ML20059M440

From kanterella
Jump to navigation Jump to search
Applicant Exhibit A-10,consisting of List of Maintenance & Surveillance Procedures
ML20059M440
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/17/1993
From:
AFFILIATION NOT ASSIGNED
To:
References
OLA-2-A-010, OLA-2-A-10, NUDOCS 9311190090
Download: ML20059M440 (79)


Text

{{#Wiki_filter:._ . . . . . _ . _ __ . . . . _. . . . _ _ . _. l

                                             &  .276323-OCA                                                      EXHIBIT 10-l-/ 8
                                                                                                                    .aum                      l U3NiiC '

l LIST OF MAINTENANCE AND SURVEILLANCE PROCEDURES.

                                                                                                            '93 DCI 28 PS :41' l

ei F iQ - Oi S h i.',ht. 'i/sh Y t 'DUCnt:ittG 'LrVKJ ! M. A hUi l l i l l l l l l { i

 )

pe~ . _c,.,' t' ' NUCLEAR RECULATORY COMMISSION - Decket No.bhb OLM_ Officla! E h,No.

                                                        . In the snat'er of _[AM16 AS Ach&_r>t.)0 (6 s S!8ff -                                IDiNilHID ' .
 )'                                                       A;,% cast       $. _ .!'              = R!crtVE D Intersve:4 _ _ _ _                     REJECitt)

Cut c OT. sgb cocumu j f hMut ' 9,- )) -98 9311190090 9308177 ount w,tnu, ~ PDR ADOCK 05000275 l 1-G , P@; n, perter bDNie-- 4'esock

                                                                                              )

' ~ t-  !

! I t- 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 1 VOLUME SA ELECTRICAL MAINTENANCE PROCEDURES l l TABLE OF CONTENTS NUMBER REV UNIT TITLE

    ===............ ... ....
                                   ........................................................===

r MP E-2,1 3 1&2 l

                                   ** CONDENSATE PUMP MOTOR OVERHAUL MP E-2.2            3 1&2      ** CONDENSATE BOOSTER PUMP MOTOR OVERHAUL MP E-3.1           7 1&2       ***AUXILIARYcFEEDWATER PUMP MOTOR OVERHAUL-f    MP E-3.2           2 1&2       ** AUXILIARY FEED WATER TURBINE PUMP TACH-PAK 3 AND RPM-INDICATOR VERIFICATION MP E-5.1           0 - 1&2     ** HEATER 2 DRAIN PUMP MOTOR OVERHAUL WESTINGHOUSE WORLD SERIES HOTOR

, MP E-7.3 3 -l&2 ** REMOVAL, DISASSEMBLY & REASSEMBLY OF THE OPERATING CONTROL R00 DRIVES MP E-7.5A 4 1&2 *** MAINTENANCE OF PRESSURIZER HEATERS, PM MP E-7.5B 0 It? ** PRESSURIZER HEATER INSULATOR REPAIR MP E-7.6 7 1&2

  • ROUTINE PREVENTIVE MAINTENANCE OF SCR POWER CONTROLLER FOR PRESSURIZER HEATERS MP E-8.1 1 1&2 ** CENTRIFUGAL CHARGING PUMP MOTOR OVERHAUL MP E-10.1 11 1&? **RHR PUMP MOTOR OVERHAUL
 ) MP E-10.3           1   1&2    ***RHR PUMP MOTOR PARTIAL DISASSEMBLY IN PLACE MP E-10.4                           (WESTINGHOUSE MANUFACTURER) 1   1&2 MP E-14.1                      ***CAllBRATION AND TESTING OF THE RHR MID LOOP CURRENT ALARM 5 1&2       *** COMPONENT COOLING WATER PUMP MOTOR OVERHAUL MP E-17.1          7 1&2       ** AUXILIARY SALTWATER PUMP MOTOR OVERHAUL MF E-17.2A         3 1&2
  • MAINTENANCE OF CIRCULATING WATER PUMP MOTORS MP E-17.2B 6 1&2 *** CIRCULATING WATfR PUMP MOTOR DISASSEMBLY. INSPECTION, AND REASSEMBLY l MP E-21.1 7 IL2 ** MAINTENANCE Of DIESEL GENERATOR
MP E-?l.4* 4 162 ** DIESEL GENERATOR TACH-PAK 3 AND RPM INDICATOR i TESTING /CAllBRATION Mr E-21.5 2 IL2

) Mf E-21.6 " DIESEL GENERATOR AIR C0h"10LLER (KW SENSOR) 3 IL2 " DIESEL GENERATOR ELECTRICAL GOVERNOR MAINTENANCE AND ADJUSTMENT I4 E-22.1 5 IL2 **HIGH VOLTAGE DC TEST OF MAIN GENERATOR , MF E-23.1 11 IL2

                                 " MAINTENANCE Of REACTOR CONTAINMENT FAN COOLER MOTOR MP E-23.2          0 IL2      *** CONTROL ROD DRIVE MECHANISM EXHAUST FAN MOTOR OVERHAUL MP E-23.3          4 IL2 MP E-23.4
  • LUBRICATION OF REACTOR CONTAINMENT FAN COOLER MOTORS  :

[ 5 IL2 **RCUTINE PREVENTIVE MAINTENANCE OF INTERNAL HYDROGEN RECOMBINER MP E-35.1 3 1&2 ** TEMPERATURE INSTRUMENTS CALIBRATION CHECK MP E-35.2 7 IL2 ** MAINTENANCE OF TRANSFORMER TEMPERATURE PROBES MP E-35.3 0 lL2

  • PRESSURE INSTRUMENTS CALIBRATION CHECK MP E-35.4 1 1L2 ** LEVEL INSTRUMENTS CAllBRATION CHECK
)  MP E-35.5_         2 1&2      *lNSTRUMENTATION DEVICE AND SETPOINT LIST MP E-41.lA 14 162       ** MAINTENANCE OF WESTINGHOUSE TYPE 08-50 480V REACTOR TRIP AND BYPASS CIRCulT BREAKERS MP E-41.lB         2 1&2
  • WESTINGHOUSE 0B-50 CIRCUIT BREAKER UVTA REPLACEMENT b

l 22 JUL 93 DIABLO CANYON POWER PLANT-  ! UNITS 1 AND 2 VOLUME SA ELECTRICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE as==szamazzsazz sa m - rssus ass a s sa m ma s s mas s am a m mas as s s ama a sass ss s s ss s ss ss s sss s s s s s s s sa i MP E-41.lC 2 1&2 ** MAINTENANCE OF WESTINGHOUSE.DB-50 480V MAIN GENERATOR 1 FIELD CIRCU1T BREAKERS AND R0D CONTROL MG SET OUTPUT. BREAKERS MP E-41.2 5' 1&2

  • MAINTENANCE OF REACTOR TRIP SWITCHGEAR AND MG SET l' CONTROLLER MP E-41.3 2 1&? ** CONTROL R00 DRIVE MG SET GENERATOR OVERHAUL MP E-42.1 0 1&2 ** POLAR CRANE.PC CARD REMOVAL, STORAGE, AND REINSTALLATION-MP E-42.2A 0 1&2 ** ELECTRICAL MAINTENANCE 0F-PLANT CRANES. HOISTS-AND MONORAILS MP E-42.28 1 1&2 ** ELECTRICAL MAINTENANCE OF POLAR CRANE MF E-42.2C 2 1&2 ** ELECTRICAL MAINTENANCE 0F MANIPULATOR CRANE.

MP E-42.20 1 1&2 ** ELECTRICAL MAINTENANCE OF SPENT FUEL P0OL CRANE . MP E-45.'1 0 1&2 *** ELECTRICAL PENETRATION REPAIR MP E-50.1 22 -l&2 ** MAINTENANCE OF THERMAL OVERLOAD RELAYS AND LINE STARTERS , MP E -50.2 5 1&2 ** WESTINGHOUSE TYPE TD-5 RELAY' MAINTENANCE .. MP E-50 3' 6 1&2-

                                 " WESTINGHOUSE TYPE SA-1 GENERATOR.DIFFERENTI AL RELAY 2

MAINTENANCE MP E-50.4 15 IL? " GENERAL ELECTPIC TYPE IAC RELAY MAINTENANCE MP E-50.5 1 1&2 ** WESTINGHOUSE. TYPE IRV-2 DIRECTIONAL OVERCURRENT RELAY  ; MAINTENANCE . ) MP E- 50.6 1 IL2 ** WESTINGHOUSE TYPE "AR" (HIGH SPEED) AUXILIARY RELAY. , MAINTENANCE . MP E-50.7 8 IL2 ** GENERAL ELECThlt TYPE IJCV RELAY MAINTENANCE > MP E-50.8 6 IL2 ** WESTINGHOUSE TYPE MG-6 RELAY MAINTENANCE MP E-50.9 5 IL? "* WEST'NGHOUSE TYPE .TK RELAY MAINTENANCE MF E-50.10A 0 IL2 **G.E. TYPE lAV54 RELAY MAINTENANCE MP E-5C.106 2 IL2 ** GENERAL ELECTRIC TYPE IAV55 RELAY MAINTENANCE- ) MP E-50.ll 11 1&2 " WESTINGHOUSE TYPE SC AND SV RELAY MAINTENANCE MP E-50.12 0 IL2 ** GENERAL ELECTRIC TYPE-RPM. RELAY MAINTENANCE. MP E-50.13 3 1&2 " ROUTINE PREVENTIVE MAINTENANCE OF'STV.-STATIC OVEREXCITATION RELAY MP E-50.14 1 IL2 ** GENERAL ELECTRIC TYPE CFD RELAY MAINTENANCE. . ) MP E-50.15 5 162 " GENERAL ELECTRIC TYPE IJS SYNCHR0-CHECK RELAY MAINTENANCE MP E-50.16 0 1&2 ** WESTINGHOUSE TYPE HRU RELAY MAINTENANCE- ' MP E-50.17 6 1&2 ** WESTINGHOUSE TYPE "CM" PHASE: BALANCE RELAY. MAINTENANCE. MP E-50.18 7 1&2- ** WESTINGHOUSE TYPE KLF LOSS OF FIELD. RELAY MAINTENANCE- i MP E-50.19 8 1&2 " WESTINGHOUSE ' TYPE COM-5 RELAY. MAINTENANCE 'i MP E-50.20 0 1&2 ** GENERAL ELECTRIC TYPE'HEA RELAY MAINTENANCE MP E-50.21 0 IL2 " GENERAL ELECTRIC TYPE RAV RELAY MAINTENANCE

)

MP E-50.22A 1 1&2 ** WESTINGHOUSE TYPE CV-2 AND CV-7 UNDERVOLTAGE RELAv MAINTENANCE MP E-50.228 0 1&2 ** WESTINGHOUSE TYPE CV-8 AND CV-25 OVERVOLTAGE-RELAY . MAINTENANCE _ .. . . l MP E-50.23 0 1&2 " WESTINGHOUSE TYPE SG AUXILI ARY RELAY MAINTENANCE

)

i u

                            -.                            ~   _

22 JUL 93 DIABLO CANYON POWER PLANT. UNITS 1 AND 2 VOLUME 5A ELECTRICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   ...........==== ..= .... ..........................................................=

MP E-50.24 1 1&2 ** WESTINGHOUSE TYPE CRN-1 REVERSE POWER RELAY MAINTENANCE MP E-50.25 0 1&2 ** WESTINGHOUSE TYPE C0Q RELAY MAINTENANCE MP E-50.27 0 1&2 ** WESTINGHOUSE TYPE CVQ RELAY MAINTENANCE MP E-50.28 10 1&2 ** WESTINGHOUSE TYPE C0 RELAY' MAINTENANCE MP E-50.29 0 1&2 ** WESTINGHOUSE TYPE AR AND ARD INDUSTRIAL CONTROL RELAY

                                    ' MAINTENANCE MP E-50.30       10 1&2       ** TESTING TIMING RELAYS i

MP E-50.31 6 1&2 ** GENERAL ELECTRIC TYPE HFA RELAY MAINTENANCE ) MP E-50.32 0 1&2 ** GENERAL ELECTRIC TYPE HGA RELAY MAINTENANCE MP E-50.33 17 1&2 ** WESTINGHOUSE TYPE SSV-T RELAY MAINTENANCE MP E-50.34 4 1&2 **STRUTHERS-DUNN GROUND CURRENT SENSOR RELAY MAINTENANCE l MP E-50.36 5 1&2 ** GENERAL ELECTRIC TYPE.IFC66 RELAY MAINTENANCE MP E-50.37 0 IL2

  • MAINTENANCE OF RIS MODEL ET-1200L CURRENT ALARMS MP E-50.40 1 1&2 ** ROUTINE PREVENTIVE MAINTENANCE OF GE TYPE "SLJ" i SYNCHRONISM CHECK RELAY f MP E-50.41A 2 1&2 **BASLER ELECTRIC TYPE. bel-81 SINGLE SETPOINT DIGITAL FREQUENCY RELAY MAINTENANCE MP E-50.415 1 1&2 "SASLER ELECTRIC TYPE bel-81~ THREE SETPOINT DIGITAL ,

FREQUENCY RELAY MAINTENANCE

MP E-50.42 1 IL2 ** WESTINGHOUSE TYPE KLF-1 LOSS OF FIELD RELAY MAINTENANCE j MP E-50.47 0 1&2 ** BROWN B0 VERI TYPE ITE-500 GROUND OVERCURRENT RELAY
MAINTENANCE MP E-50.50 0 IL2 ** GENERAL ELECTRIC TYPE CEB 0FFSET MHO RELAY MAINTENANCE MP E-50.51 1 1&2 ** WESTINGHOUSE TYPE HVH VOLTS /HERT2 RELAY MAINTENANCE MP E-52.1 9 1&2 ** MAINTENANCE Of DRY TYPE LOAD CENTER TRANSFORMER AND 480 VOLT SWITCHGEAR j MP E-52.2 3 1&2 ** MAINTENANCE Of LOW VOLTAGE DRY TYPE TRANSFORMERS MP E-52.3 0 1&2
  • MAINTENANCE OF GENERATOR NEUTRAL TRANSFORMER & RESISTOR GRID MP E-5?.4 5 1&2 ** MAINTENANCE Of' INSTRUMENT A-C TRANSFORMER / REGULATOR MP E-52.5 1 1&2 ** POWER TRANSFORMER RADIATOR REMOVAL & INSTALLATION .

MP E-53.1 8 1&2 ** MAINTENANCE'Of 115 & 480 VOLT' MOTORS I MP E-53.2 14 1&2 *** SPLIT END BELL, 4000 VOLT MOTOR OVERHAUL ) MP E-53.7 5 1&2 ** MAINTENANCE OF ITT, GENERAL CONTROLS HYDRAMOTOR ACTUATOR l MP E-53.7A 5 1&2 **REPAlR/0VERHAUL ITT CONTROLS HYDRAMOTORS MODEL NH92, l VALVE ACTUATORS FOR LCV-110, LCV-111, LCV-113 AND LCV-115

MP E-53.8 7 1&2 ** MAINTENANCE OF-REACTOR HEAD VENT VALVES l MP E-53.8B 0 1&2 ** TARGET ROCK PARTS REPLACEMENT PROCEDURE j MP E-53.10A MP E-53.10B 13 1&2 18 1&2
                                  ** PREVENTIVE MAINTENANCE Of LIMITORQUE MOTOR OPERATORS
                                  **LIMITORQUE OPERATOR TORQUE SWITCH ADJUSTMENT MP E-53.10C      11    1&2     **LIMITORQUE OPERATOR TORQUE SWITCH REMOVAL AND INSTALLATION MP E-53.100      17    1&2     **LIMITORQUE OPERATOR LIMIT SWITCH ADJUSTHENT MP E-53.10E        4 1&2       ** PREVENTIVE MAINTENANCE OF LIMITORQUE 90 DEGREE GEAR DRIVES    '

l l i

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 l VOLUME SA ELECTRICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

 =============== === ==== ===========================================================

MP E-53.10F 1 1&2 *LIMITORQUE OPERATOR TYPE SMC-04 LIMIT SWITCH GREASE l INSPECTION MP E-53.10G 5 1&2 **LIMITORQUE OPERATOR LIMIT SWITCH REMOVAL, REPAIR AND INSTALLATION i MP E-53.101 7 1&2 **LIMITORQUE SMB-000 VALVE OPERATOR MAINTENANCE 7 1&2 MP E-53.10K **LIMITORQUE SMB-0, 1, 2 AND 3 VALVE OPERATOR MAINTENANCE i AND DISASSEMBLY l MP E-53.10L 0 1&2 **HBC-0 THROUGH HBC-3 POSITION LIMIT STOP SETTING l MP E-53.10M 1 1&2 **LIMITORQUE SM6-00 AND 58-00 VALVE OPERATOR MAINTENANCE ) MP E-53.10N 1 1&2 **LIMITORQUE SMB-0, 1, 2 AND 3 VALVE OPERATOR MAINTENANCE AND DISASSEMBLY ! MP E-53.10T 1 1&2 ** WESTINGHOUSE VITALS MOTOR OPERATED VALVE DIAGNOSTIC TEST l MP E-53.10V 9 1&2 ** LIBERTY TECHNOLOGY VOTES MOTOR OPERATED VALVE DIAGNOSTIC i TESTING l MP E-53.10X 0 1&2 ** TROUBLESHOOTING LIM 1 TORQUE OPERATORS ) MP E-53.11A 2 1&2 ** PREVENTIVE MAINTENANCE OF ROTORK MOTOR OPERATORS MP E-53.llB 6 1&2 **ROTORK OPERATOR LIMll/ TORQUE SWITCH SETTING AND ADJUSTMENTS l MP E-54.2 10 1&2 **HIGH VOLTAGE TESTING OF ELECTRICAL EQUIPMENT MP E-54.5 5 1&2 ** POTTER & BROMflELD TYPE CSL AND~CSJ VOLTAGE SENSOR RELAY MAINTENANCE ) MP E-55.5A 11 1&2 *** MAINTENANCE OF BATTERY PACK EMERGENCY LIGHTS INSIDE l POWER BLOCK l MP E-57.2A 2 1&2 ** WIRE & CABLE INSTALLATION MP E-57.2B 16 1&2 ** WIRE AND CABLE TERMINATIONS MP E-57.2C 1 1&2 ** POWER SEMICONDUCTOR (STUD OR DISK) MOUNTING PROCEDURE MP E-57.4 7 1&2

  • ENVIRONMENTAL QUALIFICATION MAINTENANCE & SURVEY OF CONTAINMENT PENETRATIONS, CABLE, AND SPLICES MP E-57.5 1 1&2 ** MAINTENANCE Of COMPRESSION 0.Z./GEDNEY TYPE LOCA SEALS l MP E-57.6 1 1&2
  • ANCHOR BOLT INSTALLAT10N MP E-57.7B 2 1&2 **lNSTALLATION & REPAIR OF THERMAL-LAG 330 FIRE BARRIERS MP E-57.8A 4 1&2 *** TEMPERATURE MONITORING MP E-57.10A 1 1&2 ** MOTOR DRYING METHODS I MP E-57.10B 4 1&2 *** GENERIC MOTOR CLEAN, INSPECT, LUBE AND TEST PREVENTIVE MAINTENANCE MP E-57.llA 5 1&2
  • SAFETY PRECAUTIONS WHEN WORKING ON POTENTIALLY ENERGlZED EQUIPMENT MP E-57.11B 6 1&2 ** INSTALLING AND REMOVING GROUNDS FROM DEENERGlZED POWER PLANT ELECTRICAL EQUIPMENT MP E-57.12A 0 1&2 **ESNA 600 AMP SEPARABLE INSULATED CONNECTORS DETERM/RETERM MP E-57.13 1 1&2 ** CALIBRATION OF WIRE STRIPPERS AND CRIMPERS MP E-57.15 0 1&2 *** MAINTENANCE AND CAllBRATION OF AMMETERS V0LTMETERS, FREQUENCY METERS AND TACH 0 METERS

? l

l 22 JUL 93 DIABLO CANYON POWER PLANT ) UNITS 1 AND 2 l VOLUME SA ELECTRICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

      .........=.....    ..= .... ...........................................................

