Monthly Operating Rept for Sept 1990 for Jm Farley Nuclear Plant Unit 2
ML20059N469
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/30/1990
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NA-90-5541, NUDOCS 9010160020
Download: ML20059N469 (5)


Text

.- _ ._

l V . .

Alabama Power Company

.. 40 inwness Center Parkway

~.. . Post Offee Box 1295 l- Bamingham, Alabama 35201 1

l Telephone 205 868 5581 '

i

! W. G. Haireton, lli I

Senior Vce President Nuclear Operations gggggp October 12, 1990 NA-90-5541 ine scunem smer,csyson '

L I

r Docket No. 50-364 f i

U. S. Nuclear. Regulatory, Commission i ATTN: Document Control Desk Vashington, D. C. 20555 j

Joseph M. Parley Nuclear. Plant i Unit 2 .i Monthly Operating Data Report Attached is the September 1990 Monthly Operating Report for Joseph M.:  ;

Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the '

Technical Specifications.- _j If you have any questions, please advise.

l

' Respectfully submitted, f

.. -j k.a ton,III-JAR:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman j Mr. G. F. Maxwell i

i a

  • i 01 hk h,o 4 i  !

a .

g j

,kg

+ .

,  % - j --

c- .

9: , r i

s *. 1

, e, Lt JOSElH M. FARIAT NUCLEAR PLANT , .

UNIT 2 ,

NARRATIVE SikNARY OF. OPERATIONS .

Septesdaer, ' 1990 - i a

. .. , i There were no unit shutdowns. or significant, power reductions durirut the amonthi.

of Septemter. . 4 The following major safety-related mainternance uns perforned in the morith' ofc l Septender:  ; -l 1

t

. .i- .;

1. Miscellaneous corrective and preventive maintenance was performed on '

i the diesel generators. c, . + ,

.2. 2B service water pump motor oil: cooler wan' replaced'.,

,I

3. Miscellaneous safety related 4160V. breaker preventative maintenance tasks! '

L.

were perfornurl. ';

s t

...J t $

i

, i!

I s 1 g

i I

I

+

4 a- .

i y >

h ' l .

r n[

f I

i ,:

..t

'r s

'{

r .e

'I d

s y -

3--. 3 .,,

hI Lj{

-\ ,

s ._+

. f^ :_f (

o)

..; . i -1h

--'i.,'. , .5 lIo ei k; *

7, 3 s

'{

! s a

- k ,. [

/[

t Il l.' , 9 f .y h~ , , 1

, . - . * , # . ' 4 . . -  ;. - . , , o m, 5 i . , , *

. ',,
  • 4 j

.. CPERATING m'In REFW!T l l

DOCKET No. 50-364 Dh5E October 5, 1990 Om BY D. N. Morey

'IEIARKBE (205)899-5156 -

OPERATIIC 8'Ik'IUS '

hotos .

1. Unit Name: Joseph M. rarley - Unit 2 1) Cunulative data since

, 2. Reporting Period: September 1990 7-30-81, date of

3. Licensed '!hermal Power (79ft): 2,652 commercial operation. .
4. Nameplate Rating (Gross MWe): 860 i
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MNe): 868.6 l
7. Maximum Dependable Capacity (Not MNe): 828.2 J
8. If Changes Occur in Capacity Ratings (Items Number 3 '!hrough 7) Since Last Report, Give Reasons: N/A i
9. Power Level To Which Restricted, If Any (Net MWe): N/A ~
10. Reasons For Restrictions, If Any: N/A l

-}

i

'this Month Yr-to-Date Oumlative

11. Hours In Reporting Period 720 6,551 80,400 i
12. Number Of Hours Reactor Was Critical 720.0 6,207.4 70,090.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 720.0 6,190.8 69,262.8
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross '!hermal Energy Generated . (MNH) 1,907,101 16,192,382 176,448,649 ,
17. Gross Electrical Energy Generated (MNH) 619,754 5,294,440 57,960,982  ;
18. Net Electrical Energy Generated (799H) 590,350 5,034,344 54,977,734 +
19. Unit Service Factor 100.0 94.5 86.2 1
20. Unit Availability Factor 100.0 94.5 86.2 I
21. Unit Capacity Factor (Using MDC Net) 99.0 92.8 83.5
22. Unit Capacity Factor (Using DEP, Net) 98.9 92.7 82.5
23. Unit Forced Outage Rate . 0.0 1.5 4.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of F.ach):

