Monthly Operating Rept for Sept 1990 for Seabrook Unit 1.W/
ML20059N933
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/30/1990
From: Feigenbaum T, Nardone P
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-90185, NUDOCS 9010240118
Download: ML20059N933 (6)


Text

? i l 'NedH mpshiro Yankee ,

t e

NYN 90185 October 12, 1990 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

References:

Facility Operating License No NPF 86, Docket No. 50 443  ;

Subject:

Monthly Operating Report Gentlemen:

Enclosed please find Monthly Operating Report 90 09. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month _ of September,1990 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Very truly yours, g g h c- #

Ted C. Fei Benbaum President and Chief Executive Officer Enclosure TCF/WJT: tad ,

cc: Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission Region 1 l 475 Allendale Road l King of Prussia, PA 19406 i'

Mr. Noel Dudley NRC Senior Resident inspector P.O. Box ' 1149 Seabrook, NH 03874 9010240118 900930 PDR ADOCK 05000443 /

R PDC New Hampshire Yonkee Division of Public Service Company of New Hampshire / g\

P.O. Box 300

  • Seabroc,k, NH 03874
  • Telephone (603) 474 9521 \

1 i

?

OPERATING DATA REPORT I

[ ,'

DOCKET NO. 50-443 UNIT Seabrook 1 l DATE 10/12/90 1 COMPLETED BY P. Nardone I TELEPHONE (603) 474-9521 l (Ext. 4074)

OPERATING STATUS

1. Unit Name: Seabrook Station Unit 1
2. Reporting Period: SEPTEMBER 1990
3. LicensedThermalPower(MWt): 3411
4. NameplateRating-(GrossMWe): 1197
5. DesignElectricalRating(NetMWe): 1148 1
6. MaximumDependableCapacity(GrossMWe): 1200 '
7. 1150
8. MaximumDependableCapacity(NetMWe)(:

If Changes Occur in Capacity Ratings ItemsNumber3Through7)

Since Last Report, Give Reasons: Not ADDlicable l- Power Level To Which Restricted, If Any:

9. None
10. Reasons For Restr'ictions, If Any: Not ADDliCable This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720.0 6551.0 34680.0
12. Number Of Hours Reactor Was Critical 720.0 3664.0 _ 3858.4
13. Reactor Reserve Shutdown Hours 0.0 918.8 918.8
14. Hours Generator On-Line 720.0 2358.6 2358.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 2316184 6685110 6686201 _
17. Gross Elec. Energy Generated (MWH) 811777 2209207 2209207 18.NetElectricalEnergyGenerated(MWH)- 781243 2109483 __L109483
  • 19. Unit Service Factor -100.0 97.2 97.2 ,
  • 20.-Unit. Availability Factor 100.0 97.2 97.2 [

l

  • 21.UnitCapacityFactor(UsingMDCNet) 94.4 91.6 91.6 i *22.. Unit Capacity Factor (Using DER Net) 94.5 91.8 91.8
  • 23. Unit Forced Outage Rate 0.0- 2.8 2.8
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None Scheduled l 25. If Shut Down At End Of Report Period, Estimated Date Of Startup: Not ADolicable

  • NOTE: Values based on accumulated hours starting 08/19/90, date Regular Full l- Power Operation began.

1 of 5 l

[U

j. ,

' g. ' - AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-443 t UNIT Seabrook 1 r DATE 10/12/90 .

COMPLETED BY P. Nardone i TELEPHONE (603) 474-9521

, (Ext. 4074)

MONTH SEPTEMBER. 1990 [

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) ,

1 1151 16 1153 2 1154 17 1151 ,

?

3 1140 18 1152 4 1146 19 908' 5 1149 20 372 6 1150 21 1028 7 1152 22 1072 8 1101 23 1023 {.

9 ,_.

1148 24 1060 <

10 1150 ,_

25 1069 11 1149 26 1072

! 12 1150 27 1074 .,

13 1151 28 1074

[ 14 1152 29 1079 ,

15' 1146 30 1078 INSTRUCTIONS On this format, list the~ average daily unit power level in MWe-Net for each day in the

. reporting month. Compute to the nearest whole megawatt.