MP E-57.16 0 1&2 *** MAINTENANCE AND CAllBRATION OF WATT, VAR, POWER FACTOR METERS AND TRANSDUCERS MP E-57.17 0 1&2 ***SYNCHROSCOPE METER FUNCTIONAL TEST k MP E-58.1 2 1&2 ** GENERAL ELECTRIC TYPE SB-1 CONTROL SWITCH MAINTENANCE , MP E-58.2 2 1&2 ** WESTINGHOUSE XA SYNCHRONIZER RELAY MAINTENANCE MP E-58.5 9 1&2 **REPRESSURIZATION Of CONTAINMENT ELECTRICAL PENETRATIONS  ; MP E-59.1A 3 1&2 **lNSTRUCTIONS FOR ASSEMBLY-& TAPE INSULATION 0F 4 & 12KV ' l BUS . MP E-60.lA 0 1

  • MAIN GENERATOR PROTECTIVE CIRCUIT. FUNCTIONAL TEST.-

) CIRCulT GM1 MP E-60.1E O 1

  • MAIN GENERATOR PROTECTIVE CIRCulT FUNCTIONAL TEST -  ;

CIRCUIT GM2 MP E-60.2A 0 2

  • MAIN GENERATOR PROTECTIVE CIRCUIT FUNCTIONAL TEST'-

CIRCUIT GM2 i MP E-60.2B 1 2

  • MAIN GENERATOR PROTECT!vE CIRCUIT FUNCTIONAL TEST CIRCUIT

) GM2 l MP E-60.10 1 1&2

  • GENERIC RELAY FUNCTIONAL TEST INSTRUCTIONS l MP E-60.11 1 1
  • RELAY FUNCTIONAL TEST - STANDBY START-UP TRANSFORMER 11-PROTECTION SCHEME

! MP E-60.12 1 2

  • RELAY FUNCTIONAL TEST - STANDBY START-UP TRANSFORMER-21
  • L PROTECTION SCHEME

) MP E-60.13 2 1

  • RELAY FUNCTIONAL TEST - STANDBY START-UP-TRANSFORMER 12 l PROTECTION SCHEME i

MP E-60.14 1 2

  • RELAY FUNCTIONAL TEST - STANDBY START-UP TRANSFORMER 22-PROTECTION SCHEME MP E-60.15 0 1
  • RELAY rVNCTIONAL TEST - 12KV START-UP BUS 1. BUS-DIFFERENTIAL RELAY SCHEME MP E-60.16 2 2
  • RELAY FUNCTIONAL TEST - 12KV START-UP BUS 2 BUS DIFFERENTIAL RELAY SCHEME-MP E-60.17 3 1 *PELAY FUNCTIONAL TEST - UNIT 1 12KV BUS 0 DIFFERENTIAL RELAY SCHEME-l MP E-60.18 3 2
  • RELAY FUNCTIONAL TEST - UNIT 2 12KV BUS D'OlFFERENTIAL 4 i RELAY SCHEME

) MP E-60.19 3 1

  • RELAY FUNCTIONAL TEST - UNIT 1 12KV BUS-E DIFFERENTIAL l

RELAY SCHEME MP E-60.20 3 2

  • RELAY FUNCTIONAL-TEST - UNIT 2 12KV BUS E DIFFERENTIAL RELAY ~ SCHEME MP E-60.21 2 1
  • RELAY FUNCTIONAL TEST . UNIT 1 4.16KV BUS "D" DIFFERENTIAL I RELAY SCHEME ,

) MP E-60.22 2'2

  • RELAY FUNCTIONAL TEST - UNIT 2 4.16KV BUS "D" DIFFERENTIAL l RELAY SCHEME MP E-60.23 2 1
  • RELAY FUNCTIONAL TEST - UNIT 1 4.16KV BUS E DIFFERENTIAL-RELAY SCHEME.
 )

4 J-

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2

                                                                                                 )

VOLUME SA ELECTRICAL MAINTENANCE PROCEDURES l TABLE OF CONTENTS ) i NUMBER REV UNIT TITLE l

   ............... ..= .... ...........................................................

MP E-60.24 2 2

  • RELAY FUNCTIONAL TEST - UNIT 2 4.16KV BUS "E" DIFFERENTIAL  ;

l RELAY SCHEME MP E-60.25 2 1

  • RELAY FUNCTIONAL TEST - UNIT 1 4.16KV BUS "F" DIFFERENTIAL RELAY SCHEME l MP E-60.26 4 2 *(NON-PERM XPR 3-15-93/SCHUELKE) RELAY FUNCTIONAL. TEST -

UNIT 2.4.16 KV BUS F DIFFERENTIAL RELAY SCHEME-l MP E-60.27 1 1

  • RELAY FUNCTIONAL TEST - UNIT 1 4.16KV BUS "G" DIFFERENTIAL: RELAY SCHEME

) MP E-60.28 2 2

  • RELAY FUNCTIONAL TEST - UNIT 2 4.16 KV BUS "G" DIFFERENTIAL RELAY SCHEME MP E-60.29 2 1
  • RELAY FUNCTIONAL TEST - UNIT 1 4.16KV BUS "H" DIFFERENTIAL RELAY SCHEME-MP E-60.30 2 2
  • RELAY FUNCTIONAL TEST - UNIT 2 4.16KV BUS "H" DIFFERENTIAL RELAY SCHEME j

i MP E-60.31 2 2

  • RELAY FUNCTIONAL TEST - UNIT 2 12KV BUS D START-UP CABLE DIFFERENTIAL RELAY SCHEME l MP E-60.32 2 2
  • RELAY FUNCTIONAL TEST - UNIT 2 12KV BUS E START-UP CABLE

! DIFFERENTIAL RELAY SCHEME l MP E-60.33 1 1

  • RELAY FUNCTIONAL TEST - 12KV BUS D UNDERVOLTAGE TRIP-RELAY L SCHEME j MP E-60.31 1 2
  • RELAY FUNCTIONAL: TEST - UNIT 2 '2KV BUS D UNDERVOLTAGE TRIP RELAY SCHEME l MP E-60.35 1 1
  • RELAY FUNCTIONAL TEST - UNIT 1 12KV BUS.E UNDERVOLTAGE l TRIP RELAY SCHEME MP E-60.36 0 2
  • RELAY FUNCTIONAL TEST - UNIT 2 12KV BUS E UNDERVOLTAGE TRIP RELAY SCHEME j MF E-60.37 1 1 ' RELAY FUNCTIONAL. TEST - UNIT 1 4.16KV BUS D UNDERVOLTAGE' l

TRIP RELAY SCHEME MP E-60. % 1 2

  • RELAY FUNCTIONAL TEST - UNIT 2 4.16KV BUS "D" UNDERVOLTAGE TRIP RELAY SCHEME MP E-60.39 0 1
  • RELAY FUNCTIONAL TEST'- UNIT'1 4.16KV BUS "E" l

UNDERVOLTAGE TRIP RELAY SCHEME j MP E-63.40 0 2

  • RELAY FUNCTIONAL TEST -. UNIT 2 4.16KV BUS "E"~

F UNDERV0LTAGE TRIP RELAY SCHEME MP E-60.41 0 1

  • FUNCTIONAL TEST - CIRCULATING WATER PUMP 11 AUTOMATIC RECLOSE SCHEME .

MP E-60.42 0 2

  • FUNCTIONAL TEST - CIRCULATING. WATER PUMP 21 AUTOMATIC _ -l RECLOSE SCHEME j

MP E-60.43 0 1

  • FUNCTIONAL TEST - CIRCULATING WATER PUMP 12 AUTOMATIC RECLOSE SCHEME MP E-60.44 0 2'
  • FUNCTIONAL TEST - CIRCULATlHG WATER PUMP 22 AUTOMATIC RECLOSE SCHEME l MP E-61.1 3 1&2 **CAllBRATION OF THE MAIN GENERATOR VOLTAGE REGULATOR POWER SYSTEM STABILIZER SIGNAL
 )

P

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 5A ELECTRICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   ===============           === ==== ===========================================================

l MP E-61.2 1 1&2 ** TEST FOR STATOR C0ll WATER BLOCKAGE-l MP E-61.3A 0 1&2 ** MAIN GENERATOR STATOR C0lt LEAK RATE TEST l MP E-61.5B 0 1&2 *** MAIN GENERATOR EXCITER ELECTRICALTESTING ! MP E-61.BB 0 2 *** MAIN GENERATOR LOOP TEST MP E-61.9A 0 1&2 **lS0 LATED PHASE BUS & MOTOR OPERATED DISCONNECT l PREVENTATIVE MAINTENANCE i MP E-61.10A 0 1&2 ** MAIN GENERATOR CONDITION MONITOR AUT0-SAMPLER INSTRUCTIONS l MP E-61.108 1 1&2 ** MAIN GENERATOR CONDITION MONITOR CALIBRATION ) MP E-62.1A 14 1&2 **MAlhiENANCE OF 12KV MAGNE-BLAST.CIRCulT BREAKERS MP E-62.1D 4' 1&2 **MAGNE-BLAST CIRCUIT BREAKER PREVENTIVE MAINTENANCE (MINI) l MP E-62.2A 3 1&2 ** MAINTENANCE OF GENERAL ELECTRIC 12KV POWER-VAC CIRCUIT  ! BREAKERS , MP E-63.lA 15 1&2 ** MAINTENANCE OF 4KV MAGNE-BLAST CIRCUIT BREAKERS MP E-63.1C 6 162 **0VERHAUL OF 4KV AND-12KV MAGNA-BLAST CIRCUIT BREAKERS p MF E-63.3B 0 1&2 ** MAINTENANCE OF POTENTIAL TRANSFORMER CABINETS IN GENERAL , ELECTRIC METAL-CLAD 4KV AND 12KV SWITCHGEAR l MP E-63.3C 0 1&2 ** MAINTENANCE OF GENERAL-ELECTRIC METAL CLAD 4KV AND 12KV' SWITCHGEAR MP E-63.30 0 1&2 *** MICRO-OHM CHECK OF BUS CONNECTIONS FOR 4KV AND 12KV SWITCHGEAR ) MP E-64.lA 22 1&2 ***AC AND DC MOLDED CASE CIRCUIT BREAKER TEST PROCEDURE . l MP E-64.lB 3 1&2 *** MOLDED CASE CIRCUIT BREAKER EXERCISE l MP E-64.10 2 1&2 *PY PANEL MOLDED CASE circuli BREAKER EXERCISING MP E-64.4 9 1&2 ** MAINTENANCE OF FPE TYPE FPS 2 CIRCulT BREAKERS MP E-64.5A 1 1&2 ** MAINTENANCE OF ABB, ITE-TYPES K-3000(S) AND K-4000(S) CIRCUIT BREAKERS j MP E-64.6A 5 1&2 ** MAINTENANCE OF BBC, ITE-TYPES K-600 THRU K-2000 AND l K-6005 THRU K-20005 CIRCUIT BREAKERS MP E-65.lA 13 1&2 ** MAINTENANCE OF. WESTINGHOUSE 7.5KVA INVERTERS MP E-65.lB 2 1&2 *0VERHAUL OF WESTINGHOUSE 7.5 KVA INVERTERS MP E-65.2A 1 1&2 ***lNSPECTION AND CLEANING AND FUNCTIONAL TESTING.0F ! UNINTERRUPTIBLE POWER SUPPLY (UPS) FOR CHEMICAL LAB'AND j AMSAC 'l MP E-65.3A 0 1&2 *** MAINTENANCE OF SOLIDSTATE CONTROLS UPS POWER SUPPLY AND BATTERY PACKS FOR TECH SUPPORT CENTER MP E-65.4A 0 1&2 *** MAINTENANCE OF SOLIDSTATE CONTROLS UPS FOR THE PPC COMPUTER l MP E-65.5A 0 1&2 ** MAINTENANCE Of INVERTER' POWER SUPPLY FOR MAIN FEEDWATER j TURBINE SPEED CONTROL MP E-65.6A 0 1&2 *** MAINTENANCE OF SOLIDSTATE CONTROLS UPS' POWER SUPPLY AND BATTERY PACKS FOR DIGITAL FEEDWATER CONTROL. , MP E-65.7A 0 1&2 ** MAINTENANCE OF CONTROL ROOM EMERGENCY LIGHTING UNINTERRUPTIBLE POWER SUPPLY AND BATTERY PACKS MP E-65.EA 1 1&2 ***MAINTENAhCE OF CYBEREX INVERTER FOR THE P-2000 COMPUTER 2 l l

i 22 JUL 93 DIABLO CANYON POWER PLANT ' l UNITS 1 AND 2 VOLUME SA ELECTRICAL MAINTENANCE PROCEDURES

                                                                                            )

TABLE OF CONTENTS HUMBER REV UNIT TITLE

 =============== === ==== ===========================================================

l MF E-65.9A 1 1&2 ** MAINTENANCE OF SOLA UNINTERRUPTIBLE POWER SUPPLY FOR THE FIRE ALARM PANEL MP E-65.1CA 0 1&2 *** MAINTENANCE OF DOSIMETRY COMPUTER UNINTERRUPTIBLE POWER SUPPLY AND BATTERY PACKS l MF E-65.llA 0 1&2 *** MAINTENANCE OF SECONDARY CHEMISTRY SPS/R REGULATING l ' STANDBY POWER SOURCE MP E-65.12A 0 1&2 *** CLEAN AND INSPECTION OF SECURITY UNINTERRUPTIBLE POWER SUPPLY MF E-67.1 0 IL2 ** LOCATING DC GROUNDS WITH THE DC SCOUT BATTERY l DISTRIBUTION GROUND LOCATOR MF E-67.22 0 IL2 *** CALIBRATION OF NONVITAL- 125/250 VDC GROUND DETECTION SYSTEMS MP E-67.2C 0 IL2 **0PERATING INSTRUCTIONS FOR ALBER CELL +PLUS PORTABLE BATTERY TESTER MP E-67.2D 1 IL2 **0PERATING INSTRUCTIONS FOR ALBER BCT-1000 BATTERY CAPACITY TEST SYSTEM MF E-67.3A 18 162 ** ROUTINE PREVENTIVE MAINTENANCE OF STATION BATTERY CHARGERS MP E-67.3B 0 IL2 ** SIXTY-MONTH PREVENTIVE MAINTENANCE OF STATION BATTERY CHARGERS MP E-67.45 0 162 *** BALANCING SPECIFIC GRAVITY OF LEAD ACID CELLS. MP E-67.55 0 IL2 **MAINTEFANCE OF BATTERY PACK EMERGENCY LIGHTS OUTSIDE POWER BLOCK MP E-67.6 1 1&2 *** STATION BATTERY PREVENTIVE MAINTENANCE MP E-67.7 1 1&2 ** ROUTINE PREVENTIVE MAINTENANCE OF C&D BATTERY CHARGERS MP E-71.lA 7 IL2

  • HEAT T' ACE CABLE TESTING MP E-71.lB 11 1&2 **lNSTALLATION AND REPAIR OF THERMON ECONO TRACE HEATING CABLE MP E-71.lC 2 1&2 **SSK HEATING CABLE INSTALLATION AND REPAIR 4 MP E-71.2A 2 1&2 **CAllBRATION OF BORIC ACID TRACE MONITOR l MP E-71.3A 1 IL2 **lNSTALLATION AND REPAIR OF TYPE HG-P ECON 0 TRACE HEATING I CABLE MP E-72.1 2 1&2 *** WEEKLY CATHODIC PROTECTION SYSTEM MONITORING i MP E-72.2 1 1&2 ** MONTHLY CATHODlC PROTECTION SYSTEM MONITORINC l MP E-99.01 0 2 *MOV FLOW TEST - TO AFW FLOW CONTROL VALVES LCV-106, 107, 108, AND 109 MP E-99.02 4

0 2 *MOV FLOW TEST - TDAFW STEAM SUPPLY VALVES FCV-37, 38 AND 95 ! MP E-99.03 0 2

  • DIFFERENTIAL PRESSURE TESTING OF FCV-355 MP E-99.05 l 0 2 *MOV FLOW TEST - CCW CONTAINMENT ISO VALVES 2-FCV-356, 2-FCV-749, AND 2-FCV-363 l MP E-99.07 0 2 *MOV FLOW TEST - CVCS HEADER AND RECIRC VALVES 8105, 8106, l 8107 AND 810B '

MP E-99.08 1 2 *MOV FLOW TEST - RHR SYSTEM VALVES 8703, 8716A/B, AND 8809A/B 9

l 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 UOLUME SA ELECTRICAL MAINTENANCE' PROCEDURES  ; TABLE Of CONTENTS' [ NUMBER REV UNIT TITLE ,

    ......=........       ... .... ............................................................                     ,

MP E-99.10 0 2 *MOV FLOW TEST.-fSI INJECTION VALVES 8821A/B, 8835, AND 8802A/B MP E-101A 0 1&2 ** INFRARED THERM 0 GRAPHY INSPECTIONS MP E-102.A 1 1&2

  • ACOUSTIC LEAK DETECTION PROGRAM t

h i I l I t I

                                                                                                                  'i l

I 1 t

22 JUL 93 DIABLO CANYON POWER PLANT I UNITS 1 AND 2 I l VOLUME SB MECHANICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS I l NUMBER REV UNIT TITLE i

   ==..=.......... ..= ...= ...........................................................

MP M-2.1 3 1&2 ** CONDENSATE PUMP & MOTOR REMOVAL MP M-2.2 5 1&2

  • CONDENSATE POLISHING VESSEL WELLSCREEN AND RESIN TRAP' e CLEANING AND MAINTENANCE MP M-2.4 0 1&2 *** CONDENSATE PUMP MAINTENANCE MP M-3.2 7 1&2
  • STEAM GENERATOR AUXILIARY FEEDWATER PUMP MAINTENANCE (6 ,

AND 9 STAGE) MP M-3.3 4 1&2 **FEEDWATER PUMP TURBINE CYLINDER COVER AND ROTOR REMOVAL AND RElHSTALLATION MP M-3.4 3 1&? ** TURBINE DRIVEN AUXILIARY FEEDWATER PUMP & TURBINE REMOVAL ) MP M-3.5 3 1&2 *M010R DRIVEN AUXILIARY FEEDWATER PUMP & MOTOR REMOVAL MP M-3.7 2 1&2 *** TERRY TURBlNE THROTTLE TRIP VALVE (FCV-152) DISASSEMBLY AND REASSEMBLY MP M-3.9 1 1&2 ***FEEDWATEP REGULATING VALVE MAINTENANCE l MP M-4.1 4 1&2 **HIGH PRESSURE OR LOW PRESSURE TURBINE ROTOR REMOVALAND REINSTALLAT10N MP M-4.2 3 1&2 **HIGH PRESSURE OR LOW PRESSURE TURBINE; BLADE RING REMOVAL AND REINSTALLATION MP M-4.3 3 1&2 ** TURBINE BEARING COVER REMOVAL AND REINSTALLATION MP M-4.4 3 1&2 **HIGH PRESSURE TURBINE OUTER COVER REMOVAL AND REINSTALLATION ! MP M-4.5 3 1&2 ** LOW PRESSURE TURBINE OUTER COVER AND CYLINDER COVERS 1 ) AND 2 REMOVAL REINSTALLATION l MF M-4.6 3 162 ** LOW PRESSURE TURBINE CROSS 0VER TEE REMOVAL AND REINSTALLATION MP M-4.7 3 1&2 ** MAIN STEAM REHEATER HIGH PRESSURE AND LOW PRESSURE TUBE BUNDLE REMOVAt AND REINSTALLATION MP M-4.9 7 1&2 ** STEAM GENERATOR SAFETY VALVE LIFT POINT SETTING USING ' ) STEAM MP M-4.10 13 1&2 *** STEAM GENERATOR SVr ETY VALVE RECONDITIONING ~ 1 MP M-4.11 4 1&2 ** MAIN STEAM SAFETY VALVE SETTING WITH HYDRAULIC ASSIST  ! MP M-4.12 0 1&2 **lNSTALLATION & REMOVAL OF TEMPORARY CROSS-0VER PIPE- 1 l SUPPORTS MP M-4.13 1 1&2 ** VISUAL INSPECTION OF STEAM GENERATOR TUBESHEET SECONDARY ) SIDE

MP M-4.13A 0 1&2 ** STEAM GENERATOR PRIMARY & SECONDARY MANWAY & HANDH0LE.

BOLT HOLE REPAIR MP M-4.14 0 1&2 ** AUXILIARY FEEDWATER PUMP TURBINE MAINTENANCE MP M-4.16 1 1&2

  • STEAM.GENERATOP SAFETY VALVE MANUAL LIFTING & GAGGING MP M-4.18 8 1&2 ***VERIFICAT10N OF LIFT POINT USING FURMANITE'S TREVITEST 1 EQUIPMENT FOR THE MAIN STEAM SAFETY VALVES MP M-4.19 3 1&2 **HP TURBINE CONTROL VALVE MAINTENANCE MP M-4.20 2 1&? **HP TURBINE STOP VALVE MAINTENANCE. .

