Alabama Power Company 40 inwness Center Parkway l-
~..
. Post Offee Box 1295 1
Bamingham, Alabama 35201 l
Telephone 205 868 5581 i
W. G. Haireton, lli Senior Vce President I
Nuclear Operations gggggp October 12, 1990 NA-90-5541 ine scunem smer,csyson '
L I
r Docket No. 50-364 f
i U. S. Nuclear. Regulatory, Commission i
ATTN:
Document Control Desk Vashington, D. C.
20555 j
Joseph M. Parley Nuclear. Plant i
Unit 2
.i Monthly Operating Data Report Attached is the September 1990 Monthly Operating Report for Joseph M.:
Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.-
_j If you have any questions, please advise.
l
' Respectfully submitted, f
-j k
ton,III-
.a JAR:edb3014 Attachments cc:
Mr. S. D. Ebneter Mr. S. T. Hoffman j
Mr. G. F. Maxwell i
i a
i hk h,o 01 4
i a
g j
,kg
- j --
+
c-9:
r i
1 s
Lt e,
JOSElH M. FARIAT NUCLEAR PLANT,
' UNIT 2 NARRATIVE SikNARY OF. OPERATIONS Septesdaer, ' 1990 -
i a i
There were no unit shutdowns. or significant, power reductions durirut the amonthi.
of Septemter.
4 The following major safety-related mainternance uns perforned in the morith' ofc l
Septender:
-l 1
t
..i-
- 1. Miscellaneous corrective and preventive maintenance was performed on i
the diesel generators.
c,. +
.2. 2B service water pump motor oil: cooler wan' replaced'.,
,I
- 3. Miscellaneous safety related 4160V. breaker preventative maintenance tasks!
L.
were perfornurl.
s t
...J t
!i i!
I s
1 g
I I
i
+
4 a-i y
h '
l r
n [
f I
i
..t'r
'{
s
.e
'I r
d s y -.
3 hI Lj{
-\\
s
._+
. f^
- _f (
o) h
..;. i
-1
--'i.,'.
.5 lI o
ei
' {
- 7, k;
s 3
- ! s a
- k,.
[
/[
t Il l.', 9 f
.y h~
1 4
o m, 5
i
j 4
CPERATING m'In REFW!T l
DOCKET No. 50-364 Dh5E October 5, 1990 Om BY D. N. Morey
'IEIARKBE (205)899-5156 -
OPERATIIC 8'Ik'IUS
' hotos
- 1. Unit Name:
Joseph M. rarley - Unit 2
- 1) Cunulative data since
- 2. Reporting Period:
September 1990 7-30-81, date of
- 3. Licensed '!hermal Power (79ft):
2,652 commercial operation.
- 4. Nameplate Rating (Gross MWe):
860 i
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MNe):
868.6
- 7. Maximum Dependable Capacity (Not MNe):
828.2 J
- 8. If Changes Occur in Capacity Ratings (Items Number 3 '!hrough 7) Since Last Report, Give Reasons: N/A i
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A l
~
-}
i
'this Month Yr-to-Date Oumlative
- 11. Hours In Reporting Period 720 6,551 80,400 i
- 12. Number Of Hours Reactor Was Critical 720.0 6,207.4 70,090.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 720.0 6,190.8 69,262.8
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross '!hermal Energy Generated. (MNH) 1,907,101 16,192,382 176,448,649
- 17. Gross Electrical Energy Generated (MNH) 619,754 5,294,440 57,960,982
- 18. Net Electrical Energy Generated (799H) 590,350 5,034,344 54,977,734
+
- 19. Unit Service Factor 100.0 94.5 86.2 1
- 20. Unit Availability Factor 100.0 94.5 86.2 I
- 21. Unit Capacity Factor (Using MDC Net) 99.0 92.8 83.5
- 22. Unit Capacity Factor (Using DEP, Net) 98.9 92.7 82.5
- 23. Unit Forced Outage Rate 0.0 1.5 4.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of F.ach):
Refueling / Maintenance Outage, October 12, 1990,- approximately 8 weeks.
I
+
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial' Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81
)
INITIAL ELBCTRICITY 05/24/81 05/25/81 00fGERCIAL OPERATION 08/01/81 07/30/81 t
Form 2/30 t
'l g,.
DOCKET NO.
50-364 LNIT 2
M1E October 5, 1990 l
i COMPLETED BY D. N. Morey l
TELEPHONE (205)899-5156 i
MONIN September i
MY AVERAGE MILY POWER LEVEL MY AVERAGE MILY POWER LEVEL i
(M9e-Net)
(IMe-Net) 1 789 17.
828 2
813 18 822 3
3 814 19
'822'
!y 4
814 20 820 5
819 21 819 I
6 820 22 816 7
817 23 829 l
8 816 24 835 9
818 25 836 i
10 818 26 829
[
11 817 27,
'831 12 812 28 822 i
13 817 29 825 l
14 818 30 824 1
15 816 31 i
i 16-818 a
r f
INSTRUCTIONS On this format, list the average daily unit power level in )We-Net for each day in the reporting month. Conpute to the nearest whole megawatt.-
I k
h Form 13/21
UNIT SWoTDOWNS AND POWER REDUCTIONS DOCIET 90.
'59-364 UNIT RhfE
. J.
f'. FABIAT - WWIC 2
-.~s DATE october 5,'1999 CORP 12TED ST D. W. 70 DEFT
=
REPORT 790NTE SEPTEMBER TEIAPWOWE (2657899-5154 I
I l
l l
l ftETHOD OF l LICENSEE l l
l CAUSE & CORRECTITE l
l l
l l DURATION l z l SHUTTING l ETENT l SYSTEM l COMPOWENT l
ACTION TO l
2 iso.
I DATE I TTrE l (nooRS) i REASON ;,,,,,,,c,,,3
,,,,,,,, y c,,,
y c,,,5
,,,,,,,,,,c,,,,,c,
-lTher3 were no unit shutdowns or significant power reductions during the month of September.
l l
l..
I I
I I
I I
I I
I I
.l.
I I
I I
I I
I I
I l-1 I
I I
I I
I I
I I
I I
1.
I I
I I
I I
I I
I I
I I
I l
I I
I I
I i
1 1-1 I
l I
i I
i i
I
'l i
I I
I I
i i
I
.I I
I I
I I
I I
I I
I l '~
l I-1 I
I I
I I
-I I
i l
l-1 I
I I
I i
.I I
'l 1
1..
I
- l' I
I I
I I
I I
I i
i i
l i
I l
i I
I I
- 1 I
I I
i i
i I
I i
i i
i i
l I
I I
- l I
i i
l-1.
I-1 1
I I
i i
l' l
I i
1.
I I
I I
I I
I I
I l~
- l I.
I I
I I
I I
I l
I.
I 1.
I I
I I
I I
I l
1.
I-1 I
l I.
I I
I I
li l
I 1
i I
i i
1 I
i
-1 I
I I
I l
i I
I I
i l-IF: Fsreed Reason:
Method:
Exhibit G-Zastructices 2: Scheduled A-Equipeont Failure (Explain)'
1-Manual for Preparation of Data 5-Maintenance or Test 2-Manual Scram.
Entry Sheets for Liceesee 1 C-Refueling 3-Automatic Scram.
Eveet soport(LERI File (NUEtEG-D-Regulatory Restriction -
.4-other (Esplain) 0161)
E-operator Training & License Examination F-Administrative Eskibit I -Same Source G-operational Error (Emplain)
N-other (Emplain) sum amm 1/2
.-. =