ML20059N015

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp Summary Rept Second Interval,First Period,Fourth Outage, Vols 1-4
ML20059N015
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/26/1990
From: Cross J
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059N017 List:
References
NUDOCS 9010090033
Download: ML20059N015 (1)


Text

.

4 i s 7_.,

^'e w-g i:

W M 88ddCQN4MB1)f i

4 James E. Cross Vice President, Nuclear September 26, 1990.

4 Trojan Nuclear Plant Docket 50-344 License NPF-I f'

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555

Dear Sirs:

1

.Inservipe_ Inspection Summary Report

. Title 10 of the Code of Federal Regulations, Part 50, Section 55a, Paragraph s~[10 CFR'50.55a(g)), requires the. submittal:of an inservice inspection (ISI) summary report in accordance with American Socloty of Mechanical Engineers (ASME)Section XI, Paragraph IWA-6230 wit: 'n 90 days j

- of the completion of the ISI conducted during a refueling outat,;.. Enclosed t

is the Trojan Nuclear Plant Inservice Inspection Summary Report for the second interval, first period, fourth outage.

Sincerely, f

Enclosure c:

Mr. John B. Mariin

.' Regional-Administrator, Region V

-i U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy (w/o onclosure)

Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant (w/o enclosure)

Mr. C. Hinsen Chief Boiler Inspector State of Oregon Building Codes Agency Q]j@]

f 1

I

%L I\\

y

-9010090033 900926 121 SW Salmon St. Portland, OR 97204 j

503/464-8897.

PDR ADOCK 05000344 t, }... Q PDC y