MP M-4.21 .l 1 1&2 **lNTERCEPT0R AND REHEAT STOP VALVE MAINTENANCE l MP M-4.25 4 1&2 **AuxlLIARY FEEDWATER PUMP TURBINE GOVERNOR MAINTENANCE 1 )

V 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SB MECHANICAL MAINTENANCE PROCEDURES  ! TABLE OF CONTENTS ) NUMBER REV UNIT TITLE

   =============== === ==== ===========================================================

MP M-4.26 0 1&2 *** MAIN STEAM SAFETY VALVE SETPOINT ESTABLISHMENT USING FURMANITE'S TREVITEST ON A TEST STAND ) MP M-6.1 1 1&2 ** BUILDING HEATING REBOILER TUBE BUNDLE & CASING HANDLING MP M-7.2 22 1&2 **lNSTALL REACTOR CLOSURE HEAD MP M-7.3 15 1&2 *** REACTOR VESSEL CLOSURE HEAD REMOVAL MP M-7.4 8 1&2 *** REACTOR HEAD 0-RING REMOVAL AND REPLACEMENT MP M-7.5 13 1&2 ** CORE EXIT THERMOCOUPLE N0ZZLE ASSEMBLY (CETNA) OPENING AND CLOSURE ) MP M-7.6L 3 1&2 ** REACTOR VF55tt [lPPER INTERNALS REMOVAL MP M-7.68 4 1&2 ** REACTOR VESSEL UPPER INTERNALS INSTALLATION MP M-7.7A 1 1&2 ***REACTrR VESSEL LOWER INTERNALS REMOVAL MP M-7.78 1 1&2 ***REAC10R VESSEL LOWER INTERNALS INSTALLATION MP M-7.10 6 1&2 **lNSTALLATION & TESilNG OF THE CAVITY SEALS MF M-7.11 4 1&2 ** CONTROL ROD DRItE MOTOR COOLING FAN HANDLING MP M-7.13 16 1&2 *** FULL LENGTH RC'A DRIVE SHAFT UNCOUPLING AND RECOUPLING MP M-7.17 5 1&2 **DISASSEMBL), itSPECTION, ASSEMBLY & INSTALLATION OF REACTOR C00LAN: PUMPS MP M-7.19 2 1&2 ** REPLACEMENT OF PRESSURIZER IMMERSION HEATERS MP M-7.20 5 1&2 ** REMOVAL & REASSEMBLY OF PRESSURIZER MANWAY COVER , MP M-7.22 14 1&2 *** PRESSURIZER SAFETY VALVE RECONDITIONING ) MP M-7.23 3 1&2 ** PRESSURIZER SAFETY VALVE LIFT P0lNT SETTING USING AIR SET PRESSURE DEVICE MP M-7.25 15 1&2 ** REMOVAL & INSTALLATION OF STEAM GENERATOR SECONDARY MANWAY AND HANDHOLE COVERS MP M-7.27 2 1&2

  • MOTOR GENERATOR SET MOTOR & GENERATOR HANDLING MP M-7.25 3 1&2 ** HANDLING REACTOR HEAD STUDS & NUTS WITH LIFTING BASKET j MP M-7.29 MP M-7.30 2 1&2 ** REACTOR COOLANT PUMP HATCH COVER HANDLING 1 1&2 ** REACTOR COOLANT PUMP HANDLING MP M-7.31 5 1&2 ** REACTOR COOLANT PUMP (RCP) MOTOR AND MOTOR STATOR HANDLING MP M-7.32 12 1&2 *"INCORE INSTRUMENl ATION SEAL TABLE PREPARATION l MP M-7.33 7 1&2 ** REACTOR COOLANT PUMP FLYWHEEL REMOVAL & REINSTALLATION j MP M-7.36 13 162 ***PRESSUR12ER SAFETY VALVE LIFT POINT SETTING USING STEAM i MP M-7.37 4 162 ** SERVICE READINESS AND PERIODIC INSPECTION OF THE REACTOR  !

t VESSEL HEAD AND INTERNALS LIFTING DEVICES j ! MP M-7.38 0 1&2 **THE CLEANING OF INCORE FLUX THIMBLES j MP M-7.39 1 1&2 ** MECHANICAL CLEANING OF REACTOR CLOSURE HEAD STUD HOLES I MP M-7.40 1 1&2 **lNSTALL/ REMOVE REACTOR VESSEL STUD HOLE PLUGS MP M-7.41 2 1&2 *** REMOVAL & INSTALLATION OF REACTOR COOLANT PUMP COUPLING ) MP M-7.42 3 1&2 *** REACTOR COOLANT MOTOR-TO-PUMP ALIGNMENT MP M-7.43 6 1&2 *** REMOVAL, INSPECTION & INSTALLATION OF MECHANICAL SEAL-REACTOR C00LANTPUMP (MOTOR IN PLACE)  ; MP M-7.44 1 1&2 ** STEAM GENERATOR PRIMARY MANWAY COVER REMOVAL & INSTALLATION

 )

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SB MECHANICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE f MF M-7.45 0 1&2 ** VERIFICATION OF LIFT POINT USING FURMANITE'S TREVITEST EQUIPMENT FOR THE PRESSURIZER' RELIEF VALVES MP M-7.46 4 1&2 ** REACTOR COOLANT PUMP MOTOR INSPECTION & MAINTENANCE MP M-7.47 1 1&2

  • CLEANING REACTOR HEAD STUDS MF M-7.48 1 1&2 **CRDM SEAL CLAMP INSTALLATION MP M-7.49 0 1&2 ** CLEANING OF INCORE FLUX THIMBLES, APEX METHOD MP M-7.50 0 1
  • REACTOR HEAD VENT TRAIN 1 AND 2 VALVE SEAT LEAKAGE TEST EACH REFUELING CYCLE MP M-7.50 0 2
  • REACTOR HEAD VENT TRAIN 1 AND 2 VALVE SEAT LEAKAGE

) MP M-7.53 0 1&2 ** REACTOR COOLANT PUMP MOTOR TEN (10) YEAR INSPECTION PROCEDURE MP M-8.1 4 1&2 ** BORIC ACID TRANSFER PUMP REMOVAL, REPAIR & INSTALLATION MP M-8.2 6 1&2 ** CENTRIFUGAL CHARGE PUMP (CCP) REMOVAL, REPAIR AND REASSEMBLY Q MP M-8.3 2 1&2 ** GAS STRIPPER FEED PUMP REMOVAL REPAIR & INSTALLATION f MP M-8.4 6 1&2 **RECIPROCATNG CHARGE. PUMP MAINTENANCE MP M-8,5 1 1&2 ** LIQUID HOLDUP TANK RECIRCULATION PUMP REMOVAL REPAIR.& INSTALLATION MP M-8.6A 4 1&2 ** FILTER ELEMENT REPLACEMENT FOR REACTOR COOLANT LETOOWN 1-1, AND 2-1 AND SEALWATER RETURN MP M-8.68 2 1&2 ** FILTER ELEMENT REPLACEMENT'FOR SEALWATER lhJECTION FILTERS MP M-8.6C 2 1&2 ** FILTER ELEMENT REPLACEMENT FOR REACTOR COOLANT LETDOWN FILTERS 1-2 AND2-2 MP M-8.6D 1 1&2 ** FILTER ELEMENT REPLACEMENT FOR BORIC ACID EVAPORATOR i CONCENTRATES AND ION EXCHANGE FILTER MP M-8.6E 2 1&2 *** FILTER ELEMENT REPLACEMENT FOR THE BORIC ACID EVAPORATOR , CONDENSATE FILTER MP M-8.6F 1 1&2 *** FILTER ELEMENT REPLACEMENT FOR THE BORIC ACID FILTER MP M-8.7 2 1&2 **LET-DOWN & SEAL WATER HEAT EXCHANGER HANDLING MP M-8.8 0 1&2 ** CENTRIFUGAL CHARGING PUMP HANDLING , MP M-9.1 7 162 ** SAFETY INJECTION PUMP MAINTENANCE I MP M-9.2 5 1&2 ** SAFETY INJECTION PUMP & MOTOR HANDLING. MP M-9.3 1 1&2 ** SAFETY INJEC110N PUMP INTERNAL ) MP M-10.1 9 1&2 ** RESIDUAL HEAT REMOVAL PUMP MAINTENANCE l MP M-10.2 4 1&2 ** RESIDUAL HEAT REMOVAL PUMP MOTOR & IMPELLER HANDL]NG MP M-10.3 3 1&? ** RESIDUAL HEAT REMOVAL HEAT EXCHANGER SHELL & TUBES , HANDLlHG l MP M-12.1 1 1&2 ** CONTAINMENT SPRAY-PUMP '. MP M-13.2 8 1&2 *** FILTER ELEMENT REPLACEMENT FOR REFUELING WATER-PURIFICATION FILTERS

j. MP M-13.4 2 1&2 *** FILTER ELEMENT REPLACEMENT FOR SPENT FUEL PIT. AND SPENT FUEL PIT SKIMMER MP M-13.5 2 1&2 ** FILTER ELEMENT REPLACEMENT FOR SPENT FUEL PIT RESIN. TRAP L

) i

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SB MECHANICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   ..==...........     =. .... ..=....................................................====

MP M-13.6 0 1&2 ** SPENT FUEL POOL PUMPS 1-2 & 2-2 (HAYWARD TYLER) DISASSEMBLY, REPAIR & REASSEMBLY MP M-14.1 2 1&2

  • COMPONENT COOLING WATER PUMP DISASSEMBLY REPAIR &

REASSEMBLY MP M-14.2 3 1&2 ** COMPONENT COOLING WATER PUMPS MOTOR & PUMP HANDLING MP M-14.3 4 1&2 ** COMPONENT COOLING WATER (CCW) HEAT EXCHANGER HEAD, CHANNEL BARREL AND TUBE BUNDLE HANDLING MP M-14.4 0 1&2 ** REACTOR COOLANT PUMP MOTOR ~0ll HEAT EXCHANGER FLUSHING PROCEDURE . j MP M-16.1 4 1&2 ** MAKEUP WATER TRANSFER PUMP DISASSEMBLY REPAIR & REASSEMBLY. MP M-17.1 3 1&2 ** SCREEN WASH PUMP MOTOR & PUMP REMOVAL-MP M-17.2 4 1&2 ** AUXILIARY SALI WATER PUMP & MOTOR REMOVAL & REINSTALLATION. MP M-17.3 5 1&2 ** CIRCULATING WATER PUMP ROTOR, SHAFT, IMPELLER, STATOR, AND HATCH COVERREMOVAL j MP M-17.4 3 1&2 ** CIRCULATING WATER DISCHARGE VALVE HANDLING h / MP M-17.5 3 1&2 **lNTAKE BAR RACK REMOVAL AND REINSTALLATION

  • MP M-17.6 3 1&2 ** TRAVELING WATER SCREEN REMOVAL MP M-17.7 3 1&2 **CIRCULAT]NG WATER SCREEN GATE & AUXILIARY SALT WATER PUMP SCREEN AND GATE REMOVAL AND REINSTALLATION MP M-17.8 3 1&2 " AUXILIARY SALT WATER (ASW) PUMP INTAKE BAY GATE REMOVAL AND REINSTALLATION j MP M-17.9 6 1&2 ** AUXILIARY SAll WATER PUMP MAINTENANCE -

MP M-17.ll 3 1&2 ** CIRCULATING WATER PUMP MAINTENANCE ~ l MP M-17.12 1 1&2 *** HEAT TREATMENT OF MISCELLANE0US SEAWATER PIPING MP M-18.1 5 1&2 ** FIRE PUMP DISASSEMBLY, REPAIR AND REASSEMBLY  ; MP M-18.2 7 1&2

  • TAGGING, CHARGING, INSPECTION & HYDROSTATIC TESTING OF l

PORTABLE FIRE EXTINGUISHERS i ) MP M-18.6 3 1&2 ** SEMI-ANNUAL PREVENTIVE. MAINTENANCE ON PERMANENTLY j INSTALLED CO2 CYLINDERS FOR THE CIRCULATING WATER PUMP i MOTORS (WPSI) MP M-19.1 2 1&2 ** REACTOR COOLANT DPAIN. TANK PUMP DISASSEMBLY AND REASSEMBLY MP M-19.2 1 1&2 ** EQUIPMENT DRAIN RECElVER PUMP DISASSEMBLY REPAIR & REASSEMBL) / j MP M-19.3 6 1&2

  • FUEL TRANSFER BLANK FLANGE REMOVAL & INSTALLATION MP M-19.4 1 1&2 ** FILTER ELEMENT REPLACEMENT FOR SPENT RESIN TRANSFER FILTERS 0-1 AND 0-2 l

MP M-20.1 1 1&2 ** PREPARATION FOR MAIN TURBlNE LUBE DIL FLUSH MP M-21.1 4 1&2 ** DIESEL FUEL Olt TRANSFER PUMP MAINTENANCE MP M-21.2 2 1&2

  • DIESEL ENGINE GENERATOR AIR COMPRESSOR' MAINTENANCE
 ) MP M-21.5A            0 1&2    ** DIESEL ENGINE WATER PUMP MAINTENANCE .                       I MP M-21.58            0 1&2    ** DIESEL ENGINE WATER PUMP MODEL 22500168-1 MAINTENANCE MP M-21.6             2 1&2    ** DIESEL ENGINE TURBOCHARGER MAINTENANCE-MP M-21.7A            0 1&2    *** DIESEL ENGINE FUEL OIL BOOSTER PUMP MP M-21.78            0 1&2    ** DIESEL ENGINE 2-3 FUEL Oil BOOSTER PUMP
 )

22 JUL 93 DIABLO CANYON POWER PLANT I UNITS 1 AND 2 VOLUME 5B MECHANICAL MAINTENANCE PROCEDURES 3 TABLE OF CONTENTS NUMBER REV UNIT TITLE

 ======..=====.. === ==.. = = = = = . . . = = = = = = = . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . = = = = = =

MP M-21.8 10 1&2 ** DIESEL ENGINE GOVERNOR ACTUATOR MP M-21.9 1 1&2 ** DIESEL ENGINE LUBE OIL PUMP MP M-21.9B 0 1&2 **DEG 2-3 LUBE Olt PUMP-MP M-21.10 3 1&2 ** DIESEL ENGINE PRE-LUBE OIL PUMP MAINTENANCE MP M-21.11 1 1&2 ** DIESEL ENGINE FUEL INJECTION PUMP MAINTENANCE MP M-21.12 3 1&2 ** DIESEL ENGINE CYLINDER HEAD MP M-21.13 3 1&2 ** DIESEL ENGINE RADIATOR MP M-21.14 1 1&2

  • CLEANING INSPECTION & TESTING OF DIESEL OIL STORAGE TANK MP M-21.15 0 1&2 ** DIESEL GENERATORS HEAVY LOAD COMPONENTS REMOVAL MP M-21.16 2 1&2 *** DIESEL ENGINE CAMSHAFT MP M-21.17 2 1&2 *** DIESEL ENGINE TURNING ARRANGEMENT MP M-21.19 3 1&2 ** DIESEL ENGINE GOVERNOR CONTROL LINKAGE MP M-Pl.20 2 1&2 ** DIESEL ENGINE RADIATOR FAN DRIVE MP M-21.21 2 IL2 ** DIESEL ENGINE RADIATOR COOLING FAN DRIVE RIGHT ANGLE GEAR BOX h MP M-21.22 1 IL2 ** DIESEL ENGINE OVERSPEED TRIP MECHAN]SM MP M-21.23 3 1&2 ** DIESEL ENGINE FUEL PUMP CONTROL SHAFT AND CROSS 0VER LINKAGE MP M-21.24 6 1&2 *** DIESEL ENGINE AER00 VIP HOSE MAINTENANCE 3

MP M-21.25 0 1&2 ** REBUILDING DIESEL STARTING AIR MOTORS MP M-21.25B 0 1&2

  • EXTERNAL VISUAL MAINTENANCE INSPECTION AND/OR REPLACEMENT

) 0F DEG 2-3 STARTING AIR MOTOR MP M-21.27 3 1&2 *** DIESEL GENERATOR ROTOR NEMOVAL AND INSTALLATION MP M-21.28 1 1&2 *" DIESEL GENERATOR CRANKSHAFT DEFLECTION MP M-21.29 0 1&2 **lNJECTOR N0ZZLE/ HOLDER AND HIGH PRESSURE FUEL LINE MAINTENANCE l Mi M-21.30E 1 1&2 **DEG 2-3 POWER ASSEMBLY INSPECTION ) MP M-21.31 1 1&2 ** MAIN BEARING INSPECTION. MP M-21.32 0 1&2 *** DIESEL ENGINE VALVE ADJUSTMENT- I MF M-22.1 3 1&2 ** GENERATOR ROTOR HANDLING I MP M-22.2 2 1&2 ** EXCITER HOUSING HANDLING MP M-22.3 3 1&2 ** EXCITER HANDLING MP M-23.1 1 1&2 *HEPA FILTER REPLACEMENT h MP M-23.2 3 1&2 ** CONTAINMENT FAN COOLER MOTOR HANDLING i idP M-23.3 3 1&2 *** AIR PARTICULATE DETECTOR PUMP MAINTENANCE i Mb M-23.4 10. It? ** PREVENTIVE MAINTENANCE OF PLANT VENTILATION FANS, I ASSOCIATED DAMPERS AND FILTERS MP M-23.5 1 1&2 **0UTAGE MODiflCATION FOR CONTAINMENT PENETRATION 63 MP M-23.7 1 1&2

  • BUTTERFLY DAMPERS MAINTENANCE, INSPECTION AND SEAT

) REPLACEMENT l MP M-23.8 0 1&2 *** PREVENTIVE MAINTENANCE OF CONTAINMENT FAN COOLERS AND'-  ; ASSOClATED COMPONENTS-MP M-23.9 1 1&2 ***0UTAGE MODIFICATION FOR CONTAINMENT PENETRATIONS 58 AND

60 <

b k i

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SB MECHANICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS-NUMBER REV UNIT TITLE

 =============== === ==== ===========================================================

MP M-23.10 1 1&2 ***0UTAGE MOD. FOR CONTAINMENT PENETRATION 63 (USING REDUCER / ISOLA 110N COVER) MP M-42.1 5 1&2 *** FUEL TRANSFER SYSTEM INSPECTION & PREVENTIVE MAINTENANCE MP M-45.1 6 1&2 *** CONTAINMENT EQUIPMENT HATCH D00R'0PENING & CLOSING MP M-50.1 1 .1&2 ** RIGGING AND H0ISTING EQUIPMENT INSPECTION AND MAINTENANCE MP M-50.2 3 IL2. **P&H MOBILE CRANE HANDLING ' MP M-50.3 8 1&2 ***0VERHEAD, GANTRY & MOBILE CRANE INSPECTION, TESTING & MAINTENANCE MP M-50.4 4 1&2 ** FUEL HANDLING BUILDING (FHB) CRANE OPERATION AND MOVEABLE WALL RELOCA110N MP M-50.5 1 152

  • HANDLING NEW FUEL IN SHIPPING' CONTAINERS MP M-50.7 5 1&2 **lNSTALLING & REMOVING THE REACTOR VESSEL HEAD LIFTING DEVICE MP M-50.8 4 IL2 **lNSTALLATION AND REMOVAL OF THE REACTOR VESSEL UPPER AND LOWER INTERNALS' LIFTING DEVICE MP M-50.9 9 162 ** MISSILE SHIELD HANDLING MP M-50.10 2 IL2 ** FUEL SHIPPING CASK HANDLING MP M-50.11 6 IL2 ** SPENT FILTER 1RANSFER CASK 0-1 HANDLING MP M-50.13 0 1&2 ** PREVENTIVE MAINTENANCE ON THE CONTAINMENT DOME SERVICE CRANE HF M-50.14 0 IL2 ** POLAR CRANE SEISMIC GUIDE STRUT ADJJSTMENT MP M-50.lE 0 IL2 *SPECIAL. SERVICE HOISTS, J1B CRANES AND MONRAILS INSPECTION MP M-50.17 1 IL2 ** REFUELING CAVITY STAIRCASE HANDLING MP M-50.19 1 IL2
  • REACTOR VESSEL TEMPORARY COVER HANDLING MP M-50.20 9 IL2 *** LOADING PRE-LOADED LINERS INTO THE NUPAC MODEL 14/210 RADWASTE SHIPPING CASK MP M-5D.21 8 IL2 *** LOADING DRUMS INTO THE NUPAC H0 DEL 14/210 RADWASTE SHIPPING CASK MP M-50.22 7 1&? *** PROCESSING WASlE IN THE 10-142 RADWASTE SHIPPING CASK i MP M-50.23 6 162 *** LOADING PRL-l0ADED LINERS INTO THE NUPAC 10-142 RADWASTE  ;

SHIPPING CASK i MP M-50.24 1 1&2 *** SPENT FILTER TRANSFER CASK'0-4 HANDLING  ! MP M-50.25 0 IL2 *** SPENT FlLTER TRANSFER CASK 0-3 HANDLING ) MP M-50.26 1 1&2 *** SPENT' FILTER TRANSFER CASK 0-5 HANDLING 1 MP M-50.27 0 It? *** SPENT-FILTER TRANSFER CASK 0-2 HANDLING FOR CONTAINMENT. SERVICE MP M-51.1 3 lt?

  • PACKING VALVES USING BRAIDED TYPE PACKING MP M-51.2 5 IL2
  • SITE FABRICATION OF PRE-FORMED GRAPHITE PACKING RINGS-MP M-51.3 5 IL2
  • PACKING VALVES IN PLACE USING GRAPHITE TAPE.