2 of 5 1

INIT SHUID00GGS AIO POWER REDUCTIGES DOCl T NO. 50-443 -

INIT Seabrook 1 DRTE 10/12/90 .

REP N r M NIH SEPrD!BER, 1990 CCEPIEIED BY P. Nard m e *.

'ITIEPIDGE (603) 474-9521 (Ext. 4074)

No. Date Type l Duration Reason 2 Method of Licensee Cause & Corra:tive (Hours) Shutting Event Action to Down Reactor 3 Report # Prevent Rectuunce Page 1 of 1 90-25 09/08/90 F 0 A 5 N/A Power reduced to 80% RrP. Circulating water ptmp 39C reoved fra service to investigate low lube water flow problem.

Power suburM to 100% RTP following restart of ptsp.

(

90-26 09/19/90 F 0 F/A 5 N/A Steemt generator chemistry out of speci ~

fication (Action Ievel II) required power reduction to 30% RTP. Power returned to 90% KrP following chenistry cleanup. Power being maintained at 93%

RTP following zumnal of circulating water ptmp 398 frm service for repair.

I 2 3 F: Forced Reason: Method:

S: Scheduled A-Equipnent Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continual frm E-Operator Training & Limnse Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain) (Dtuation = 0)

H-Other (Explain) 9-Other (Explain) 3 of 5

. ~ . _ .-

1 2

5 9

)

4 i

e z

g sr.

sen okg n

3 4

1

/

0 9

s i

s a 4 7

4

- 7 0

4 f a u6 zp 1 lai gmse nbd 4 2 n a t

. qho P i

wtrc e

W

- 1 ) r 0 / M 3 E

x i t

oaen pe 5 0 1 .

0 6 ( lo.

ot e

l lg onse r

P f o csr filf E N ru rae O

T I

E I

Y B

N O

O I

let et a einR zWi N M R H T C

na ae i

g m r

I I D P r .a d T Y I I E

E A

E ph rg e ette u ns 0

0 E

I P

T C N

ent ti eegctn D M A I ese eur o trr o u G D hau dw eww I

N p cso eon adl l po s vec.

I A i n.

M plie n aedo ftei1 a w idt2 nsna-lfh^ g r fan 0 u u T ria e fli9 N

E hoh t n t o a s m. R M

P uona CmoE HowhI ef a I I

U Q

B D

E T

A I

E R

0 A

m9 r

9 1

, p A 5 S R u p f E

B T

N ro er ru eo o

R N E zG zr 4 K T N i iG r

Y I

P K rl uv

= u pm R

A E

S M ss k a t sua skt M G e ia rue ece rae E

L PCH PBH S H I

E C

N N 0 7

E T D

T R N K I E A R M M E rt E

T S

on t a "Wt n a

Y cl ;l dr S ao eo mo E o J

n RC RC w

u 1

0 0 f 9 9 o E / /

T 8 2 1 A 0 1 D / /

e g

9 9 0

0 a

P

DOCKET 1(h 50-443

+..

- tNIT Seabrook 1

  • DATE 10/12/90

- C N PLETED BY P. Nardone TELEP)KNE (603) 474-9521 (Ext. 4074)

RDTELIE INNRMATIN R100EST

1. Name of facility: Seabrook linit 1 i
2. Scheduled date for next refueling shutdown: 07/27/91 l 4
3. Scheduled date for restart following refueling: 10/01/91 )

I

4. Will refueling or resumption of operation thereafter require a technical specification change or other license i===&ent?  !

Ilnknown at this time, i

5. Scheduled date(s) for subnitting licensing action and supporting l Informaticn: I lbt Applicable
6. Inportant licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or '

perfonnance _ analysis methods, significant changes in fuel design, new operating g.vcadures: -i None

7. We number of fuel assmblies (a) in the core and (b) in the spent fuel storage pools (a) In Core: 193 (b) 0
8. We present licensed spent fuel pool storage capacity and the size of 3 any increase in licensed storage capacity that has been requested or ,

is planned, in number of fuel assa blies:

Present licensed capacity: 1236 .

No increase in storage capacity requested or planned, i

9. % e projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Licensed capacity of 1236 fuel assablies based on sixteen refuelings and full core offload capability.

W e current licensed capacity is adequate until at least the year 2010.