ML20059N033

From kanterella
Jump to navigation Jump to search
Mod 37,incorporating Award Fee Earned by Contractor for Evaluation Period 7 to, Technical Assistance in Support of NRC Licensing Activities
ML20059N033
Person / Time
Issue date: 09/20/1990
From: Hagan T
NRC OFFICE OF ADMINISTRATION (ADM), SCIENCE APPLICATIONS INTERNATIONAL CORP. (FORMERLY
To:
Shared Package
ML20059M991 List:
References
CON-NRC-03-87-029, CON-NRC-3-87-29 NUDOCS 9010090067
Download: ML20059N033 (2)


Text

W!

T-]

[

i.

H y

J.

's

4. CON T RACT 3O CQQE.

pAGE. OF PAGE5 i

pr AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

)

p, i'

p. AMENDMENI/MOOf f IC Al #ON t40 3.LtiECilVE DATE
4. StLQUlst 1 IONA*UM H A5E fit 4. NO.
6. PHOJLC1 NO. (t/ oppJace6,c; -

37 -~

E p p. O 3 0 NRR-87-029 dtd. 9/18/90.

I

6. a55UED esY
7. ADMINisTE RED BV (J/ other then Arten 6)

-CODE U.S. Nuclear Regulatory Comission

~ Division of Contracts'& Property Management Washington, D.C.-

20555 s;N AM( AND ADDRE SS OF CONI H AC (OH (ho, sferf f. foWafF. State end Zip Code)

(/)

9A. AMENOMENT OF SOLICli AT #ON NO.

Science Applications International Corporation 1710 Goodridge Drive, MS G-6-1

90. OA1LO (SEE ITEbl J Al Mct.ean, VA 22102 3oA. MOOlf ICAilON OF CONT R ACT/ORDEft NO.

p X

NRC-03-87-029 F

s ou. DAT LD (SLE ITEbl 13)

CODE lF ACIL1TY CODE 2/l7/87

11. THIS ITEM ONLY APPLIES TO AMENOMENTS OF SOLICITATIONS

]

O The.ao.e ne.. ed seiicita ien is ameneed as set ie th in i.e i.. The hout a,.d date s-cifiee f,. rec..pt ef Of,er, O is e.teeded.

O i, no, e..

eended.

Of fits must ackr owiedge rece pi of this amendment prior to the hout and date srecified in the schcitawn or es amended. by one of the following methods:

i4 0'y complehno liems 8 and i5. and returning copies of the anendment. (th Oy ackncwin; ao receipt of ms amendment on each copy of the of fer I

sutvnitted; or (c) By separate letter or ietegram which includes a reference to the sohcitahon and ameenent nemters r AlltJRE OF YOUR ACKNowlEoG<

MENT TO BE RECElvED AT THE rLACE DESIGNATED FOR THE RECEIPT OF OFFEOS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OrFE R. If by virtue of this amendment you desire to change an of fer a!reMy submitted, such Change may be made by telegram or te(ter, provided each telegram or letter makes relcrence to the Solicitateon and this amendment, and is rmived prior to the ogyning hout and date speCiIiedf 12, ACCOUNilNG AND APPHOPRI A t ION DA1 A (lf requered)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTb/ ORDERS, t

IT MODIFIES THE CONTR ACT/ ORDER NO. AS DESCRIBED IN ITEM 14 A, T us5 CHANGE Of4OL H 15155U0 0 PURSUANI IOt (Sectify culhority) T HE CHANGES 50 Y FOF4 TH IN IT EM 14 AHE M ADE IN THE CON.-

'g g

T R AC T OR DE H NO. IN lif M 10A.

j DiTHE AD.OVE NUMDEnED CONT R ACT/OnOC f415 MOOtFIED TO REFLECT T HE ADMINIST R ATIVE CHANGES (such as chan,es appropri fion sf ate, ett j SE T FORTH IN ITEM la. I'URSUAN T TO THE AUTHoftlTY OF FAR a3.103(D),

]

1

.X C. THIS SUPPLt MLN T AL AC HLEMEN T 15 EN Tl'REO INIO PUHSUAN T TO AUT HOftli Y OF,

a D. O1HE4 (5pecify type of modnistetson and euthorety)

X Section G.2, " Award Fee and Performance Evaluation"

', E. IMPORTANT: COnuactor b is not. -

is required to sign this document and return copies to the issuing Of fiCe; f

x0 e 5 e H,.,,0 N O F - N - N,,M 0 0,,, e A T,O N (O,,.-

n, DCr...., h..d,n...

,,-.n,

.........,.on,,......,..

m......n.,e i. ~..,

See page 2, y

a

]

s 1e 9010090067 900920F PDR C ONTR NRC-03-87-029 PNuc

, Eitept as provided hereen. all terms and Condations of the document referenced 6n item 9A or 10A. as heretofore Changed, remains unchanged and in f ull force and if f tt.

i i$ A. N AME AND TI T LE OF 58GNC H (Type or preaff 16A' N AML AND Ta I LE OF CONI H AC TING OF F ICER (Type orpr8mfJ TimotJy E,-yagan, Contracting Officer

\\

ISH. CON T H AC TOH/OF F E 840H,

t SC. DA TE 54GNED p4FTJNI T E D

'"6 A

3 6C. O A SIGNLO

,Ahrt.;p.,,r..rmmw,

$ 90 /o

)

,S.e

...,.r.,4.mau.e,

N5N 7540-01 152 8070 -

30 105 ST ANDARD FORM 0 (REV.10 8 3)

Prescribed Dy GSA

, il 3 PREVIf,US COITION UNUSAOLE r n re t4n CFH) 53 743

f

NRC-03-87-029 Modification No. 37 Page 2.

The purpose of this modification is to incorporate the award fee earned by the Contractor for Evaluation Period No. 7 (August 18, 1989 through February 17,1990) and to identify the unearned award fee for this period.

Accordingly, the subject contract is modified as follows:

Section G.2., " Award Fee and Performance Evaluation", paragraph "1.",

is revised to read as_follows "1.

An award' fee pool of $356,897.00 for Evaluation Period Nos. 1 through 7 is hereby established.

The cumulative award fee earned by the contractor for period Nos. I through 7 (February 17, 1987 through February 17, 1990) is

$336,116.00.

The cumulative residual fee for period Nos. 1 through 7 is

$20,781.00.

The.following reflects the amount of fee available and earned-for each evaluation period specifieo:

EVALUATION PERIOD AVAILABLE FEE AMOUNT EARNED RESIDUAL 1 (2/17/87 - 5/17/87) $ 4,670.00

$ 4,611.00 59.00 2 (5/18/87 - 8/17/87) $11,145.00

$10,556.00

$ 589.00 3 (8/18/87 - 2/17/88) $27,366.00

$25,301,00

$2,065.00-i (2/18/88 - 8/17/88) $70,528.00

$67,778.00

$2,750.00 5 (8/18/88 - 2/17/89) $64,071.00

$60,515.00

$3,556.00 6'(?/18/89 - 0/17/89) $87,813.00

$81,675.00

$6,138.00 7 (8/18/89 - 2/17/90)- $91,304.00

$85,680.00

$5,624.00 TOTAL

$356,897.00

$336,116.00

$20,781.00" All other terms and conditions, including the ceiling amount of_the contract-of $17,046,482.00, remain unchanged.

l e