) MP M-51.4 4 1&2 ** REPAIR OF ROCKWELL-EDWARD VALVES WITH SEAL-WELDED BONNETS. MP M-51.5 12 1&2 ***SETPOINT CAL]BRATION OF SAFETY RELIEF VALVES MP M-51.6 4 1&2

  • VALVE EXTERNAL INSPECTIONS AND MAINTENANCE -1 MP M-51.7 10 1&2 ***lTT GRINNELL DIAPHRAGM VALVE MAINTENANCE l

)

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SB HECHANICAL MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

 ..==......===== ... ...= ........................................................===

MP M-51.10 6 1&2 ***lNSTALLATION & ADJUSTMENT OF T-RING ON RCV-11 & 12 AND FCV-660 & 661 MP M-51.11 3 1&2 ***CONTR0MATIC PNEUMATIC SPRING RETURN ACTUATOR MAINTENANCE MP M-51.12 2 1&2 **CONTROMATICS BALL VALVES MP M-51.14 4 1&2

  • GENERIC CHECK VALVE INSPECTION MP M-51.15 1 1&2 **VELAN SWING CHECK VALVE DISASSEMBLY INSPECTION &

REASSEMBLY Mi M-51.21 4 1&2 **10% ATMOSPHERIC STEAM DUMP VALVE MAINTENANCE Mi M-51.22 9 1&2 *** VALVE PACKING USING PRE-FORMED GRAPHITE WITH BRAIDED END RINGS Mi M-51.23 1 l&2 *** VALVE PACKING USING PRE-FORMED GRAPHITE WITH COMPOSITE END RINGS MP M-51.24 1 1&2 **lN PLACE SET POINT CAllBRATION FOR RELIEF VALVES MP r.-51.26 2 1&2

  • LUBE OIL AND FUEL OlL RECIRCULATION VALVE INSPECTION AND 1

ADJUSTMENT MP M-51.28 2 1&2 ** DIAPHRAGM REPLACEMENT FOR MASONEILAN ACTUATORS SIZES 9,11,13,15,18 & 24 MP M-51.29 0 1&2 ** CRANE (CHAPMAN) TILTING DISC CHECK VALVE ASSEMBLY MP M-51.30 0 1&2 ** FISHER VALVE MANUAL OPERATOR INSTALLATION AND SETUP MP M-51.32 2 1&2 ***ATWOOD & MORRILL SWlNG DISC CHECK VALVE MAINTENANCE MP M-51.33 0 1&2

  • CROSBY N0ZZLE PELIEF VALVE MAINTENANCE MP M-51.34 1 1&2 **35% AND 40X STEAM DUMP VALVE MAINTENANCE MP M-51.35 0 1&2 **lNTERNAL MEASUREMENT OF WEDGE GATE VALVES MP M-52.1 1 1&2 ** MECHANICAL SEAL REMOVAL & INSTALLATION (BORG-WARNER)

MP M-52.2 4 1&2 ** MECHANICAL SEAL REMOVAL & INSTALLATION (CRANE) MP M-54.1 6 1&2 ** BOLT TORQUING MP M-54.3 4 1&2 *** FREEZE SEALING OF PIPING MP M-54.4 12 1&2 ** SPIRAL WOUND GASKET REPLACEMENT GUIDE MP M-55.1 11 1&2 ** HANDLING / TESTING / REPAIR / MAINTENANCE OF GRINNELL HYDRAULIC SNUBBERS MF M-55.2 9 1&2 *** HANDLING / TESTING / MAINTENANCE OF PAUL-MUNROE SNUBBERS MP M-55.3 8 1&2 ** HANDLING / TESTING / REPAIR / MAINTENANCE OF PSA SNUBBERS MP M-55.4 6 1&2 ** HANDLING / TESTING /REPAlR/ MAINTENANCE OF ANCHOR /0ARLING SNUBBERS MP M-55.5 5 1&2 ** FABRICATION, INSTALLATION, AND MODIFICATION OF PIPE SUPPORTS MP M-56.1 9 1&2

  • SYSTEM PRESSUPt TEST MP M-56.2A 0 1 ** INSTALL / REMOVE CONDENSATE /FEEDWATER SYSTEM DRY LAY-UP l MP M-56.2B 1 2 ***lNSTALL/ REMOVE CONDENSATE /FEEDWATER SYSTEM DRY LAY-UP f MP M-56.4 0 1&2
  • MANUFACTURE OF BEAR]NGS BUSHING & SLEEVES FROM SYNTHETIC l MATERIALS I MP M-56.6 9 1&2 *** PERSONNEL HATCH PREVENTIVE MAINTENANCE l MP M-56.7 4 1&2 ** LUBRICANT SAMPLING, TESTING, AND ANALYSIS l

l ?

22 JUL'93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SB MECHANICAL-MAINTENANCE PROCEDURES-TABLE OF CONTENTS NUMBER REV UNIT TITLE

      ...===......=.. . . . - .... ...........................................................

MP M-56.B 0 1&2 ** PREVENTIVE MAINTENANCE FOR CONTAINMENT EMERGENCY PERSONNEL HATCH MP M-56.9 3 1&2

  • CONTROL OF TEMPORARY ON-LINE LEAK SEALING USING VENDORS- 0R CONTRACTORS MP M-56.10 4 1&2 *** PIPING FABRICATION, INSTALLATION, REPAIR,10R SYSTEM ALTERATION MP M-56.11 0 1&2 *000R MAINTENANCE' MP M-56.13 2 1&2 **0RIFICE: FABRICATION & INSTALLATION.

MP M-56.15 4 1&2 *lNTERNAL VALVE CLEANLINESS / LAPPING-MP M-56.16 1 1&2

  • HEAT EXCHANGER TUBE CLEANING MP M-56.17 0 1&2 **BUNA-N 0-RING FABRICATION-MP M-56.18 2 1&2 **EQUOTIP HARONESS TESTING OF STEELS & STAINLESS STEELS MP M-56.19 0 1&2 ** SHAFT / COUPLING ALIGNMENT FOR. ROTATING' EQUIPMENT MP M-56.21 1 1&2- **C.U.T WATER HEAT EXCHANGER TUBE AND TUBE. SHEET PLUGGING MP M-5B 0 1&2 *L..Jf L Olt. TRANSFER FILTER ELEMENT REPLACEMENT MP M-59 0 1&2
  • DIESEL LUBRICATING Olt FILTER ELEMENT REPLACEMENT -

MP M-83 1 102 ** WASTE GAS COMPRESSOR DISASSEMBLY-REPAIR &' REASSEMBLY 9

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 I VOLUME SC ILC MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNil- TITLE

    ..===-==...== . ... ==.. = = = . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . = . . . . . . . =

J MP I-1.1-1 2 1&2 *SSPS DEMULTIPLEXER SYSTEM VERIFICATION _

                                                                                                                                                   )

MP l-1,1-2 1 1&2 ** AMP TERMIP0 INT' CLIP VISUAL INSPECTION AND PULL TESTING- i MP l-1.1-3 0 1&2 *SSPS MULTIPLEXER-TEST SWITCH POST MODIFICATION / MAINTENANCE TEST MP I-1.2-1 9 1&2- *CAllBRATION OF THE WIDE RANGE NUCLEAR INSTRUMENTATION MONITORS NE-51 AND NE-52 MP l-1.3-4 4 1&2 *CAllBRATION OF THE SPING-3A MICROPROCESSOR CONTROLLED-CONTINUOUS AIR MONITOR MP l-1.3-6 0 1&2 ** CALIBRATION OF ND66 MULTICHANNEL ANALY2ER USED TO CHECK DISCRIMINATOR BIAS DRIFT IN RMS CHANNEL MP l-1.3-8 2 IL2 ** SETUP CANBERRA MULTICHANNEL ANALYZER MODEL SE20 TO CHECK DISCRIMINATORBIAS FOR RMS CHANNEL MP l-1.3-10 1 1&2 . *CALIBRATION OF THE GROSS FAILED FUEL DETECTOR MP l-1.4-1A 2 1&2 *(OTSC 6/16/93-PATTERSON)HAGAN SIGNAL SUMMATOR ACCEPTANCE; , TEST PROCEDURE MP I-1.4-1B 1 1&2 *HAGAN SIGNAL SUMMATOR HIGH SIGNAL SELECT ACCEPTANCE ~ TEST-PROCEDURE MF 1-1.4-2A 1 1&2 ** DYNAMIC TESTING OF HAGAN LEAD-LAG MODULES. MP l-1.4-2E 3 1&2 *HAGAN LEAD / LAG AND DERIVATIVE AMPLiflER ACCEPTANCE TEST-PROCEDURE MP I-1.4-3A 0 1&2 *HAGAN SIGNAL ISOLATOR ACCEPTANCE TEST PROCEDURE' MP.1-1.4-4A 4 1&? *HAGAN ALARM & SIGNAL COMPARATOR ACCEPTANCE' TEST: PROCEDURE-MF 1-1.4-5A 0 1&L **HAGAN FUNCTION GENERATOR ACCEPTANCE TEST PROCEDURE MP l-1.4-6A 0 1&2- *HAGAN REMOTE / MANUAL' SETPOINT STATION ACCEPTANCE TEST PROCEDURE Mi 1-1.4-7A 0 1&2 *HAGAN MV/1 ACCEPTANCE TEST PROCEDURE-

)

MP l-1.4-8A 3 1&2 **(OTSC 6/16/93--PATTERSON)-HAGAN MULTIPLIER / DIVIDER ACCEPTANCE TEST-MP l-l.4-9A 5 1&2 *HAGAN MANUAL / AUTOMATIC CONTROLLER SYSTEM MP l-1.4-10A 1 1&2 *HAGAN LOOP POWER' SUPPLY ACCEPTANCE TEST PROCEDURE , MP l-1.4-11A 0 1&2 *HAGAN OPTIMAC ELECTRONIC RECORDER ACCEPTANCE TEST PROCEDURE t MP l-1.4-12A 0 1&2 ** REMOVAL AND INSTALLATION OF INSTRUMENT PANEL SEISMIC BRACING

 )

MP l-1.5-1 1 1&2 ** SET MAIN ANNUNCIATOR TIME AND DATE MP l-1.5-2 0 1&2 *ENERG121NG AND DE-ENERGlZING THE. VISUAL ANNUNCIATOR. MP l-1.5-3 0 1&2 *ENERG121NG & DEENERG121NG THE OPERATIONS RECORDER MP l-1.5-4 0 1&2 ** REMOVE & REPLACE PRINTED CIRCulT CARD (S) IN THE MAIN

                                            ' ANNUNCIATOR DURING OPERATION MF 1-1.5-5         0 1&2            **lSOLATION OF A GROUNDED INPUT IN THE MAIN ANNUNCIATOR

( MP l-1.5-6 2 1&2 ** FUNCTIONAL TEST OF.A MOMENTARY ALARM FOR REFLASHER i SEQUENCE - (AN-154C) PRINTED CIRCUlT CARD (MAIN ANNUNCIATOR) MP l-1.5-7 0 1&2

  • PROCEDURE FOR WRITING ONTO DRUM OF MAIN ANNUNCIATOR' MP 1 1.5-8 0 1&2
  • MAIN ANNUNCIATOR VERIFICATION
 )
 )

22 JUL 93 DIABLO CANYON POWER PLANT' i UNITS 1 AND 2 i VOLUME SC I&C MAINTENANCE PROCEDURES TABLE OF CONTENTS 1 NUMBER REV UNIT TITLE  ;

 ===============     === ==== = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = . . . . = . . . . . . . = = = = = = = =

MP l-1.6-1 0 1&2

  • LOGIC TEST OF DIGITAL R00' POSITION INDICATION SYSTEM MP l-1.6-2 0 1&2
  • PROCEDURE FULL LENGTH R0D CONTROL MECHANISM C0ll RESISTANCE' CHECKS MP l-1.6-3 1 1
  • ROD CONTROL POWER SUPPLY CALIBRATION AND ALARM-VERIF] CATION' MP l-1,6-3 0 2
  • ROD CONTROL POWEP SUPPLY CALIBRATION'AND ALARM VERIFICATION MP I-1.8-6 0 1&2 ** CHANGING OIL FROM THE GEAR BOX OF INCORE DETECTOR DRIVE MECHANISM MP 1-1.8-7 0 1&2 *** MOVABLE INCORE DETECTOR SYSTEM ROTARY TRANSFER DEVICE MAINTENANCE MF 1-1.10-1 4 1&2 *DRPl-DETECTOR / ENCODER CARD CHECKS MP l-1.10-2 1 1&2 *DRPI - Coll STACK AND CABLING CHECK MP l-1.13-1 1 1&2 *P-2000 COMPUTER D.E.H. SYSTEM PROGRAMS LOADING PROCEDURE MF 1-1.13-2 0 1&2 *P-2000 COMPUTER D.E.H. TIME UPDATE-DISPLAY PROCEDURE MP l-1.13-3 2 1&2 **P-2000 DEH SYSTEM PROGRAM LOADING PROCEDURE USING THE ML-2000 AUTOMATIC MEMORY LOADER CARD MP l-1.13-4 0 1&2 *P-2000 DEH SYSTEM PROGRAM LOADING PROCEDURE FOR THE TERMINAL EMULATOR PROGRAM MP l-1.13-5 1 1&2 *P-2000 DEH SYS1EM PROGRAM LOADING PROCEDURE FOR THE GRAPHICS OPTION MP l-1.13-6 0 1&2 *P2000/DEH SYSTEM PREPARATION FOR OPTIMUM PERFORMANCE PRIOR I

, TO STARTUP M? l-1.13-10 0 1&2 *DEH VALVE MANAGEMENT CURVE VERIFICATION  ! hP l-1.13-11 1 1 *DEH/P2000 TURBlNE CONTROL SYS CAPACITOR TEST AND POWER SUPPLY VERIFICAT10ta  ; MP l-1.13-11 0 2 *DEH/P2000 TURBlNE SYS CAPACITOR TEST AND POWER SUPPLY i VERIFICATION ! MP l-1.16-7 1 1&2 ***PPC 16 CHANNEL ANALOG'lNPUT CARD RTP7334/01' REPLACEMENT

                                        & CAllBRATION MP l-1.16-8           0 1&2
  • PLANT PROCESS COMPUTER (PPC) SYSTEM RESTART-MP l-1.17-1 0 1&2 *CAllBRATl0N OF ERfDS-SPDS ANALOG INPUTS  :

MP l-1.18-1 5 1&2

  • GUIDELINES FOR THE' SERVICING & TESTING OF THE.PYR-A-LARM FIRE DETECTORS MP l-1.18-2 0 1&2 *** FIRE PROTECTION SYSTEM COMPUTER' REMOVAE 't.ND RETURN TO I

SERVICE l MP l-1.21-1 1 1&2 ** SUPPLEMENTARY SElSMIC MONITORING SYSTEM TAPE REPLACEMENT AFTER RECEIVING SEISMIC EVENT MP l-1.21-2 0 1&2 ** SUPPLEMENTARY SEISMIC MONITORING SYSTEM TAPE PLAYBACK l ONTO CHART PAPER I MP l-1.22-1 l 0 1&2

  • REPLACEMENT OF THE MAIN TURBINE MOOG VALVE WITH THE UNIT 1 ON-LINE MP l-1.23-1 .2 1&2
  • STEAM DUMP SYSTEM PRESTARTUP INSPECTION AND FUNCTIONAL TEST MP l-1.25-1 1 1 *** DIGITAL FEEDWATER CONTROL SYSTEM ENGINEERING CONSOLE ROUTINE OPERATIONS ,
                                                                                                                                                 )

i l i i

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SC I&C MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

============= === ==== .........................................................

MP l-1.25-1 1 2 *** DIGITAL FEEDWATER CONTROL SYSTEM ENGINEERING CONSOLE ROUTINE OPERATIONS MP l-1.26-1 0 1&2

  • CONDENSATE POLISHER COMPUTER SYSTEM BOOT-STRAPPING INSTRUCTIONS MP l-1.27-1 0 1 *lNSTRUMENT PANELS PIA & PIB COMMON POWER SUPPLIES CALIBRATION MP l-1.27-1 0 2 *lNSTRUMENT PANELS PIA AND PIB COMMON POWER SUPPLIES CAtlBRATION MP l-1.2B-1 0 1
  • MAIN AND BYPASS FEEDWATER REG VALVE PRE-STARTUP FUNCTIONAL TEST MP l-1.28-1 1 2
  • MAIN AND BYPASS FEEDWATER REG VALVE PRE-STARTUP INSPECTION MP l-1.29-1 1 1 *BRANDT PI-DPT TRANSMITTER / CONTROLLER ALIGNMENT MP I-1.29-1 1 2- *BRANDT PI-DPT TRANSMITTER / CONTROLLER ALIGNMENT MP l-1.30-1 2 1 *10% ADV BACKUP AIR BOTTLE CHANGE-0UT AND' LEAK TEST -

MP I-1.30-1 0 2 *10% ADV BACKUP AIR BOTTLE CHANGE-0UT AND LEAK TEST MP l-1.31-1 1 1&2

  • FUNCTIONAL TES1 VIBRATION AND LOOSE PARTS MONITOR-MP I-1.31-2 1 1&2
  • CHANNEL-CALIBRATION AND FUNCTIONAL TEST VIBRATION AND LOOSE PARTS MONITOR MP l-1.32-1 2 1 *RADATION MONITORING SYSTEM KAYE DATA LOGGER PROGRAMMING AND CALIBRATION MP l-1.32-1 1 2
  • RADIATION MONITORING SYSTEM KAYE DATA LOGGER PROGRAMMING' AND CAllBRATION MP l-1.33-1 1 1 *40% CONDENSER STEAM DUMP VALVE STROKE FUNCTIONAL TEST MP l-1.33-1 1 2 *40% CONDENSER STEAM DUMP VALVE STROKE FUNCTIONAL. TEST MP l-1.34-1 0 1 *35% AlnOSPHERIC STEAM DUMP. VALVE STROKE FUNCTIONAL. TEST MP I-1.34-1 0 2 *35% ATMOSPHERIC STEAM DUMP VALVE STROKE FUNCTIONAL TEST MP l-1.35-1 0 IL2
  • ACCESSING EMERGENCY ASSESSMENT.AND RESPONSE. SYSTEM (EARS)

INPUTS MP I-1.36-1 1 1 *** MAIN TURBINE DEH DC BUS, AUTO-STOP.0ll AND E-H HEADER FUNCTIONAL TEST MP l-1.36-1 1 2 *** MAIN TURBlNE CONTROL INTEGRATED FUNCTIONAL TEST MP l-1.37-1 1 1

  • CONTAINMENT H2 MONITORS CELL 82 AND CELL 83-TEMPORARY POWER JUMPERS MP l-1.37-1 1 2
  • CONTAINMENT H2 MONITORS CELL.82 AND CELL 83 TEMPORARY POWER SUPPLIES MP l-1.37-2 1 1
  • CONTAINMENT PERSONNEL AND EMERGENCY HATCH ANNUNCIATOR-JUMPER ,

MP l-1,37-2 0 2

  • CONTAINMENT PEPSONNEL AND EMERGENCY HATCH ANNUNCIATOR  !

