$$b Docket No. 50-289 NOV 161993 Distribution w/o enclosure:
Docket File NRC & Local PDRs Mr. T. Gary Broughton, Vice President PDI-4 Plant and Director - TMI-l SNorris GPU Nuclear Corporation RHernan Post Office Box 480 Middletown, Pennsylvania 17057
Dear Mr. Broughton:
SUBJECT:
PROPOSED RULE FOR PROTECTION AGAINST MALEVOLENT USE OF VEHICLES AT NUCLEAR POWER PLANTS On November 4,1993, the Commission published in the Federal Reatster (58 FR 58804 to 58807) proposed amendments to 10 CFR Part 73 that would modify the design basis threat for radiological sabotage to include use of a land vehicle by adversaries. The Federal Reaister notice refers to a draft regulatory guide prepared by the staff that contains preliminary information for licensees on initial assessments of pretective measures against vehicle intrusions and approaches to assess whether the Commission's design goals and criteria are met by measures taken to protect against vehicle intrusion. The Commission's Office of Nuclear Regulatory Research is in the process of publishing this proposed guide.
A preliminary version of the draft guide was included as Enclosure 8 to SECY-93-270, " Proposed Amendments to 10 CFR Part 73 to Protect Against Malevolent Use of Vehicles at Nuclear Power Plants, September 29, 1993.
SECY-93-270 is available in the public document room. To facilitate any comments you may have on the proposed rulemaking package, enclosed is Safeguards Information that is referenced in the preliminary draft guide.
It provides the proposed characteristics of the design basis vehicle (forwarded to you earlier),
guidance for barrier design, and guidance for blast analysis.
When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information. The Safeguarn Information will be updated and forwarded to licensees after publication of any final rulemaking, if necessary.
Sincerely, Originalsigned by L. J. Callan 9311190390 G31116 Acting Associate Director for Projects DR ADOCK 0500 9
Office of Nuclear Reactor Regulation
Enclosure:
Safeguards Informatipg. n,
a
! g cc w/o enclosure:
[^ -(
g 9 *h
,,.g'",,,.,~s,.
A See next page
"~
o DFFICE LA:PDI-4 PM:PDI-4,
D:h4 ADPR: Acting WJ Shr RHernan:bh/TIJSto b LCalk NAME DATE j! //()/93 0 /17]/93
// /h /93
/r / Ik
/ /
O-G:\\HERNAhyL,.c-0Lf Jt0 ids u edhnU!pq OfilCIAL RECORD COPY ywL d
E-Document Name:
1 L --
s p
..,7,...
1.,c,-,r,p pt
- 4L Ne t wa g ue.,,
a;<...
UNITED STATES
[..)J1
.j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 2055E4001
/
NOV 161993 Docket No. 50-289 Mr. T. Gary Broughton, Vice President and Director - TMI-1
}
GPU Nuclear Corporation Fost Office Box 480 Middletown, Pennsylvania 17057
Dear Mr. Broc 9 ton:
SUBJECT:
PROPOSED RULE FOR PROTECTION AGAINST MALEVOLENT USE OF VEHICLES AT NUCLEAR POWER PLANTS On November 4,1993, the Commission published in the Federal Reaister (58 FR 58804 to 58807) proposed amendments to 10 CFR Part 73 that would modify the design basis threat for radiological sabotage to include use of a land vehicle by adversaries. The Federal Reaister notice refers to a draft regulatory guide prepared by the staff that contains preliminary information for licensees on initial assessments of protective measures against vehicle intrusions and approaches to assess whether the Commission's design goals and criteria are met by measures taken to protect against vehicle intrusion. The Commission's Office of Nuclear Regulatory Research is in the process of publishing this proposed guide.
A preliminary version of the draft guide was included as Enclosure 8 to SECY-93-270, " Proposed Amendments to 10 CFR Part 73 to Protect Against Malevolent Use of Vehicles at Nuclear Power Plants," September 29, 1993.
SECY-93-270 is available in the public document room. To facilitate any comments you may have on the proposed rulemaking package, enclosed is Safeguards Information 4
that is referenced in the preliminary draft guide.
It provides the proposed characteristics of the design basis vehicle (forwarded to you earlier),
guidance for barrier design, and guidance for blast analysis.
When the draft guide is formally issued, it will be forwarded to licensees through normal distribution without the enclosed Safeguards Information. The Safeguards Information will be updated and forwarded to licensees after publication of any final rulemaking, if necessary.
Sincerely, F
a tan Ac ng Associate Director for Projects Office of Nuclear Reactor Regulation me
Enclosure:
SG 4... -
Safeguards Informatioq;
. J r:.-ci :.cm cc w/o enclosure:
See next page p.w 3---
- -.- 3 5,. s; ; g C
.. Ih0
w Mr. T. Gary Broughton Three Mile Island Nuclear Station,
[
GPU Nuclear Corporation Unit No. 1 CC:
Michael Ross Michele G. Evans O&M Director, THI-l Senior Resident Inspector (TMI-1)
GPU Nuclear Corporation U.S. Nuclear Regulatory Commission Post Office Box 480 Post Office Box 311 Middletown, Pennsylvania 17057 Middletown, Pennsylvania 17057 i
Michael Laggart Regional Administrator, Region I Manager, Licensing U.S. Nuclear Regulatory Commission GPU Nuclear Corporation 475 Allendale Road 100 Interpace Parkway King of Prussia, Pennsylvania 19406 Parsippany, New Jersey 07054 Robert D. Borsum Robert E. Rogan B&W Nuclear Technologies TMI Licensing Director Suite 525 GPU Nuclear Corporation 1700 Rockville Pike Post Office Box 4B0 Rockville, Maryland 20852 Middletown, Pennsylvania 17057 Ernest L. Blake, Jr., Esquire William Dorr4sife, Acting Director Shaw, Pittman, Potts & Trowbridge Bureau of Radiation Protection 2300 N Street, NW.
Pennsylvania Department of Washington, DC 20037 Environmental Resources i
Post Office Box 2063 Chairman Harrisburg, Pennsylvania 17120 i
Board of County Commissioners of Dauphin County Mr. T. Gary Broughton, Vice President Dauphin County Courthouse and Director - TMI-1 Harrisburg, Pennsylvania 17120 GPU Nuclear Corporation Post Office Box 480 Chairman Middletown, Pennsylvania 17057 Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, Pennsylvania 17057 1