ML20059M712
| ML20059M712 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 11/04/1993 |
| From: | Edgar J SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| To: | Pierson R NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 9311190260 | |
| Download: ML20059M712 (1) | |
Text
i.
.i SIEMENS November 4,1993 U.S. Nuclear Regulatory Commission Attn: Mr. Robert C. Pierson, Chief Ucensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Washington, DC 20555 Ucense No. SNM-1227 Docket No. 70-1257
Dear Mr. Pierson:
Re:
1.
Lotter, JB Edgar to RC Pierson, dated October 8,1993 2.
Letter, RC Pierson to LJ Maas, dated October 21,1993 In reference 1 Siemens Power Corporation (SPC) suggested at least a six month delay in the NRC's review of SPC's license amendment application in connection with modifications to its gadolinia scrap recovery process. In reference 2 you described the inefficiencies inherent in such a delay. SPC, therefore, withdraws its request for the delay.
Very truly yours,
.@.(-
James Edgar Staff Engineer, Ucensing JBE:pm 18006?
If
/
O Siemens Power Corporation ii Nuclear Division - Engineering and Manufacturing Facility 2101 Horn Rapds Road, PO Box 130 Richland, WA 99352-0130 Tel: (509) 375-8100 Fax: (509) 375-8402 9311190260 931104 M
PDR ADOCK 07001257
<d C
pon
,)
'