JUMPER MP l-1.37-3 1 1 *CONTAlHMENT EVACUATION ALARM JUMPER INSTALLATION-AND REMOVAL MP l-1.37-3 0 2

  • CONTAINMENT EVACUATION ALARM JUMPER INSTALLATION AND REMOVAL e

i

l 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 UOLUME SC I&C MAINTENANCE PROCEDURES  ! TABLE OF CONTENTS NUMBER REV UNIT TITLE

    =============== === ==== =

MP l-1.37-4 0 1 *** MAIN TURBINE AUTO-STOP OIL /EHC INTERFACE VALVE PCV-23 JUMPER l MP l-1.37-4 0 2 *** MAIN TURBINE AUTO-STOP OIL /EHC INTERFACE VALVE PCV-23 JUMPER l MP l-1.39-1 0 1 *VALIDYNE TO PPC VERIFICATION AND VALIDATION MP I-1.39-1 0 2 *VALIDYNE TO PPC VERIFICATION AND VALIDATION MP l-1.40-1 0 1&2 *RADLOG DOWNLOAD INSTRUCTIONS FOR VICT0REEN DIGITAL-RADIATION MONITOR SYSTEMS - MP I-1.40-2 0 1&2

  • FLOW CONTROLLER ALIGNMENT VICT0REEN SERIES #844-223-10 MP l-2.1-0 3 1&2 ** MASTER LIST FOR C0AX AND TRIAX CABLE WORK I MP l-2.1-1 1 1&2 **C0 AXIAL AND TRIAXIAL CABLE TERMINATION PROCEDURE -

MP 1-2.1-2 1 1&2 **C0AX1AL'& TRIAXIAL CABLE & CONNECTOR ELECTRICAL TESTS i MP I-2.1-3 2 1&2 **C0 AXIAL & TRIAXIAL CABLE CONNECTOR BOOTING , MP l-2.1-4 0 1 ***NIS TRIAX]AL CONNECTOR INSTALLATION, CABLE TESTING, AND RAYCHEM INSTALLATION MP I-2.1-4 1 2 ***NIS TRIAXIAL CONNECTOR INSTALLATION CABLE TESTING, AND RAYCHEM INSTALLATION MP 1-2.2-1 5 1&2 ** ENVIRONMENTALLY QUALIFIED CONDUIT SEALS MP I-2.3-1 2 1&2

  • FIELD WIRING SPLICE ENVIRONMENTAL QUALIFICATION MP l-2.5-1 5 1&2 *CAllBRATION OF PLANT PRESSURE GAUGES MP l-2.7-1 12 1&? ** TRANSMITTER ENVIRONMENTAL QUALIFICATION MP I-2.8-1 2 1&2 ***DPU INSTRUMENT VALVE MANIPULATION DURING CALIBRATION AND

! SENSING LINE flLLING l MP l-2.9-1 1 1&2 ** TESTING BARTON CAPILLARY SYSTEMS . I MP l-2.9-2 1 1&2 **CAPILIARY SYSTEM FILLING & PROOF TESTING ! MP l-2.9-3 0 1&2 ** CAPILLARY FILt VAPOR EVACUATION ! MP l-2.11-1 1 1&2 **DIFFERENT]AL PRESSURE INDICATING SWITCH ENVIRONMENTAL QUAllFICATION MP I-2.12-1 5 1&2 **MODEL EA180 POSITION SWITCH MAINTENANCE & ENVIRONMENTAL ! QUALIFICATION .. MP l-2.12-2 2 1&2 **NAMCO CONNECTOR 0-RING REPLACEMENT FOR ENVIRONMENTAL l QUALIFICATION l MP l-2.12-3 0 1&2 **MODEL EA740\EA750 POSITION SWITCH MAINTENANCE & t ENVIRONMENTAL QUAllFICATION l MP l-2.12-4 0 1&2 **MODEL EA170 POSITION SWITCH MAINTENANCE & ENVIRONMENTAL QUALIFICATION l MP l-2.13-1 0 1&2 ** GAMMA-METRICS JUNCTION BOX ENVIRONMENTAL' QUALIFICATION MP l-2.13-2 0 1&2

  • WESTINGHOUSE INCORE THERMOCOUPLE REFERENCE JUNCTION BOX ENVIRONMENTAL QUAllflCATION MP l-2.14-1 3 1&2
  • TEMPERATURE SENSOR CALIBRATION CHECK, THERMOCOUPLES &

THERMOMETERS MP l-2.14-2 3 1&2

  • REPLACEMENT OF REACTOR COOLANT RTD'S l

MP I-2.17-1 1 1&2 *** GUIDELINES FOR' PRINTED CIRCUIT BOARD REPAIR AND-MODIFICATION h

22 JUL 93 DIABLO CANYON POWER PLANT  ! UNITS 1 AND 2 VOLUME SC I&C MAINTENANCE PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   ===============     === .... = = = = = = = = = = . . = = = = = = = = = . . . . . . . . . . . . . . . . . . . . . . . . . . . . = = . . = = = =

MP I-2.21-1 6 1&2 *** REACTOR HEAD INSTRUMENTATION REMOVAL AND REINSTALLATION MP l-2.22-1 ' 0 1&2 ** REPAIR & INSTALLATION OF CORE EXIT THERMOCOUPLE CONNECTORS MP l-2.23-1 O 1&2

  • TESTING MSA. PRESSURE DEMAND REGULATORS MP I-2.23-2 0 1&2 ** CALIBRATION OF MSA POWERED AIR PURIFYING RESPIRATOR (PAPR) FLOW TESTER MP I-2.24-1 3 1&2 **lNSTALLATION OF METALLIC COMPRESSION FITTINGS ON INSTRUMENT TUBING MP l-2.24-3 0 1&2 **SYNFLEX HOSE CONNECTOR MAKE UP MP I-2.24 2 1&2
  • PRESSURE TESTING OF INSTRUMENT TUBING SYSTEMS I MP l-2.25-1 2 1&2 ** CONTROL VALVE TRAVEL & BENCH SET ADJUSTMENTS MP l-2.25-2 1 1&2 **lTT-GRINNELL AIR.0PERATED VALVE SET UP MP l-2.28 5 1 ***CAllB, ACTIVATION AND REMOVAL FROM SERVICE OF RX VESSEL-REFUELING LEVEL' INDICATION SYS (RVRLIS)

MP I-2.28 2 2 ***CALIB, ACTIVATION & REMOVAL FROM SERVICE OF RX VESSEL 3 ) REFUELING LEVEL INDICATION SYS (RVRLIS) MP I-2.29-1 1 1&2 ** CAPACITOR CAPACITANCE AND LEAKAGE TESTING MP I-2.30-1 1 1&2

  • FUNCTIONAL TEST OF THE'FEEDWATER HEATERS & MSR DUMP LEVEL 1 '

CONTROL SYSTEMS MP I-2.30-2 2 1

  • FUNCTIONAL TEST OF THE FEE 0 WATER HEATERS AND MSR ALARM, TRIP, AND CONTROL SYSTEMS
  • MP l-2.30-2 0 2
  • FUNCTIONAL TEST OF THE FEEDWATER' HEATERS AND MSR ALARM,

? TRIP, AND CONTROL SYSTEMS' MP l-2.31-1 3 1

  • FUNCTIONAL CHECK OF MAIN FEEDWATER PUMP 1-1 CONTROLS MP I-2.31-2
                                                        ~

3 1

  • FUNCTIONAL CHECK OF MAIN FEEDWATER PUMP-1-2 CONTROLS-MP l-2.31-3 4 2
  • FUNCTIONAL CHECK OF MAIN FEEDWATER PUMP 2-1 CONTROLS MP I-2.31-4 5 2
  • FUNCTIONAL CHECK OF MAIN FEEDWATER PUMP 2-2 CONTROLS MP l-2.32-1 0 1 *** SOURCE / INTERMEDIATE RANGE DETECTOR NE-31/NE-35

) REPLACEMENT MP l-2.32-1 1 2 *** SOURCE / INTERMEDIATE RANGE DETECTOR NE-31/NE-35 REPLACEMENT MP l-2.32-2 2 1 *** SOURCE /lhTERMEDIATE RANGE DETECTOR NE-32/NE-36 REPLACEMENT ' MP l-2.32-2 0 2 ) *** SOURCE / INTERMEDIATE RANGE DETECTOR NE-32/NE-36 REPLACEMENT MP l-2.33-1 1 ,1&2 *CAllBRATION OF BREATHING AIR MONITOR LOW PRESSURE ALARM SWITCH MP l-3.1-1 4 1&2

  • ROUTINE MAINTENANCE OF HAGAN OPTIMAC RECORDERS MP I-3.1-2 0 1&2
  • ROUTINE MA]NTENANCE ON BAILEY _ TYPE WM' RECORDERS MP I-3.1-3 2 1&2
  • ROUTINE MAINTENANCE ON FISCHER & PORTER' SERIES 51-RECORDERS

) MP l-3.1-4 1 1&2

  • ROUTINE MAINTENANCE ON ESTERLINE ANGUS MODEL-A RECORDERS MP l-3.1-5 1 1&2
  • ROUTINE MAINTENANCE ON WESTRONICS SERIES E RECORDERS (PEN TYPE)

MP l-3.1-6 , 2 1&2

  • ROUTINE MAINTENANCE ON WESTRONICS SERIES E RECORDERS.

(MULTIP01hT TYPE) , ?

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SC I&C MAINTENANCE PROCEDURES TABLE OF CONTENTS l-NUMBER REV UNIT TITLE-

   =============== === ==== ===========================================================

MP l-3.1-7 1 1&2 ** ROUTINE MAINTENANCE ON L & N SPEEDOMAX M & W PEN TYPE RECORDERS MP l-3.1-8 2 1&2 ** ROUTINE MAINTENANCE ON L & N SPEEDOMAX H & W MULTIPOINT RECORDERS MP I-3.1-9 1 1&2 ** ROUTINE MAINTENANCE ON HONEYWELL ELECTRONIK & TURB0 GRAPH HULTIPOINT RECORDERS MP l-3.1-10 1 1&2

  • ROUTINE MAINTENANCE ON TAYLOR MODEL 90J RECORDERS l MP 1-3.1-11 1 1&2 ** ROUTINE MAINTENANCE ON ESTERLINE' ANGUS MODEL E1124E MULTIPOINT RECORDER-MP l-3.1-12 0 1&2
  • ROUTINE MAINTENANCE ON BECKMAN MODEL ROS RECORDER MP I-3.1-13 0 1&2
  • ROUTINE MAINTENANCE ON CONCORD MODEL 5103 DIGITAL PRINTER MP l-3.1-14 0 1&2
  • ROUTINE MAINTENANCE 0N THE LEEDS & NORTHRUP SPEEDOMAX 2500 MULTIPOINT RECORDERS MP l-3.1-15 0 1&2 ** ROUTINE MAINTENANCE ON L&N 430 SERIES RECORDERS =

[ MP l-3.1-16 2 1&2 ** ROUTINE MAINTENANCE ON THE TRACOR WESTRONICS DDR10 DIGITAL DATA RECORDERS MP I-3.1-17 1 1&2 ** ROUTINE MAINTENANCE ON THE TRACOR WESTRONICS DDR10/MB-DIGITAL DATA RECORDERS WITH A MX60 MULTIPLEXER i MP I-3.1-18 2 1&2

  • ROUTINE MAINTENANCE ON FOXBORO E27R SERIES ELECTRONIC l INDICATING RECORDERS MP 1-3.1-19 2 1&2
  • ROUTINE MAINTENANCE ON TRACOR WESTRONIC E3 & P SERIES MINIATURE STRIP CHART RECOPDER MP l-3.1-21 1 1&2
  • ROUTINE MAINTENANCE ON L&N 100 SERIES RECORDERS MP l-3.1-22 0 1&2
  • ROUTINE MAINTENANCE ON MOLYTEK MODEL 2702-5 RECORDER l MP l-3.1-23 1 1&2 **ROUTI'lE MAINTENANCE ON L&N SPEE00 MAX 165/250 SERIES MULTIPOINT RECORDERS

) MP l-3.4-1 0 1&2

  • CLEAN FILTERS ON P250 & P2000-COMPUTERS MP l-4.4-1A 1 1&2
  • CALIBRATION CHECK OF DILLON LOAD CELL USED FOR RCCA DRAG TEST FIXTURE MP l-4.4-2A 4 1&2 ** CALIBRATION CHECK OF LOAD CELL & READOUT FOR FUEL HANDLING BRIDGE CRANE MP l-8.2 0 1&2 **EG&G DEW POINT SENSOR PHOTORESISTIVE DEVICE REPLACEMENT j MP l-8.8 1 1&2 *EG&G DEWPOINT CHECK MP 1-EA01 2 1&2 ***CAllBRATION OF GENERAL RESISTANCE RTD-100 - VOLTAGE RATIO METHOD

! MP l-EA04 2 1&2 ***CAllBRATION OF GENERAL RADIO 1433 DECADE RESISTORS - ! VOLTAGE RATIO METHOD l MP I-EA05 0 1&2 *CAllBRATION OF LEEDS & NORTHRUP MODEL'86B6 MILLIVOLT s POTENTIOMETER f MP l-EA03 1 1&2 ** CALIBRATION OF GEN RAD TYPES 1531-AB & 153B-A STROBOTACS I MP l-EA09 3 1&2 ***CAllBRATION OF 100 PPM LOAD RESISTORS MP l-EA10 1 1&2 ***CAllBRATION OF SENSITIVE RESEARCH MODEL ESD ELECTROSTATIC VOLTMETERS l [

22 JUL 93 DIABLO CANYON POWER PLANT-UNITS 1 AND 2 VOLUME SC

                                                                                             )

l ILC MAINTENANCE PROCEDURES

o TABLE OF CONTENTS-NUMBER REV UNIT TITLE
 .=...=.=.......   ==. ..=. ..........................................................=

l MP l-EAll 0 1&2 *** CALIBRATION OF GENERAL RADIO 1433 DECADE RESISTORS - CURRENT COMPARISON METHOD 2 1&2 MP I-EAl2 *** CALIBRATION OF FLUKE MODEL 845AB HIGH IMPEDANCE VOLTMETER NULL DETECTOR MP l-EA13 0 1&2

  • CALIBRATION OF TELEDYNE ANALYTICAL MODEL 235TG THERMAL-l CONDUCTIVITY ANALYZER .

, MP I-EA14 1 1&2 *** CALIBRATION OF.GUILDLINE MODEL 9975 DC COMPARATOR I RESISTANCE BRIDGE-MP I-EA15 2 1&2 *** CALIBRATION OF PYROTRONICS SCU-9 FIRE DETECTOR SENSITIVITY TEST SET . ! MP I-EA17 2 1&2 ***CAllBRATION OF GAS TECH MODEL 1220-110210 GAS DETECTION SYSTEM MP 1-EA18 3 1&2

  • CALIBRATION OF KINEMETRICS MODEL FC-1 FIELD CALIBRATOR MP l-EA19 0 1&2 *CAllBRATION OF ANALYSIS &' MEASUREMENT SERVICES ERT-1 RTD LCSR TEST INSTRUMENT l

MP I-EA21 1 1&2

  • CALIBRATION OF FLUKE MODEL 5220A TRANSCONDUCTANCE AMPLIFIER MP l-EA22 1 1&2 *CAllBRATION OF COMPUTER PRODUCTS MODEL RTP7394/01 16 CHANNEL A/D CARD CALIBRATOR MP l-EA23 0 1&2 *** CALIBRATION OF GENERAL RESISTANCE RTD-100 - CURRENT-COMPARISON METHOD

) MP l-EA24 0 1&2 *CAllBRATION OF DCPP WIND SPEED CALIBRATOR-MP I-EA25 0 1&2

  • CALIBRATION OF THE RVLIS RTD TESTER MP l-EDG2 2 1&2
  • CALIBRATION OF-FLUKE 8810A DIGITAL MULTIMETER MP l-ED03 2 1&2
  • CALIBRATION OF FLUKE MODEL 8060A DIGITAL MULTIMETER l MP l-ED04 0 1&2
  • CALIBRATION OF FLUKE HYDRA DATA LOGGER MP l-E005 1 1&2 *** CAL! BRAT 10N OF FLUKE MODEL 8600A DIGITAL MULTIMETER MP l-ED06 1 1&2 ***CAllBRATION OF RONAN MODEL X86 PORTABLE CAllBRATOR t MP l-E007 0 1&2 *** VERIFICATION OF SPECTRACOM 8164 NBS RECEIVER AND 8171A WWVB SYNCHRONIZED CLOCK' MP l-ED09 1 1&2 *** CALIBRATION OF TRANSMATION MODEL 1040 DIGITAL' CALIBRATOR MP l-E010 1 1&2 ***CAllBRATION OF RONAN MODEL X85 PORTABLE CALIBRATOR. '

MP l-ED13 0 1&2 *CAllBRATION OF STOPWATCHES HP I-ED17 0 1&2 ***CAllBRATION OF FLUKE MODEL 5440B DIRECT VOLTS CAllBRATOR k MP l-ED21 1 1&2 ***CAllBRATION'0F ANALYSIS AND MEASUREMENT SERVICES ELC-1 l LCSR ANALYZER SOFTWARE ! MP I-ED22 3 1&2

  • CALIBRATION OF MULTI-AMP MODEL SST-2 DIGITAL TIMER MP l-ED23 4 1&2 *CAllBRATION OF FLUKE MODEL 8842A DIGITAL MULTIMETER MP l-ED24 0 1&2 ** CALIBRATION OF GEN RAD MODEL'1546 DIGITAL STR0BOTAC MP l-E028 1 1&2 ***CAtlBRATION OF EBERLINE MODELS MP-1 AND MP-2 MINI PULSERS -

MP l-E029 0 1&2 *CAllBRATION OF. DORIC MODEL 130A C-METER MP I-ED30 2 1&2 ***CAllBRATION OF NUCLEAR CONSULTING SERVICES F-1000-HD MODEL SAE HALIDE DETECTOR MP l-ED32 2 1&2

  • CALIBRATION OF EG&G ORTEC 776 COUNTER / TIMER  !

MP l-ED33 0 1&2 *CAllBRATION OF METRABYTE DASH-16 A/D CARD l 1 1 i i

           - .                .    -. =                                          . _ .  .- .        .  -

22 JUL 93 DIABLO CANYON POWER PLANT I UNITS 1 AND 2 VOLUME SC I&C MAINTENANCE PROCEDURES TABLE OF CONTENTS'  ! i NUMBER REV UNIT TITLE manz==mn=z===== men zza= u n z zza m amm == = ma m umm am anzzzs amazana za amm az zana za nanm a n z a s t z a MP I-ED37 1 1&2

  • CALIBRATION OF EQUIPMENT TIMER ~

MP l-ED40 1 1&2

  • CALIBRATION OF FLUKE MODEL 45 DIGITAL MULTIMETER MP l-ED41 0 1&2
  • CALIBRATION OF HONEYWELL OMNILIGHT MODEL BM37 RECORDER MP l-ED42 1 1&2 *CAllBRATION OF LUDLUM MODEL 2000 PORTABLE SCALER MP l-MA01 0 1&2
  • CALIBRATION OF MECHANICAL HOLTEST MICROMETERS MP l-MA02 1 1&2
  • CALIBRATION OF TORQUING DEVICES MP l-MA03 0 1&2
  • CALIBRATION OF PRATT & WHITNEY MODEL C SUPERMICROMETER MP l-MA04 0 1&2 ***CAllBRATION OF LEVELS MP l-MA05 1 1&2
  • CALIBRATION OF MAGNETIC C0ATING THICKNESS GAUGES.

l MP l-MA06 0 1&2

  • CALIBRATION OF G0/N0 G0 GAGES MP l-MA07 0 1&2 ***CAllBRATION OF FORCE MEASURING INSTRUMENTS USING MOREHOUSE PROVING RINGS l MP I-MA08 1 1&2
  • CALIBRATION OF INSIDE MICROMETERS i MP l-MA09 4 1&2
  • CALIBRATION OF HYDRAULIC TORQUE WRENCHES-MP l-MA10 0 1&2 *** CALIBRATION OF OUTSIDE MICROMETERS MP l-Mall 1 1&2 *CAllBRATION OF DIAL INDICATORS MP l-MA12 0 1&2
  • CALIBRATION OF THICKNESS GAGES MP l-MA13 1 1&2
  • CALIBRATION OF WIRE TERMINAL CRIMPING TOOLS MP I-MA14 0 1&2
  • CALIBRATION OF HANGING SCALES MP l-MAIS 3 1&2
  • CALIBRATION OF MICROMETER HEADS l MP l-MA16 1 1&2
  • CALIBRATION OF FORNEY DUAL BEAM PLATFORM. SCALE MP l-MA17 0 1&2
  • CALIBRATION OF AMP TERM 1-POINT PULL TEST. TOOL  !

MP l-MAlB 3 1&2

  • CALIBRATION OF OHAUS MODEL 2610G TRIPLE BEAM BALANCE MP l-MA19 0 '. & 2 *CAllBRATION OF MICROMETER DEPTH GAGES

, MP I-MA20 0 1&2

  • CALIBRATION OF DIAL & VERNIER CALIPERS MP 1-MA21 2 1&2
  • CALIBRATION OF ADJUSTABLE & NON-ADJUSTABLE PARALLELS

! MP l-MA22 0 1&2

  • CALIBRATION OF BELT TENSION CHECKERS MP l-MA23 1 1&2 '
  • CALIBRATION OF STARRETT-MODEL 716 DIAL INDICATOR CAllBRATOP MP l-MA24 1 1&2 *CAllBRATION OF DIRECT READING HEIGHT GAGES.

