ML20059M880
| ML20059M880 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/16/1993 |
| From: | Callan L Office of Nuclear Reactor Regulation |
| To: | Dennis Morey SOUTHERN NUCLEAR OPERATING CO. |
| References | |
| NUDOCS 9311190414 | |
| Download: ML20059M880 (2) | |
Text
.
bfkIAUdb.hb bbNkilbNil e
0 Docket Nos. 50-348' DISTRIBUTION:
and 50-364 Docket File l
NRC & Local PDRs i
Mr. D. N. Morey, Vice President PDII-l R/F l
Southern Nuclear Operating Co., Inc.
P. Anderson Post Office Box 1295 B. Siegel i
Birmingham, Alabama-35201-1295 S. Bajwa L. J. Callan i
Dear Mr. Morey:
SUBJECT:
PROPOSED RULE FOR PROTECTION AGAINST MALEVOLENT USE OF VEHICLES AT NUCLEAR POWER PLANTS - JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 i
On November 4,1993, the Commission published in the Federal Reaister (58 FR i
58804) proposed amendments to 10 CFR Part 73 that would modify the design basis threat for radiological sabotage to include use of a land vehicle by adversaries. The Federal Reaister notice refers to a draft regulatory guide prepared by the staff that contains prelimirury information for licensees on initial assessments of protective measures against vehicle intrusions and approaches to assess whether the Commission's design goals and criteria are met by measures taken to protect against vehicle intrusion. The Commission's i
Office of Nuclear Regulatory Research is in the process of publishing this i
proposed guide.
A preliminary version of the draft guide was included as Enclosure 8 to SECY-93-270, " Proposed Amendments to 10 CFR Part 73 to Protect Against Malevolent Use of Vehicles at Nuclear Power Plants," September 29, 1993. SECY-93-270 is available in the public document room. To facilitate any comments you may have on the proposed rulemaking package, enclosed is Safeguards Information-4 that is referenced in the preliminary draft guide.
It provides the proposed characteristics of the design basis vehicle (forwarded to you earlier),
i guidance for barrier design, and guidance for blast analysis.
l When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information. The j
Safeguards Information will be updated and forwarded to licensees after publication of any final rulemaking, if necessary.
4 Sincer.ely,igned by Ungsnals L. J. Callan, Acting Associate Director for Projects Office of Nuclear Reactor Regulation cc:
See next page
Enclosure:
Safeguards Information LA:PD2NDd5E PM:PD21:DRPE D:PD21:DRPE ADP:NRR OFFICE PAndekoY BSiegelk SBajwa M [/ LJCaGan mE DATE/ /93 11//()h 11///)/93 I 11//h3 0FFICIAL RECORD COPY Document Name: GL\\FARSAE1TRtwne, mired Wxn cora:*, e /c \\,k i unciasGed Women MF~"i^ enclosures, W5 dGCUWN IS DECO'E PI d hhh f h 9311190414 931116 m. -, r r m xm,- iOI.h Nk kk bb5N f
v__ b Mr. D. N. Morey Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. cc: Mr. R. D. Hill, Jr. State Health Officer General Manager - Farley Nuclear Plant Alabama Department of Public Health Southern Nuclear Operating Co., Inc. 434 Monroe Street Post Office Box 470 Montgomery, Alabama 36130-1701 Ashford, Alabama 36312 Chairman Mr. B. L. Moore, Licensing Manager Houston County Commission Southern Nuclear Operating Co., Inc. Post Office Box 6406 Post Office Box 1295 Dothan, Alabama 36302 Birmingham, Alabama 35201-1295 Regional Administrator, Region II James H. Miller, III, Esquire U. S. Nuclear Regulatory Commission Balch and Bingham Law Firm 101 Marietta St., N.W., Ste. 2900 Post Office Box 306 Atlanta, Georgia 30323 1710 Sixth Avenue North Birmingham, Alabama 35201 Resident Inspector U.S. Nuclear Regulatory Commission Mr. J. D. Woodard Post Office Box 24 - Route 2 Executive Vice President Columbia, Alabama 36319 Southern Nuclear Operating Company P.O. Box 1295 Birmingham, Alabama 35201 t [ r}}