Refueling / Maintenance Outage, October 12, 1990,- approximately 8 weeks. I

+

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A  ;
26. Units In Test Status (Prior to Commercial' Operation): Forecast Achieved -

INITIAL CRITICALITY 05/06/81 05/08/81 )

INITIAL ELBCTRICITY 05/24/81 05/25/81  !

00fGERCIAL OPERATION 08/01/81 07/30/81 t

Form 2/30 '

t

g,.

" 'l

.- DOCKET NO. 50-364 LNIT 2 .

M1E October 5, 1990 l i

COMPLETED BY D. N. Morey l TELEPHONE (205)899-5156 i

MONIN September  !

i MY AVERAGE MILY POWER LEVEL MY AVERAGE MILY POWER LEVEL i (M9e-Net) (IMe-Net)  ;

1 789 17. 828  !

2 813 18 822 3

3 814 19 '822'  !

y 4 814 20 820 _;

5 819 21 819 <

I 6 820 22 816 7 817 23 829 l 8 816 24 835 9 818 25 836 i

10 818 26 829 [

11 817 27, '831 12 812 28 822  !

i 13 817 29 825  !

l  !

14 818 30 824 1 15 816 31 i i

16- 818 a

r INSTRUCTIONS f

On this format, list the average daily unit power level in )We-Net for each day in the reporting month. Conpute to the nearest whole megawatt.- ,

I k h

Form 13/21

UNIT SWoTDOWNS AND POWER REDUCTIONS DOCIET 90. '59-364

  • UNIT RhfE .J. f'. FABIAT - WWIC 2 -.~s DATE october 5,'1999 * * .

CORP 12TED ST D. W. 70 DEFT =

  • REPORT 790NTE SEPTEMBER TEIAPWOWE (2657899-5154 *
  • I I l l l l ftETHOD OF l LICENSEE l l l CAUSE & CORRECTITE l l l l l DURATION l l ETENT l SYSTEM l COMPOWENT l ACTION TO iso. I DATE I TTrE 2 z l SHUTTING i REASON  ; ,,,, ,,,c,,,3 y c,,,5 l

l (nooRS) , ,,,,,, , y c,,, , ,,,,,,,, ,,c,,,,,c, ,

-lTher3 were no unit shutdowns or significant power reductions during the month of September. l l l .. I I I I I I I I I I

.l. I I I I 1 I I I I I I l-I I I I I I I I I '

I 1. I I I I I I I I I I I I I l I I I I I i 1 1- 1 I l I i I i i I

'l i I I I I i i I .I I I I I I I I I I I-I l '~ l 1 I I I I I -I I i l l- 1 I I I I i .I I 'l 1 1 .. I - l' I I I I I I I I i i i l i I l i I I I

1 I I I i i i I I i i i i i l I I I :l I i i l- 1. I- 1 1 I I i i l' l I i 1. I I I I I I I I I l~ -l I. I I I I I I I l I. I 1. I I I I I I I l 1. I- 1 I l I. I I I I li l I 1 i I i i 1 I i

-1 I I I I l i I I I i l-I F: Fsreed Reason: Method: Exhibit G-Zastructices 2: Scheduled A-Equipeont Failure (Explain)' 1-Manual for Preparation of Data 5-Maintenance or Test 2-Manual Scram. Entry Sheets for Liceesee 1

C-Refueling 3-Automatic Scram. Eveet soport(LERI File (NUEtEG-D-Regulatory Restriction - .4-other (Esplain) 0161)

E-operator Training & License Examination F-Administrative Eskibit I -Same Source G-operational Error (Emplain)

N-other (Emplain) sum amm 1/2