MP l-MA25 1 1&2 ***CAllBRATION OF.END MEASURING RODS: J MP l-MA26 0 1&2 *CAllBRATION OF TURBINE TAPER GAGES  ! MP l-MA28 0 1&2 *CAllBRATION OF GILSON MODEL HS-300P PLATFORM SCALE l l MP 1-MA29 0 1&2 *CAllBRATION OF HOWE-RICHARDSON MODEL 5400rPLATFORM SCALE i MP I-MA30 0 1&2

  • CALIBRATION OF EDLUND MODEL E80 ELECTRONIC SCALE MP l-MD02 1 1&2
                                *CAllBRATION OF AMTEK ACCUFORCE DIGITAL FORCE GAUGES l MP l-MD03          3 1&2
  • CALIBRATION OF AKO TORQUE SPECIALTIES SERIES TSD TORQUEi CALIBRATION SYSTEM MP l-PA01 0 1&2 *CAllBRATION OF HEISE MODEL C CM AND CMM PRESSURE GAUGES u MP l-PA03 0 182
  • CALIBRATION OF ANALOG AND DIGITAL PRESSURE GAUGES MP l-PA04 0 ll? -{
                                *CAllBRATION OF WALLACE L'TIERNAN MODEL FA-187-MERCURY

! MANDMETER MP I-PA05 0 16? ** CALIBRATION OF ANALOGeVACVUM GAUGES MP l-PA06 0 1&2 MP 1-pal 2 ***CAllBRATION OF LOW ACCURACY COMPOUND PRESSURE GAUGES 0 1&2 *CAllBRAT10N 0F DWyER MODEL 1425 HOOK GAUGE i s I

e

                                                                                           .)

i 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 < VOLUME SC I&C MAINTENANCE PROCEDURES a TABLE OF CONTENTS i NUMBER REV UNIT TITLE i =============== === ==== =================================================1========= MP l-PA13 0 1&2

  • MAINTENANCE AND OPERATION OF DWYER MODEL 1425 HOOK GAUGE MP l-PA14 0 1&2 *CAllBRATION OF DWYER MAGNEHELIC DIFFERENTIAL PRESSURE GAUGES MP I-PA16 1 1&2 *** CALIBRATION OF HIGH ACCURACY COMP 0UND PRESSURE GAUGES l MP I-PA1B 0 1&2 *CAllBRATION OF VALIDYNE DPISTL PRESSURE TRANSDUCERS i MP l-PD02 1 1&2
  • CALIBRATION OF DIGITAL GAUGE PRESSURE' INDICATORS-MP l-PD03 1 1&2
  • CALIBRATION OF DIGITAL DIFFERENTIAL PRESSURE GAUGES &

VACUUM GAUGES 3 MP l-PD04 0 1&2 **CAllBRATION Of HEISE-MODELS 730A-07 & 730B-07 DIGITAL PORTABLE PNEUMATIC CAllBRATORS MP l-PD05 1 1&2 *CAllBRATION OF HONEYWELL STD SERIES SMART PRESSURE TRANSMITTERS MP l-RC01 1 1&2 *** CALIBRATION OF EBERLINE E-140 PORTABLE SURVEY INSTRUMENT , MP l-RCO2 1 1&2 *** CALIBRATION OF EBERLINE E-140N COUNT RATE METER '

 ,  MP l-RC03          1  1&2 *CAllBRATION OF EBERLINE RM-14 COUNT RATE METER MP l-RC04          1  1&2
  • CALIBRATION OF EBERLINE RM-15 COUNT RATE METER MP l-RC05 1 1&2
  • CALIBRATION OF EBERLINE RM-20-1 COUNT RATE METER WITH AC-3 PROBE MP l-RC07 0 1&2 ***AUT0-CAllBRATION OF THE BICRON ALMS AUTOMATED LAUNDRY ,

MONITORING SYSTEM i y MP 1-RC08 0 1&2 *CAllBRATION OF EBERLINE RM-3C-4 RADIATION MONITOR MP l-RC09 0 1&2 ***CAllBRATION OF EBERLINE PRM-5-3 COUNT RATE METER WITH' - SPA-3 PROBE MP l-RC10 0 1&2 *** CALIBRATION OF EBERLINE MODEL PRM-6 PULSE RATE METER WITH PA-3 PROBE' ' MP l-RC11 0 1&2 ***CAllBRATION OF EBERLINE MODEL MS-2 MIN] SCALER 4

 )

MP l-RC12 0 1&2 *** CALIBRATION OF EBERLINE-MODEL BC-4 BETA COUNTER l MP I-RC13 0 1&2

  • CALIBRATION OF EBERLINE MODEL SAC-4 SCINTILLATION ALPHA l COUNTER MP I-RCl4 2 1&2
  • ELECTRONIC CAllBRATION OF EBERLINE AMS-3 BETA AIR MONITOR MP l-RC15 5 1&2 *** CALIBRATION OF EBERLINE PCM-1B PERSONNEL CONTAMINATION ,

MONITOR MP l-RC16 2 1&2 l

  )                           *" CALIBRATION OF EBERLINE TCM-1A TOOL CONTAMINATION MONITOR !

MP l-RC17 0 1&2 *CAllBRATION OF IRT MODEL PRM-110 PORTAL RADIATION MONITOR MP l-RCIB 2 1&2 ***ISOT0Plc CALIBRATION OF EBERLINE MODEL IM-11'10 DINE' MONITOR MP I-RC19 0 1&2 *** CALIBRATION OF EBERLINE RM-145 COUNT RATE METER-FOR FRISKER PROBES

  )

MP I-RC21 0 1&2 *CAllBRATION OF EBERLINE RM-20-1 COUNT RATE METER WITH FRISKER PROBES MP I-RC23 0 1&2 *** CALIBRATION OF EBERLINE RM-14SA COUNT RATE METER FOR FRISKER PROBES MP l-RD01 2 1&2 *** CALIBRATION OF EBERLINE MODEL R0-2 ION CHAMBER SURVEY INSTRUMENT

  }

l

  )                                                                                          s

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SC I&C MAINTENANCE PROCEDURES I TABLE OF CONTENTS NUMBER REV UNil TITLE I

 =============== === ==== ===========================================================

MP l-RD02 2 1&2 *** CALIBRATION OF EBERLINE R0-2A ION CHAMBER SURVEY INSTRUMENT ) MP l-RD03 4 1&2 ***CAllBRATION OF EBERLINE 6112B TELETECTOR G-M SURVEY INSTRUMENT MP l-RD04 2 1&2

  • CALIBRATION OF EBERLINE MODEL PNR-4 PORTABLE NEUTRON REM COUNTER MP l-RDOS 1 1&2 *** CALIBRATION OF EBERLINE EC4-X PORTABLE AREA MONITOR WITH DAl-6 G-H DETECTOR

) MP l-RD06 1 1&2 ***CAllBRATION OF EBERLINE E-520 GEIGER COUNTER WITH HP-270 PROBE MP l-RD07 0 ]&? *CAllBRATION OF EBERLINE ESP-2 WITH HP-220A PROBE AND 60 FOOT CABLE MF 1-PDOB 2 1&2 ***CAllBRATION OF EBERLINE ASP-1 PORTABLE SURVEY INSTRUMENT WITH HP-270 PROBE ) MP l-RD09 1 1&2 *** CALIBRATION OF EBERLINE E-530N GEIGER COUNTER WITH HP-220A PROBE MP l-RD10 1 1&2 *CAllBRATION OF EBERLINE MODEL R0-7 10N CHAMBER SURVEY INSTRUMENT MP 1-RD12 1 1&2 *** CALIBRATION OF EBERLINE ASP-1 WITH HP-290 PROBE AND 60 FOOT CABLE ) MP l-RD14 0 1&? ***CAllBRATION OF EBERLINE RMS-II SYSTEM WITH THE HP-310 PROBE MP l-RDIS 2 1&2 *** CALIBRATION OF NMC MODEL GA-2TO GAMMA ALARM SYSTEM MP l-RD16 0 1&2

  • CALIBRATION OF EBERLINE ESP-2 WITH VARIOUS DETECTORS  !

MP l-RD17 0 1&2 *** CALIBRATION OF XETEX MODEL 330A TELESCAN '

MP l-RD20 1 1&2 ***CAllBRATION OF JOHNSON 2000W EXTENDER G-M SURVEY  ;

) INSTRUMENT MP l-RD25 1 1&2 *** CALIBRATION OF DOSITEC PR-2 PORTABLE REMOTE MONITOR MP l-RD26 2 1&2

  • CALIBRATION OF DOSITEC MODEL 502A DIGITAL ALARMING DOSIMETER 1 MP l-RD27 1 1&2
  • CALIBRATION OF 0051TEC MODEL AR-20 REMOTE MONITOR WITH  !

UNDERWATEP PROBE I ) MP I-RD30 3 1&2

  • CALIBRATION OF XETEX MODEL 415 B-1 DIGITAL ALARMING DOSIMETER MP l-RD31 1 1&2 ***CAllBRATION OF XETEX MODEL 412AT/503AR TELEDOSE SYSTEM MF 1-FF01 0 1&2 ***CAllBRATION OF RADECO H-809V VARIABLE FLOW AIR SAMPLER MP l-Rf02 0 1&2 *** CALIBRATION OF RADECO H-809C PORTABLE BATTERY POWERED AIR SAMPLER

) MP l-RF03 0 1&2 **CAllBRATION OF RADEC0 H-809B2 PORTABLE BATTERY POWERED AIR SAMPLER MP I-RF04 0 1&2 *** CALIBRATION OF RADEC0 HD-28 CONSTANT FLOW AIR SAMPLER MP I-RF05 0 1&2 *** CALIBRATION OF RADECO HD-28B CONSTANT FLOW AIR SAMPLER MP l-RF06 0 1&2 *** CALIBRATION OF BENDIX BDX-60 CONSTANT FLOW PUMP MP l-RF07 0 1&2 *** CALIBRATION OF HI-Q MRV-14-C CONSTANT FLOW AIR SAMPLER ) l i

                    -                        --              ..                   .                       .           .           ~.             ,

22 JUL 93 DIABLO' CANYON POWER PLANT. l UNITS 1 AND 2  ! VOLUME SC I&C MAINTENANCE PROCEDURES l TABLE OF CONTENTS ! NUMBER REV UNIT TITLE

=============== === ==== = = = = = . . . . . = = = = = = = = = . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - = = = = = = =

MP l-RF08 0 1&2 ***CAllBRATION OF EBERLINE AMS-3 BETA AIR MONITOR ROTAMETER l MP l-RF09 0 1&2 *** CALIBRATION OF ENMET:ISA-44RAL-0D CARBON MON 0XIDE AND  : OXYGEN MONITOR HP l-RFil 0 1&2 *** CALIBRATION OF RE-ll&l2 GRAB SAMPLE CART ROTAMETERS MP l-RF12 0 1&2 *** CALIBRATION OF EBERLINE RAP-1 REGULATED' AIR PUMP 1

MP l-RF13 0 1&2 ***CALIBRAT10N'0F EBERLINE MODEL IM-ll IODINE MONITOR:

i ROTAMETER ! MP l-RF15 0 1&2 ***CAllBRATION OF RADEC0-HD-29A CONSTANT FLOW AIR SAMPLER MP I-RX01 ~l 1&2 ***lNITIAL ON-SITE-CALIBRATION OF PORTABLE RADIATION t DETECTION INSTRUMENTS . ! MP l-RX02 1 1&2- - *** CALIBRATION OF RADIDACTIVE WASTE SCALE MP l-TA02 0 1&2

  • CALIBRATION OF LIQUID-IN-GLASS THERMOMETERS MP l-TA03 0 1&2
  • CALIBRATION OF OMEGA SERIES CJ THERMOCOUPLE COLD-JUNCTION COMPENSATOR MP l-TA05 0 1&2
  • CALIBRATION OF GULTON MODEL Z-55 THERMOCOUPLE RECORDER-MP 1-TA06 1 1&2 *CAllBRATION OF DIAL THERMOMETERS MP l-TA07 1 1&2 **CAllBRATION OF TRANSMATION MODEL 1013 THRICE REFERENCE CELL
  • MP l-TA09 0 1&2 ** CALIBRATION OF THERMOCOUPLES j MP l-TA10 0 1&2 ** CALIBRATION OF FLUKE MODEL Y2001 THERM 0 COUPLE MULTIPOINT l SELECTOR l MP I-TD02 0 1&2 **CAllBRATION OF FLUKE MODEL 2175A' DIGITAL THERMOMETER. 3 L MP l-TD03 0 1&2 ***CAllBRATION OF OMEGA OMNI-CAL TEMPERATURE-CAllBRATOR  !

MP I-TD04 1 1&2 **CALIIBRATION OF FLUKE MODEL 2168A DIGITAL THERMOMETER- t l MF 1-lD05 0 1&2

  • CALIBRATION OF TEMPERATURE INDICATORS WITH DEDICATED $

IMMERSION OR SURFACE PROBE (S)' MP I-TD10 0 1&2 *CAllBRATION OF FLUKE MODEL 2190A DIGITAL-THERMOMETER i MP I-TD11 1 1&2 *CAllBRATION OF WAHL MODEL 392 SERIES DIGITAL THERMOMETERS - MP l-TD17 0 1&2 *** CALIBRATION OF WAHL MODEL 2500M DIGITAL THERMOMETER 3 1 MP 1-TD18 0 1&2 **CAllBRATION OF FLUKE MODEL 2180A (TYPE 2) DIGITAL-  ! THERMOMETER I

MP l-TD19 2 1&2 *CAllBRATION OF GUILDLINE MODEL 9734 CONSTANT
TEMPERATURE BATH .

MP l-TD20 1 1&2 ***CAllBRATION OF FLUKE MODEL 2300A-002 THERMOCOUPLE SCANNER MP l-TD21 1 1&2

  • CALIBRATION OF TRANSMATION 1060, 1061, 1062, AND 1064P' 1

THERMOCOUPLE CAllBRATORS  ! MP I-3-L110 2 1 *** STEAM GENERATOR l-1 AUX _FW SUPPLY LEVEL CONTROL CHANNEL l f t LCV-Il0 CALIBRATION  ! MP I-3-L110 1 2 *** STEAM GENERATOR 2-1 AUX FW SUPPLY-LEVEL CONTROL C$ANNEL  ! LCV-110 CALIBRATION . MP l-3-L111 2 1 *** STEAM GENERATOR l-2 AUX'FW SUPPLY LEVEL CONTROL CHANNEL LCV-111 CAllBRATION MP l-3-Lill 1 2 *** STEAM GENERATOR 2-2 AUX FW SUPPLY LEVEL CONTROL CHANNELL LCV-lll CAllBRATION 1 i l'

                                                                                                                                                   ~j

) 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME SC I&C MAINTENANCE PROCEDURES TABLE OF CONTENTS ) NUMBER REV. UNIT TITLE

   =============== === ====
                               ===========================================================

MP l-3-L113 1 1

                              *** STEAM GENERATOR 1-4 AUX FW SUPPLY LEVEL CONTROL CHANNEL LCV-113 CAllBRATION

) MP l-3-L113 1 2 *** STEAM GENERATOR 2-4 AUX FW SUPPLY LEVEL CONTROL CHANNEL LCV-113 CALIBRATION MP l-3-L115 1 1

                              *** STEAM GENERATOR 1-3 AUX FW SUPPLY LEVEL CONTROL CHANNEL LCV-115 CAllBRATION MP l-3-L115        1 2     *** STEAM GENERATOR 2-3 AUX FW SUPPLY LEVEL CONTROL CHANNEL LCV-115 CAllBRATION MP l-3-P433       0 1
  • AUXILIARY FEEDWATER PUMP 1-2 DISCHARGE PRESSURE CHANNEL

) PT-433 CAllBRATION MP l-3 P434 0 1

  • AUXILIARY FEEDWATER PUMP 1-3 DISCHARGE PRESSURE CHANNEL PT-434 CAllBRATION MP l-4 F48 2 1
  • STEAM GENERATOR l-1 BLOWDOWN FLOW CHANNEL FT-48 CAllBRATION MP l-4-F48 0 2
  • STEAM GENERATOR 2-1 BLOWDOWN FLOW CHANNEL FT-48 CALIBRATION

{ MP l-4-F49 1 1 )

  • STEAM GENERATOR 1-2 BLOWDOWN FLOW CHANNEL FT-49 CALIBRATION MP l-4-F49 0 2
  • STEAM GENERATOR 2-2 BLOWDOWN FLOW CHANNEL FT-49 CALIBRATION MP l-4-F51 1 1
  • STEAM GENERATOR 1-4 BLOWDOWN FLOW CHANNEL FT-51 CALIBRATION MP l-4-F51 0 2
  • STEAM GENERATOR 2-4 BLOWDOWN FLOW CHANNEL FT-51 CALIBRATION MP I-4-F60 2 1
  • STEAM GENERATOR 1-3 BLOWDOWN FLOW CHANNEL FT-60 CALIBRATION MP I-4-F60 1 2
  • STEAM GENERATOR 2-3 BLOWDOWN FLOW CHANNEL FT-60'CAllBRATION i

MP l-7-L56 1 2 ) *RVRLIS WIDE RANGE INDICATION CHANNEL LT-56 CALIBRATION MP l-7-L462 0 1 MP l-7-L462 *** PRESSURIZER LEVEL CHANNEL LT-462 (COLD) CALIBRATION 0 2

  • PRESSURIZER LEVEL CHANNEL LT-462 (COLD) CALIBPATION MP I-7-Y.1 0 1 *** CONFIGURATION CONTROL OF RCP VIBRATION / VELOCITY PROBES MP 1-7-Y.1 0 2 MP l-7-Y412n *** CONFIGURATION CONTROL OF RCP VIBRATION / VELOCITY PROBES 1 1
  • ROD SPEED CALIBRATION MP l-7-Y412H 0 2
  • ROD SPEED CALIBRATION

) MP l-S-F110 6 1

  • BORIC ACID FLOW CHANNEL FT-110 CALIBRATION MP l-8-F110 2 2
  • BORIC ACID FLOW CHANNEL FT-110 CAllBRATION MP l-8-F115 I 0 1 *RCP 1-4 SEAL WATER INLET FLOW CHANNEL FT-115 CALIBRATION MP l-8-F115 0 2 *RCP 2-4 SEAL WATER INLET FLOW CHANNEL FT-115 CAllBRATION l MP l-B-F116 0 1 *RCP 1-3 SEAL WATER INLET FLOW CHANNEL FT-116 CALIBRATION MP I-8-F116 0 2
)  MP l-8-F134               *RCP 2-3 SEAL WATER INLET FLOW CHANNEL FT-116 CAllBRATION      !

2 1 *RCS LETDOWN HEAT EXCHANGER DUTLET FLOW CHANNEL FT-134 i CALIBRATION MP l-8-F134 1 2 *RCS LETDOWN HEAT EXCHANGER OUTLET FLOW CHANNEL FT-134 CAllBRATION MP l-B-F143 0 1 MP l-8-F143 *RCP 1-2 SEAL WATER INLET FLOW CHANNEL FT-143 CAllBRATION 1 2 *RCP 2-2 SEAL WATER INLET FLOW CHANNEL FT-143 CALIBRATION

)  MP l-8-F144       0 1 MP l-8-F144               *RCP 1-1 SEAL WATER INLET FLOW CHANNEL FT-144 CALIBRATION 0 2     *RCP 2-1 SEAL WATER INLET FLOW CHANNEL FT-144 CAllBRATION MP l-8-L102       4 1
  • BORIC ACID STORAGE TANK 1-1 LEVEL CHANNEL LT-102 CALIBRATION
 )
 )

J 22 JUL 93 DIABLO CANYON POWER PLANT

                                        . UNITS 1 AND 2 VOLUME SC                         I&C MAINTENANCE PROCEDURES                                     ;

TABLE OF CONTENTS HUMBER REV UNIT TITLE

  ===============  === ==== =................................=====................=====

MP I-8-L102 1 2

  • BORIC ACID STORAGE TANK 2-2 LEVEL CHANNEL'LT-102 CALIBRATION ->

MP'l-8-L106 4 1

  • BORIC ACID STORAGE TANK 1-2 LEVEL CHANNEL LT-106,

) CALIBRATION . . l MP l-8-L106 1 2

  • BORIC ACID STORAGE TANK 2-1 LEVEL CHANNEL LT-106 '

l CAllBRATION l MP l-8-P142 O 1

  • CHARGING PUMPS DISCHARGE HEADER PRESSURE CHANNEL PT-142 l '

CALIBRATION ! MP l-8-P142 0 2

  • CHARGING PUMPS DISCHARGE HEADER PRESSURE CHANNEL PT-142 k CALIBRATION i

MP l-10-F640 0 1 *RHR' HEAT EXCHANGER OUTLET (RCS HOT LEGS) FLOW CHANNEL j ~FT-640 CALIBRATION l MP l-10-F640 0 2 *RHR HEAT EXCHANGER OUTLET (RCS HOT LEGS) FLOW CHANNEL ! FT-640 CALIBRATION MP l- 10-T639 0 1 *RHR HX 1-1 OUTLET TEMPERATURE CHANNEL TE-639 CAllBRATION h MP l-10-T639 0 2 *RHR HX 2-1 OUTLET TEMPERATURE CHANNEL TE-639 CALIBRATION l MP l-10-T649 0 1 *RHR HX 1-2 OUTLET TEMPERATURE CHANNEL TE-649 CALIBRATION l MP l-10-1649 0 2 *RHR HX 2-2 OUTLET TEMPERATURE CHANNEL TE-649 CAllBRAT10N ! MP l-12-F930 0 1

  • SPRAY ADDITIVE TANK 1-1 TO EDUCTORS CHANNEL FT-930; l CALIBRATION 3

MP l-12-F930 0 2

  • SPRAY ADDITIVE TANK 2-1 TO EDUCTORS CHANNEL FT-930.

) CALIBRATION MP l-14-F65 1 1

  • COMPONENT COOLING WATER SUPPLY HEADER B FLOW CHANNEL FT-65 i- CALIBRATION

! MP l-14-F65 1 2

  • COMPONENT C00LlHG WATER SUPPLY M ADER B FLOW CHANNEL FT-65 CALIBRATION '

MP l-14-F65 1 1

  • COMPONENT COOLING WATER SUPPLY HEADER A FLOW CHANNEL FT-68

? CALIBRATION MP l-14-F68 1 2

  • COMPONENT COOLING WATER SUPPLY HEADER A FLOW ~ CHANNEL FT-68.

