ML20059N015
| ML20059N015 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 09/26/1990 |
| From: | Cross J PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059N017 | List: |
| References | |
| NUDOCS 9010090033 | |
| Download: ML20059N015 (1) | |
Text
.
4 i s 7_.,
^'e w-g i:
W M 88ddCQN4MB1)f i
4 James E. Cross Vice President, Nuclear September 26, 1990.
4 Trojan Nuclear Plant Docket 50-344 License NPF-I f'
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555
Dear Sirs:
1
.Inservipe_ Inspection Summary Report
. Title 10 of the Code of Federal Regulations, Part 50, Section 55a, Paragraph s~[10 CFR'50.55a(g)), requires the. submittal:of an inservice inspection (ISI) summary report in accordance with American Socloty of Mechanical Engineers (ASME)Section XI, Paragraph IWA-6230 wit: 'n 90 days j
- of the completion of the ISI conducted during a refueling outat,;.. Enclosed t
is the Trojan Nuclear Plant Inservice Inspection Summary Report for the second interval, first period, fourth outage.
Sincerely, f
Enclosure c:
Mr. John B. Mariin
.' Regional-Administrator, Region V
-i U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy (w/o onclosure)
Mr. R. C. Barr NRC Resident Inspector Trojan Nuclear Plant (w/o enclosure)
Mr. C. Hinsen Chief Boiler Inspector State of Oregon Building Codes Agency Q]j@]
f 1
I
%L I\\
y
-9010090033 900926 121 SW Salmon St. Portland, OR 97204 j
503/464-8897.