
Shutting Event Action to Down Reactor 3 Report #
Prevent Rectuunce Page 1 of 1 90-25 09/08/90 F
0 A
5 N/A Power reduced to 80% RrP. Circulating water ptmp 39C reoved fra service to investigate low lube water flow problem.
Power suburM to 100% RTP following restart of ptsp.
90-26 09/19/90 F
0 F/A 5
N/A Steemt generator chemistry out of speci ~
(
fication (Action Ievel II) required power reduction to 30% RTP. Power returned to 90% KrP following chenistry cleanup. Power being maintained at 93%
RTP following zumnal of circulating water ptmp 398 frm service for repair.
I 2
3 F: Forced Reason:
Method:
S: Scheduled A-Equipnent Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continual frm E-Operator Training & Limnse Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain)
(Dtuation = 0)
H-Other (Explain) 9-Other (Explain) 3 of 5
. ~.
1 e
2 z
sr.
i sen n u6 5
)
g okg 9
4 lai 1
s 7
gms s
a 0
4 0
a e
9 7
4 f
1 W
3
/
i 4
zp nbd 4
qho 2
n i
e 4
P wtrc t
r t
1 a
)
/
M 3
x i
oaen 0
0 0
E lo.
l pe 5
1 6
(
ot lg r
o e
onse P
f csr filf E
N ru rae T
E Y
N O
let einR B
O I
et a zWi O
I I
N M
R H
T ph e i
m na D
P C
ae g
r I
I r.a d T
Y E
A ette I
I ns u
E E
E rg eegc 0
I T
C ent tn 0
P N
ti D
M A
ese o
o u eur trr I
G D
hau eww I
cs dw N
p o
eon I
adl l po s A
vec.
i n.
aedo M
pl n w ftei1 ie idt2 a
lfh^
nsna-u g
u r fan 0 T
ria e fli9 N
hoh t o
- m. R a
s E
t n
HowhI M
uona ef a I
P CmoE IU QB D
ETA IER 0
m9 91 r
A 5
p A
S R
u p
f E
T ro ru o
R B
N er eo K
N E
zG zr 4
T N
i iG u pm r
I rl
=
Y P
K uv R
E M
s k a sua skt A
S s
t M
G e ia ece E
rue rae PCH PBH LS H
I E
N C
0 N
7 E
T D
R TN K
I E
A R
M M
E rt "Wt T
on n
E S
t a a
Y cl
- l d
S ao mo r
eo E o J
RC RC n
w u
1 0
0 f
9 9
o E
/
/
T 8
2 1
A 0
1 D
/
/
e 9
9 g
0 0
aP
DOCKET 1(h 50-443 tNIT Seabrook 1
+..
DATE 10/12/90 C N PLETED BY P. Nardone TELEP)KNE (603) 474-9521 (Ext. 4074)
RDTELIE INNRMATIN R100EST
- 1. Name of facility: Seabrook linit 1 i
- 2. Scheduled date for next refueling shutdown:
07/27/91 4
- 3. Scheduled date for restart following refueling:
10/01/91
)
I
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license i===&ent?
Ilnknown at this time, i
- 5. Scheduled date(s) for subnitting licensing action and supporting Informaticn:
lbt Applicable
- 6. Inportant licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or perfonnance _ analysis methods, significant changes in fuel design, new operating g.vcadures:
-i None
- 7. We number of fuel assmblies (a) in the core and (b) in the spent fuel storage pools (a) In Core:
193 (b) 0
- 8. We present licensed spent fuel pool storage capacity and the size of 3
any increase in licensed storage capacity that has been requested or is planned, in number of fuel assa blies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned, i
- 9. % e projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assablies based on sixteen refuelings and full core offload capability.
W e current licensed capacity is adequate until at least the year 2010.
5 of 5