CAllBRATION MF 1-14-F69 1 1

  • COMPONENT COOLING WATER SUPPLY HEADER C FLOW CHANNEL FT-69 l CAllBRATION l MP l-14-F69 0 2
  • COMPONENT COOLING WATER SUPPLY HEADER C FLOW CHANNEL FT-69

) CALIBRATION l MP l-14-F70 0 .1

  • CONTAINMENT FAN COOLER 1-1 FLOW CHANNEL FT-70 CALIBRATION MP l-14-F70 0 -2
  • CONTAINMENT FAN COOLER 2-1 FLOW CHANNEL FT-70 CAllBRATION MP l-14-F71 0 1 -* CONTAINMENT FAN COOLER 1-2 FLOW CHANNEL FT-71 CALIBRATION MP l-14-F71 0 2
  • CONTAINMENT FAN COOLER 2-2 FLOW CHANNEL FT-71 CAllBRATION j i MP l-14-F72 0 1
  • CONTAINMENT FAN COOLER 1-3 FLOW CHANNEL FT-72 CAllBRATION i

) MP l-14-F72 0 2

  • CONTAINMENT FAN COOLER 2-3: FLOW CHANNEL FT-72 CAllBRATION.  !

MP l-14-F73 0 1

  • CONTAINMENT FAN COOLER 1-4 FLOW CHANNEL FT-73.CAllBRAT10N MP I-14-F73 0 2 *CONTAlHMENT FAN COOLER 2-4 FLOW CHANNEL FT-73 CALIBRATION MP I-14-F74 0 1
  • CONTAINMENT FAN COOLER'l-5 FLOW CHANNEL FT-74-CALIBRATION I MP l-14-F74 0 2
  • CONTAINMENT FAN COOLER 2-5 FLOW CHANNEL FT-74 CALIBRATION l 4

i )

                                                                                                   )

i l I

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME- SC I&C MAINTENANCE PROCEDURES-TABLE OF CONTENTS NUMBER REV UNIT TITLE

 =============== === ==== . . . . . = = = = . . . . . . . . = = = . . . . . . . . . . . . . . . . . . . . . = . . . . . . . . - - . . . = = = =

MP l-14-T6 1 1

                                 *CCW HEAT EXCHANGER 1-1 OUTLET TEMPERATURE CHANNEL TE-6 CAllBRATION                                                                                                 .j MP l-14-T6         1 2          *CCW HEAT EXCHANGER 2-1 OUTLET TEMPERATURE CHANNEL TE-6 CALIBRATION MP l-14-T7         1  1        *CCW HEAT EXCHANGER 1-2 OUTLET TEMPERATURE CHANNEL TE-7 CALIBRATION MP I-14-T7         1 2         *CCW HEAT EXCHANGER 2-2 OUTLET TEMPERATURE CHANNEL TE-7 CALIBRATION MP l-17-T10       0 1
  • CIRCULATING WATER PUMP 1-1 DISCHARGE TEMPERATURE CHANNEL TE-10 CAllBRATION MP I-17-T10 0 2
  • CIRCULATING WATER PUMP 2-1 DISCHARGE TEMPERATURE CHANNEL TE-10 CALIBRATION MP I-17-T11 0 1
  • CIRCULATING WATER PUMP 1-2 DISCHARGE TEMPERATURE CHANNEL TE-11 CALIBRATION  ;

MP l-17-T11 0 2

  • CIRCULATING WATER PUMP 2-2 DISCHARGE TEMPERATURE CHANNEL TE-11 CAllBRATION MP I-18-L39 3 1&2
  • FIREWATER STORAGE TANK LEVEL CHANNEL LT-38 CALIBRATION MP I-19-L99 0 1
  • REACTOR COOLANT DRAIN TANK 1-1 LEVEL CHANNEL LT-99 l CALIBRATION MP l-19-L99 0 2
  • REACTOR COOLANT-0 RAIN TANK 2-1 LEVEL CHANNEL LT-99 CAllBRATION i MP I-21-P.1 1 1
  • DIESEL ENGINE CRANKCASE LOW VACUUM PRESSURE SWITCH CALIBRATION MP l-21-P.1 1 2
  • DIESEL GENERATOR CRANKCASE LOW VACUUM PRESSURE SWITCH CAllBRATION '

MP l-23-T.1 0 1

  • ELECTRICAL & ESF EQUIPMENT ROOM AREA' TEMPERATURE M3NITORING CHANNELS CALIBRATION 1 MP l-23-T.1 0 2 *(0TSC 6/22/93--SHAFFER) ELECTRICAL & ESF EQUIPMENT ROOM AREA TEMPERATURE MONITORING. CHANNELS CAllBRATION MP l-23-Y.1 1 1
  • CONTAINMENT. PERSONNEL HATCH LEAK DETECTION MONITOR CALIBRATION MP l-23-Y.1 2 2
  • CONTAINMENT PERSONNEL HATCH LEAK DETECTION MONITOR l CALIBRATION '/

) MP l-40-M569 0 1&2 *** BACKUP METEOROLOGY WIND DIRECTION, WIND SPEED; AND AIR l TEMPERATURE / DELTA-T MP I-40-Y538 0 1&2 *** PRIMARY METEOROLOGY SYSTEM PRECIPITATION CHANNEL YT-538 CAllBRATION ) l l l ) i j )  ! l

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 5URVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

      ==========.==== === ====
                                     .............................==..........................==

STP I-1A 41 1

  • ROUTINE SHIFT CHECKS REQUIRED BY' LICENSES STP l-1A 40 2
  • ROUTINE SHIFT CHECKS REQUIRED BY LICENSES-STP I-1B 35 1 *** ROUTINE DAILY CHECKS REQUIRED BY LICENSES STP I-1B 22 2 *** ROUTINE DAILY CHECKS REQUIRED BY LICENSES.

STP l-1C 33 1 *kOUTINE WEEKLY CHECKS STP I-1C 20 2

  • ROUTINE WEEKLY CHECKS STP l-1D 35 1
  • ROUTINE MONTHLY CHECKS REQUIRED BY LICENSES.

STP l-1D 19 2

  • ROUTINE MONTHLY CHECKS REQUIRED BY LICENSES-STP l-1E 3 1&2 *
                                   - ANALOG CHANNEL OPERATIONAL TESTS REQUIRED PRIOR J00 EACH REACTOR STARTUP STP l-2A          4 1&2
  • CALIBRATION Of FLUX DEVIATION & MISCELLANEOUS' CONTROL &

INDICATION CHANEL STP I-2A1 3 1&2

  • REMOVAL 0F A FLUX DEVIATION & MISCELLANEOUS CONTROL INDICATION CHANNEL FROM SERVICE' STP l-2A2 5 1&2 *CAllBRATION PROCEDURE.FOR FLUX DEVIATION & MISC CONTROL &

INDICATION CHANNEL STP l-2A3 4 1&2

  • REINSTATEMENT PROCEDURE FOR FLUX DEVIATION & MISCELLANE0US CONTROL & INDICATION CHANNEL STP l-2B 19 1&2
  • NUCLEAR POWER RANGE CHANNEL ANALOG. CHANNEL ANALOG CHANNEL OPERATIONAL TEST STP I-2C 5 1&2 ** CALIBRATION OF POWER RANGE CHANNEL STP 1-2C1 14 1&2
  • REMOVAL OF POWER RANGE CHANNEL'FROM SERVICE STP I-2C2 21 1&2 *** CALIBRATION PROCEDURE FOR POWER RANGE CHANNEL STP l-2C3 14 1&2
  • REINSTATEMENT OF POWER RANGE CHANNEL TO SERVICE-STP l-20 28 1&2 ***(OTS" 05/14/93 - BREWER) NUCLEAR POWER RANGE INCORE/EXCORE CAllBRATION STP I-2E 1 1&2
  • CALIBRATION OF COMPARATOR & RATE CHANNEL i

STP l-2E1 2 1&2

  • REMOVAL AND REINSTATEMENT OF COMPARATOR AND RATE CHANNEL-STP 1-2E2 4 1&2 *CAllBRATION PROCEDURE FOR COMPARATOR AND RATE CHANNEL STP l-2U 4 1&2 ** RESETTING HIGH FLUX RANGE BISTABLES FOR POWER RANGE CHANNELS STP I-2V 2 1&2 -
  • POWER RANGE CHANNEL HIGH VOLTAGE VERiflCATION STP 1-3A 10 1&2
  • NUCLEAR INTERMEDIATE RANGE CHANNEL ANALOG CHANNEL OPERATIONAL TEST STP I-3B 2 1&2
  • CALIBRATION OF INTERMEDIATE RANGE CHANNELS I STP l-3B1 2 1&2
  • REMOVAL OF INTERMEDIATE RANGE CHANNEL FROM SERVICE  ;

STP l-382 12 1&2 *CAllBRATION PROCEDURE FOR INTERMEDIATE RANGE CHANNEL l STP l-3V 1 1&2 *lNTERMEDIATE RANGE CHANNEL HIGH VOLTAGE VERIFICATION l STP l-4A 15 1&2

  • ANALOG CHANNEL OPERATIONAL TEST NUCLEAR SOURCE RANGE
)

STP l-4B 4 1&2

  • CALIBRATION OF SOURCE RANGE CHANNELS STP I-4B1 8 1&2
  • REMOVAL OF A SOURCE RANGE. CHANNEL FROM SERVICE STP l-4B2 9 1&2 ***CALIBRA110N PROCEDURE FOR SOURCE RANGE CHANNEL STP l-4B4 6 1&2 ** DETERMINATION OF SOURCE RANGE DETECTOR CHARACTERISTIC CURVES FOR THE WESTINGHOUSE LOW NOISE PREAMPLIFIERS 3 ..

1

 )

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES  ! l

      .                                       TABLt OF CONTENTS NUMBER            REV UNIT                             TITLE                                    ;
   ..=============   ..= .=== =====............................................== ... ===

STP l-4C 2 1&2 *CAllBRATION-OF AUDIO COUNT RATE - SCALER TIMER CHANNEL STP l-4C1 2 1&2

  • REMOVAL OF AN AUDIO COUNT RATE - SCALER TIMER CHANNEL. FROM SERVICE STP l-4C2 4 1&2
  • CALIBRATION PROCEDURES FOR AUDIO COUNT RATE / SCALER TIMER CHANNEL STP l-4C3 3 1&2
  • REINSTATEMENT PROCEDURE FOR AUDIO COUNT RATE / SCALER TIMER- l CHANNEL STP I-5A 38 1&2 *(OTSC 5/25/93-0'NEIL) ANALOG CHANNEL OPERATIONAL TEST OF OTDT, OPDT, T (AVG) AND DELTA-T' STP l-581 9 1&2
  • REMOVAL FROM SERVICE OF.0 TOT, OPDT, T(AVG) AND DELTA-T CHANNELS STP l-582 22 1
  • CHANNEL CALIBRATION OF OTDT, OPDT, T(AVG), AND DELTA-T .
  .STP I-582          17 2
  • CHANNEL CALIBRATION OF OTDT, OPDT,-T(AVG), AND DELTA-T STP l-5B3 15 1&2 *CAllBRATION OF.T(HOT) AND T(COLD) MV/1 MODULES STP l-585 5 1&2 **RCS NARROW RANGE RTD TIME RESPONSE TESTING .

STP l-586 6 1&2

  • RETURN TO SERVICE OF OTDT, OPDT,.T(AVG) AND DELTA-T CHANNELS STP 1-5B7 3 1&2 ** CHANNEL CALIBRATION RTD BYPASS LOOP FLOW STP l-6A 6 1&2
  • FUNCTIONAL TEST OF: PRESSURIZER PRESSURE CHANNELS-STP l-6B 7 1&2
  • CALIBRATION OF PRESSUR12ER PRESSURE CHANNELS' PROTECTION, SAFEGUARDS & REMOTE SHUTDOWN MONITORING FUNCTIONS-(INCLUDING SENSOR RESPONSE TEST)

STP l-6B1 7 1&2 ** REMOVAL OF PRESSURIZER PRESSURE. CHANNEL FROM SERVICE i STP l-6E2 9 1&2 *CAllBRATION OF PRESSURIZEP PRESSURE PROTECTION & SAFEGUARDS FUNCTIONS STP l-6E3 7 1&2

  • CALIBRATION OF PRESSURIZER PRESSURE. TRANSMITTERS-STP l-6E4 5 1&2
  • RESPONSE TIME TESTING OF PRESSURIZER PRESSURE TRANSMITTERS- ,

STP 1-6BS 6 IL2 ** RETURN TO SERVICE PRESSURIZER PRESSURE CHANNEL STP 1-7A 6 1&2

  • ANALOG CHANNEL OPERATIONAL TEST, PRESSURIZER LEVEL CHANNELS-STP l-7B 5 1&2
  • CHANNEL CALIBRATION - PRESSURIZER LEVEL CHANNELS PROTECTION - REMOTE SHUTDOWN & POST-ACCIDENT MONITORING

! FUNCTIONS j STP l-781 9 1&2 *** REMOVAL FROM SERVICE PRESSURIZER LEVEL CHANNEL STP l-7B2 5 1&2

  • CALIBRATION ANALOG ELECTRONICS, PRESSURIZER' LEVEL-

! PROTECTION CHANNELS ! STP I-783 7 1&2 *** CALIBRATION - PRESSURIZER LEVEL TRANSMITTER STP l-785 ! 6 1&2

  • RETURN TO SERVICE PRESSURIZER LEVEL CHANNELS  ;

l STP l-8A 17 1&2

  • ANALOG OPERATIONAL TEST REACTOR COOLANT FLOW CHANNELS.  !

STP I-8B 7 1&2 ' ( *CAllBRATION OF~ REACTOR COOLANT FLOW CHANNELS PROTECTION FUNCTIONS STP I-8B1 7 1&2

  • REMOVAL OF REACTOR COOLANT. FLOW CHANNEL FROM SERVICE STP I-882 11 1&2 *CAllBRATION OF REACTOR COOLANT FLOW PROTECTION & CHANNELS STP l-885 5 1&2
  • REINSTATEMENT OF REACTOR COOLANT FLOW CHANNELS TO SERVICE-
)
                                                                                                    \

l 8

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS ) NUMBER REV UNIT TITLE 'i Oz=an===mz=mz=s saa as=n zzzzzmammazazzazusammansammassamasamamazzazzmusansammmasazz STP l-8C 5 1 **CAllBRATION AND RESPONSE TIME TESTING OF REACTOR COOLANT, ! FLOW TRANSMITTERS STP l-BC 4 2 *** CALIBRATION AND RESPONSE TIME TESTING OF REACTOR COOLANT ? FLOW TRANSMITTERS ' STP l-9A 10 1&2

  • TRIP ACTUATING DEVICE OPERATIONAL TEST 12KV UNDERVOLTAGE, UNDERFREQUENCY STP I-98 4 1&2 ** CALIBRATION - 12KV UNDERVOLTAGE AND UNDERFREQUENCY CHANNELS PROTECTION AND SAFEGUARDS FUNCTIONS STP l-10 3 1&2
  • FUNCTIONAL TEST OF RCP BREAKER CHANNELS

) STP l-11A 17 1&2

  • FUNCTIONAL TEST OF STEAM GENERATOR WATER-LEVEL PROTECTION l CHANNELS l STP I-118 7 1&2
  • CALIBRATION OF STM GENERATOR LEVEL CHANNELS PROTECTION AND l

SAFEGUARDS & POST-ACCIDENT MONITORING FUNCTIONS  ; (INCLUDING SENSOR RESPONSE TEST)- ' STP l-1181 10 1&2 *** REMOVAL OF STEAM GENERATOR LEVEL ' CHANNEL FROM SERVICE ) SlP 1-1182 13 1&2

  • CALIBRATION OF STEAM GENERATOR LEVEL PROTECTION AND I

! SAFEGUARD CHANNELS l STP I-1183 8 1&2 - *CAllBRATION OF STEAM GENERATOR LEVEL TRANSMITTERS STP l-1184 3 1&2

  • RESPONSE TIME TESTING OF STEAM GENERATOR LEVEL l STP l-1185 B 1&2 *** REINSTATEMENT OF STEAM GENERATOR LEVEL CHANNELS TO SEf'VICE

) STP l-12A 9 1&2

  • ANALOG-CHANNEL OPERATIONAL TEST OF STEAM FLOW AND PRESSURE -l CHANNELS .

I STP 1-12B 5 1&2

  • CHANNEL CALIBRATION STEAM GENERATOR FEEDFLOW, STEAM FLOW & l PRESSURE CHANNELS-STP l-1281 14 1
  • REMOVAL FROM SERVICE STEAM GENERATOR FEEDFLOW, STEAMFLOW AND PRESSURE CHANNELS

) STP I-1281 2 2

  • REMOVAL FROM SERVICE STEAM GENERATOR FEEDFLOW, STEAMFLOW AND PRESSURE CHANNELS STP l-12B2 7 1
  • CALIBRATION ANALOG ELECTRONICS STEAM GENERATOR PRESSURE STP l-1282 1 2 *CAllBRAT10N ANALOG ELECTRONICS STEAM GENERATOR PRESSURE STP l-1283 6 1
  • CALIBRATION ANALOG ELECTRONICS STEAM GENERATOR PRESSURE (FLOW COMPENSATING)

) STP l-1283 0 2

  • CALIBRATION ANALOG ELECTRONICS STEAM GENERATOR PRESSURE-

' (FLOW COMPENSATING) . STP l-12B4 10 1

  • CALIBRATION - ANALOG ELECTRONICS STEAM GENERATOR FEEDFLOW l

STP l-1284 2 2 *CAllBRATION - ANALOG ELECTRONICS STEAM GENERATOR FEEDFLOW STP l-1285 15 1

  • CALIBRATION ANALOG ELECTRONICS STEAM GENERATOR STEAM FLOW r STP l-1285 6 2 *CAllBRATION ANALOG ELECTRONICS STEAM GENERATOR STEAM FLOW
)  STP l-12B6        15 1        *CAllBRATION - COMPARATORS STEAM GENERATOR FEEDFLOW, STEAMFLOW AND PRESSURE CHANNELS-STP 1-1286         5 2        *CAllBRATION - COMPARATORS STEAM GENERATOR FEEDFLOW,.

STEAMFLOW AND PRESSURE CHANNELS STP l-1287 20 1&2 ***CAllBRATION TRANSMITTERS STEAM GENERATOR STEAM FLOW

 )

k

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 l VOLUME 6 SURVEILLANCE TLST PROCEDURES. l l TABLE OF CONTENTS l , NUMBER REV UNIT TITLE-

  ..====...=.....     .== ..== .==.....==...=...=....................................=....

l STP l-12BB 4 1&2

  • RESPONSE TIME TEST STEAM GENERATOR FLOW TRANSMITTERS I

! STP l-1289 11 1 **CAllBRATION TRANSMITTER STEAM GENERATOR FEEDFLOW . ! STP l-1289 1 2 ** CALIBRATION TRANSMITTER STEAM GENERATOR FEEDFLOW- .

STP l-12B10 6 1&2 **CAllBRATION OF STEAM PRESSURE TRANSMITTERS 1 l STP l-12B11 2 1&2 ** RESPONSE TIME TESTING-STEAM GENERATOR PRESSURE'  :

l TRANSMITTERS ., STP l-12B12 12 'l

  • RETURN TO SERVICE STEAM GENERATOR FEEDFLOW, STEAM FLOW AND .j PRESSURE A CHANNEL STP 1-12B12 2 2
  • RETURN TO SERVICE STEAM GENERATOR FEEDFLOW,.STEAMFLOW &'

f PRESSURE CHANNELS _ l STP l-13A 3 1&2 *CAllBRATION OF AUT0STOP Oll PRESSURE CHANNELS l STP I-138 5 162

  • CALIBRATION OF TURBINE STOP' VALVE POSITION CHANNELS' t l STP l-13C 4 1&2
  • FUNCTIONAL TEST OF REACTOR TRIP FROM TURBINE TRIP f

STP I-1301 4 1&2 ** RESPONSE TIME TEST FOR SSPS TRAIN A MASTER RELAY ACTUATION TO' TURBINE TRIP STP l-13D2 4 1&2 ** RESPONSE TIME TEST FOR SSPS TRAIN B MASTER RELAY. ACTUATION T0.TURBlNE-TRIP . STP l-15A- B 1&2

  • ANALOG CHANNEL OPERATIONAL TEST OF CONTAINMENT PRESSURE ,

CHANNELS STP l-15B 4 1&?

  • CALIBRATION OF CONTAINMENT PRESSURE: CHANNELS (INCLUDING ~

SENSOR RESPONSE TLS1)

) STP l-15B1            6 1&2
  • REMOVAL OF CONTAINMENT PRESSURE CHANNEL-FROM SERVICE STP l-1582 3 1&2 *CAllBRATION PROCEDURES (PROTECTION AND SAFEGUARDS) FOR CONTAINMENT PRESSURE CHANNELS

! STP l-1553 3 IL2 **CAllBRATION OF CONTAINMENT PRESSURE TRANSMITTERS l STP l-15B4 4 1&2

  • RESPONSE TIME TESTING OF CONTAINMENT PRESSURE TRANSMITTERS L STP l-1585 5 1&2
  • REINSTATEMENT OF CONTAINMENT PRESSURE CHANNELS- ,

) STP l-16Al 11 1&2

  • REMOVAL FROM SERVICE OF THE SSPS FOR ACTUATION LOGIC- -

TESTING DURING MODES.1, 2, 3 OR 4-l

TP l-16:2 8 1&2 ' ACTUATION LOGIC TEST OF PROTECTION SYSTEM LOGIC, INCLUDING MASTER RELAYS AND REACTOR-TRIP BREAKERS (MODE 1,'2, 3, OR ,
4) . . . .

STP l-16A2B B 1&2

  • ACTUATION LOGIC TEST OF PROTECTION SYSTEM LOGIC,-INCLUDING' '

) MASTER RELAYS AND REACTOR TRIP BREAKERS (MODE ~1, 2, 3 OR , i 4) l STP l-16A3 9 1&2

  • REINSTATEMENT OF THE SSPS AFTER ACTUATION LOGIC TESTING-l AND/0R MAINT DURING MODES 1,2,3 OR 4' l STP 1-168 13 1 *** TESTING OF SAFETY INJECTION RESET TIMER AND SLAVE RELAY I K602

) STP l-16B 0 2 *** TESTING OF SAFETY INJECTION RESET. TIMER AND SLAVE RELAY K602 STP l-16C 13 1&2

  • TRIP ACTUATING DEVICE OPERATIONALLTEST.0F MANUAL' '

INITIATION AND BLOCKING REACTOR PROTECTION AND ENGINEERED < SAFEGUARDS

22 JUL 93 DIABLO CANYON POWER PLANT. UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   =============== === ==== = = = = = = = = = = = = = = = = = = = = . . . . . . . . . . . . . . . . . . . . . . . = = = . . . . . = = = = = = =

STP 1-1601- 10 1&2

  • REMOVAL FROM SERVICE OF THE'SSPS FOR' ACTUATION' LOGIC ~

TESTING & OR MAINTENANCE DURING MODE.5 OR 6 STP l-1602 11 1&2

  • ACTUATION LOGIC ~ TEST OF PROTECTION SYSTEM LOGIC ~1NCLUDINGT MASTER RELAYS &-REACTOR TRIP BREAKERS (MODES 5 OR 6)

STP l-16D3 8 1&2

  • REINSTATEMENT OF-THE SSPS AFTER ACTUATION LOGIC TESTING AND/0R MAINTENANCE DURING MODES 5 OR 6 STP l-1604 3 1&2 *RECONFIGURING AN-SSPS TRAIN IN MODES'5:0R 6 STP l-18F1 7 1&2
  • FUNCTIONAL TEST OF STEAM GENERATOR ELOWDOWN TANK VENT (RM-27) AND DISCHARGE MONITORS (RM-23) l STP l-18F2 9 1&2
  • STEAM GENERATOP BLOWDOWN TANK LIQUID AND VENT GAS MONITORS
                                     - CALIBRATION (RM-23 AND RM-27)

STP l-16M1 6 1&2

  • CONTROL ROOM AIR INTAKE MONITOR FUNCTIONAL TEST (RM-25 &'

26) STP l-18M2A 8 1&2 ** CALIBRATION 0F CONTROL ROOM VENTILATION SYSTEM INTAKE I RADIATION MONITOPS RE-25 OR RE-26 : STP l-18M2B 2 1&2

  • REMOVAL 0F CONTROL. ROOM VENTILATION INTAKE RADIATION MONITORS-FROM SERVICE (RE-25 OR RE-26)

STP l-18M2C 1 1&2

  • REINSTATEMENT OF CONTROL ROOM VENTILATION SYSTEM INTAKE RADIATION MONITORS TO SERVICE (RE-25 OR RE-26)

SIP l-18N1 7 1&2

  • FUNCTIONAL TES1 0F CONTAINMENT-HIGH. RANGE RADIATION-
)

M3NITORS RM-30, 31' 5TP l-1BP1 4 1k

  • FUNCTIONAL TEST OF. OlLY WATER SEPARATOR _ DISCHARGE LIQUID' MONITOR RM-3 STP l-18P2 3 1&2 *0lLY WATER SEPARATOR EFFLUENT MONITOR RM-3 REMOVAL FROM SERVICE STP l-18P3 0 1&2 *0lLY WATER SEPARATOR. EFFLUENT DISCHARGE-MONITOR RM-3:
}

ELECTRONIC AllGNMENT. STP l-18P4 1 1&2 *0lLY WATER SEPARATOR EFFLUENT DISCHARGE MONITOR RM-3:~ RADIATION SOURCEPRESENTATION (IS0 TOPIC) CAllBRATION STP l-18P5 0 1&2 *0ILY WATEP SEPARATOR EFFLUENT MONITOR RM-3: RETURN TO SERVI CE'- STP l-18X1 3 1&2

  • FUNCTIONAL TEST ~ 0F RMS 11 GAS DECAY TANKS RM-41, '42, 43:
)

51P l-18X2A 2 1&2

  • ELECTRONIC ALIGNMENT OF RMS II DETECTORS - GAS DECAY TANK $

(RE-41,'42,43) STP l-18X2B 2 1&2

  • GAS DECAY TANKS RM-41, RM-42, AND RM-43 REMOVAL FROM SERVICE STP l-18X2C 2 1&2
  • REINSTATEMENT TO SERVICE: GAS DECAY TANKS RM-41, RM-42 AND RM-43 STP l-18X2D 3 1&2 ** SOURCE CALIBRATION'Of THE DLTECTORS FOR -THE GAS DECAY
)

TANK MONITORS (RE-41,42, & 43) STP l-18Y1 3 1&2 ** FUNCTIONAL TEST OF THE TSC (RM-66,67,82) AND TSC~ LAB. __ (RM-68,69,&83). PARTICULATE, IODINE & NOBLE GAS RADIATION MONITORS

 )
 )
   -22 JUL 93                     DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6                     SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER          REV UNIT                            TITLE
    ====... ......= -== .... ......................................................=..==

STP l-18Y2A 2 1&2 ** ELECTRONIC ALIGNMENT OF THE TSC RM-66, 67, 82 & TSC i LABORATORY RM-68, 69, 83 PARTICULATE 10 DINE & NOBLE GAS-RACIATION NONITORS , STP I-18Y2B 2 1&2

  • REMOVAL OF TSC (RM-66, 67 & 82) & TSC LABORATORY (RM-68, 69 & 83) PARTICULATE. I0 DINE AND NOBEL GAS RADIATION MONITORS FROM SERVICE (NONQ)

STP I-18Y2C 0 1&2

  • REINSTATEMENT OF THE TSC RM-66 RM-67 RM-82 & TSC LABORATORY RM-68 RM-69 & RM-83 PARTICULATE - IODINE &

N0BLE GAS RADIATION MONITORS TO SERVICE - STP I-18Y2D 8 1&2 ** SOURCE PRESENTATION / CALIBRATION FOR RM-66, 67, 68, 69, 82 AND 83 STP I-1821 2 1&2

  • FUNCTIONAL TEST OF RMS TSC AREA RADIATION MONITORS RM-60,  !

61, 62, 63, 64, 65 , STP l-18Z2A 1 1&2 ** ELECTRONIC ALIGNMENT OF TSC AREA RADIATION MONITORS I (RE-60, 61, 62, 63 64, 65) r STP l-18Z28 2 1&2

  • REMOVAL OF TSC AREA RADIATION MONITORS FROM SERVICE l (RE-60, 61, 63, 64 AND 65) l STP I-1822C 0 1&2
  • REINSTATEMENT TO SERVICE OF TSC AREA RADIATION MONITORS RE-60, 61, 62, 63, 64, 65 STP I-1822D 4 1&2 ** CALIBRATION OF TSC AREA RADIATION MONITORS RE 60-65 STP I-18AA1 7 1&2 *FUNCT. TEST OF PLT. VENT & IODINE GRAB SAMPLER ALARA MNTRS (RM 34, 35) & POST ACCIDENT SAMPLE ROOM AREA MONITOR RM-48 STP 1-18AA2A 2 1&2
  • ELECTRONIC ALIGNMENT OF PLANT VENT & IODINE GRAB SAMPLER '

ALARA MONITORS (RE-34,35) & THE POST ACCIDENT SAMPLE ROOM  ! AREA MONITOR (RM-48)

STP I-18AA2B 1 1&2
  • REMOVAL OF PLANT VENT & IODINE GRAB' SAMPLER.ALARA MONITORS l l (RM-34,35) & THE POST ACCIDENT SAMPLE ROOM AREA MONITOR (RM-48) I STP l-18AA2C 0 1&2
  • REINSTATEMENT OF PLANT VENT & I0 DINE GRAB SAMPLER ~ALARA l MONITORS (RM-34 35) & THE. POST ACCIDENT SAMPLE. ROOM AREA MONITOR (RM-48) TO SERVICE STP l-18AA2D 3 1&2 ** RADIATION SOURCE CALIBRATION OF RM-34 & 35. PLANT VENT '

ALARA & RM-48 SENTRY SYSTEM AREA MONITOR 3 STP l-18BB1 8 1&2

  • FUNCTIONAL TEST OF THE HIGH RADIATION PLANT VENT GROSS GAMMA MONITOR (RM-29) l STP l-18BB2A 2 1&2 ** ELECTRONIC ALIGNMENT OF THE HIGH RADIATION PLANT VENT GROSS GAMMA MONITOR RE-29 )

STP I-18BB2B 2 1&2

  • REMOVAL OF THE HIGH RADIATION PLANT VENT GROSS GAMMA ,

MONITOR FROM SERVICE (RM-29) STP I-18BB2C 1 1&2

  • REINSTATEMENTS OF THE HIGH RADIATION PLANT VENT-GROSS GAMMA MONITOR TO SERVICE (RM-29)'

STP I-18BB2D 5 1&2 **CAllBRATION OF RM-29 PLANT VENT HIGH RANGE MONITOR l STP l-29 14 1&2

  • EMERGENCY SIGNALS AND COMMUNICATIONS SYSTEMS FUNCTIONAL TEST
)

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES-TABLE OF CONTENTS NUMBER REV UNIT TITLE

                 =======.....===   ... .... ..===== ..========................======............=======

I l STP l-29B 5 1&2 *NRC FTS2000 PHONE CHECK STP l-33A 14 1&2

  • REACTOR TRIP AND ESF RESPONSE TIME TEST STP l-3387 1 2 *** REACTOR TRIP AND ESF LOGIC TRAIN A RESPONSE TIME FOR REFUELING OUTAGEFIVE '

STP l-3388 1 1 *** REACTOR TRIP.AND ESF LOGIC RESPONSE. TIME FOR TEST SEQUENCE EIGHT TRAIN B . STP I-33C 5 1&2 ** TIME RESPONSE TESTING OF REACTOR TRIP BREAKERS STP I-34 9 1&2 *** FUNCTIONAL TEST: FIRE DETECTION SYSTEM STP l-34A 8 1 *** FIRE DETECTION SYSTEM DETECTOR FUNCTIONAL PANEL A STP l-34A 1 2 *** FIRE DETECTION SYSTEM DETECTOR FUNCTIONAL PANEL A STP l-34B 7 1 *** FIRE DETECTION SYSTEM DETECTOR FUNCTIONAL PANEL B STP l-34B 0 2 *** FIRE DETECTION SYSTEM DETECTOR FUNCTIONAL PANEL B STP I-34C 1 1

  • FIRE DETECTION SYSTEM SUPERVISORY FUNCTIONAL STP l-34C 0 2
  • FIRE DETECTION SYSTEM SUPERVISORY FUNCTIONAL STP I-34D 4 1 *** FIRE DETECTION SYSTEM DETECTOR FUNCTIONAL PANEL D STP l-34D 1 2 *** FIRE DETECTION SYSTEM DETECTOR FUNCTIONAL PANEL D STP l-34E 1 1&2 *** PLANT ELEVATOR SM0KE DETECTOR FUNCTIONAL TEST -

STP l-34G 4 1

  • FIRE DETECTION SYSTEM PANEL VOLTAGE TEST STP I-34G 1 2
  • FIRE DETECTION SYSTEM PANEL VOLTAGE TEST STP I-34H 3 1 *** FIRE DETECT 10N' SYSTEM RTD CAllBRATION CHECK STP I-34H 0 2 *** FIRE DETECTION SYSTEM RTD CAllBRATION CHECK STP l-34J 1 1&2 *** PORTABLE DETECTION SYSTEM INSTALLATION TESTING AND OPERATION PROCEDURE 7

STP l-34K 1 1&2 *** PORTABLE DETECTION SYSTEM MONTHLY TEST ! STP l-35A 5 1&2 **CHAN"EL FUNCTIONAL TEST CONTROL ROOM CHLORINE MONITORS STP 1-35B 2 1&2 ** CONTROL ROOM CHLORINE MONITORS MAINTENANCE i STP l-37A 1 1&2 *KINEMETRICS SMA-3 SEISMIC MONITORING SYSTEM FUNCTIONAL-TEST r l STP l-37B1 0 1&2 *CAllBRATION OF KINEMETRICS SMA-3 SEISMIC MONITORING SYSTEM l STP l-3782 0 1&2 *CAllBRATION OF ENGDAHL PSR-1200 PEAK SHOCK RECORDERS i STP l-37C 7 1&2 ** RECORDING TRIAXIAL' ACCELEROMETER CHANNEL CHECK. STP l-370 2 1&2

                                                     ~
  • PEAK ACCELERATION RECORDER MODEL PAR 400 INSPECT 10N'&

SCRIBE PLATE CHANGE 0VT . . l STP l-39 5 1&2 *CAllBRATION OF RAW WATER STORAGE'RESERV0IR LEVEL CHANNELS 36 & 37, LOOP 10-13A & B STP I-40 12 1&2

  • CHANNEL CALIBRATION MAIN CIRCULATING WATER DELTA T STP l-42 7 1&2
  • ROD POSITION DEVIATION MONITOR FUNCTIONAL TEST 1 STP I-43B 3 1&2
  • CALIBRATION OF ROD BANK INSERTION LIMIT COMPUTER  !

S1P I-4381 2 1&2

  • REMOVAL OF RAD LIMIT COMPUTER CHANNEL FROM SERVICE STP l-43B2 6 1&2 *CAllBRATION PROCEDURES (CONTROL) FOR ROD LIMIT' COMPUTER  !

. CHANNELS l STP l-43B3 3 1&2

  • REINSTATEMENT PROCEDURE FOR ROD LIMIT COMPUTER CHANNELS i

STP l-46A 12 1&2

  • CHANNEL CAllBRATION (ZERO & SPAN) CONTAINMENT HYDR 0 GEN j MONITOR CH. 82 (83)'

i l l ? l

            ~   .             ._.

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS HUMBER REV UNIT TITLE

 ===============  === ====        ===========================================================

STP l-46B 13 1&2 ** CALIBRATION TEST (EQUIPMENT VERIFICATION) CONTAINMENT-HYDROGEN MONITOR CH. 82 (83) STP l-47 7 1&2 *** WATER STORAGE TANK. LEVEL CHANNEL 40 - LOOP 16-14A. STP l-48 11 1&2 *CAllB 0F REFUELING WATER STORAGE TANK LEVEL CHANNELS 920, , 921, & 922 STP I-52 4 1 ** CALIBRATION OF CONTAINMENT TEMPERATURE CHANNELS STP I-52 4 2 **CAllBRATION OF CONTAINMENT TEMPERATURE CHANNELS STP 1-53 18 1

  • CHANNEL CAllBRATION FIRST STAGE PRESSURE CHANNEL 505 STP I-53 1 2
  • CHANNEL'CAllBRATION FIRST STAGE PRESSURE CHANNEL 505 STP l-54 14 1
  • CHANNEL CAllBRATION FIRST STAGE PRESSURE CHANNEL 506 STF 1-5; 2 2
  • CHANNEL CAllBRATION FIRST STAGE PRESSURE CHANNEL 506 STP l-55 13 1&2 ** CALIBRATION Of STEAM. GENERATOR WIDE-RANGE CHANNELS 501, 502, 503, 504 l

STP l-57 5 1&2 *CAllBRATION OF EMERGENCY BORATE FLOW CHANNEL'113 , STP l-5B 3 IL2 **CAllBRATION OF - PRIMARY WATER FLOW CHANNEL 111, LOOP 8-97A AND 8-97B STP l-62 4 1&2 ** CALIBRATION OF REACTOR CAVITY SUMP. LEVEL CHANNELS 62 STP I-65 2 1&2

  • FUNCTIONAL TEST OF CONTAINMENT FAN COOLERS COLLECTION MEASUREMENT SYSTEM STP l-66 5 1&2 **CAllBRATION OF VOLUME CONTROL TANK LEVEL CHANNEL 114 STP l-67 2 1&2 **CAllBRATION OF VOLUME CONTROL TANK LEVEL CHANNEL 112 LOOP 8-84A STP l-68C 3 1&2
  • PRESSURIZER POWER OPERATED RELIEF VALVE PCV-455C ACTUATION-TIMING  :

STP l-69C 3 1&2

  • PRESSURIZER POWER OPERATED RELIEF VALVE PCV-456 ACTUATION TIMING STF 1-72B S 1&2 ** CALIBRATION AND OPERATIONAL TEST 10F THE SEISMIC TRIP CHANNELS STP l-79A 3 1&2 ** FUNCTIONAL TEST OF WASTE GAS SYSTEM OXYGEN ANALYZERS 75 (76)

STP I-79B 5 1&2 ** CALIBRATION OF WASTE GAS SYSTEM OXYGEN ANALYZER CHANNEL 75 (76) LOOP 24-17 STP l-80A 4 1&2 *SUBC00 LED MARGlH MONITOR FUNCTIONAL CHECK STP l-80B 6 1&2 *CAllBRATION OF THE SUBC00 LED MARGIN MONITOR . I I STP l-81B 10 1&2 *CAllBRATION OF WIDE RANGE TEMPERATURE CHANNELS STP l-83A 5 1&2 *CAllBRATION OF PRESSURIZER SAFETY VALVE RELIEF LINE RTD CHANNELS 465, 457 AND 469 STP l-83B 1 1&2 *0PERATIONAL TEST OF THE ACOUSTIC MONITORS FOR PRESSURIZER SAFETY VALVE POSITION INDICATION CHANNELS 116, 117, AND ) 118 l STP I-83C 2 1&2 ** CALIBRATION OF PRESSUR12ER PORV RELIEF LINE TEMPERATURE CHANNEL 463 STP l-84A 6 1&2

  • FUNCTIONAL TEST OF CONTROL ROOM PRESSURIZATION SYSTEM CHLORINE MONITORS l

) ? l . .

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 5URVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

     ===============   === ==== ===========================================================

! STP l-84B 3 1&2 ** PRESSURIZATION SYSTEM CHLORINE' MONITORS CALIBRATION TEST-STP l-87A 3 1&2

  • FUNCTIONAL' CHECK OF THE REACTOR VESSEL LEVEL l

INSTRUMENTATION SYSTEM STP l-87B 0 1&2

  • CHANNEL CAL 1 BRAT 10N REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM STP l-87B1 4 1&2
  • REMOVAL FROM SERVICE REACTOR VESSEL LEVEL INSTRUMENTATION I SYSTEM l STP l-8782 4 1&2 ** REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM CAllBRATION l OF LEVEL TRANSMITTERS-l STP l-8783 2 1&2 **CAllBRATION OF ANALOG INPUT OUTPUT CHANNELS REACTOR VESSEL LEVEL INSTRUMENTATION SYSTEM STP l-87B4 1 1&2
  • RETURN TO SERVICE REACTOR VESSEL-LEVEL INSTRUMENTATION SYSTEM STP l-88A 0 1&2 **lNSTRUMENT & CONTROLS PERIODIC VALVE CHECKLIST STP l-89 4 1&2 ** CALIBRATION OF CONTAINMENT WIDE RANGE LEVEL CHANNELS'942A
                                       & 943A                                .        .

STP l-90 4 1&2 **CAllBRATION OF CONTAINMENT WIDE RANGE PRESSURE TRANSMITTER PT-938 AND PT-939 STP I-91B 11 1&2 ** CHANNEL CAllBRATION OF THE THERMOCOUPLE MONITORING SYSTEM STP l-92A 3 1&2 **AMSAC FUNCTIONAL TEST STP l-92B 1 1&2 ***AMSAC EXTERNAL INPUT. CALIBRATION CHECK STP I-100A 10 1.

  • CONTAINMENT AIR. PARTICULATE / GAS RADIATION MONITOR RM-11/RM-12 FUNCTIONAL TEST STP l-100A 1 2
  • CONTAINMENT AIR PARTICULATE / GAS RADIATION MONITOR. ,

RM-11/RM-12 FUNCTIONAL TEST STP I-100B 4 1

  • CALIBRATION OF CONTAINMENT AIR RAD 10 GAS MONITOR-RM STP l-100B 0 2 *CAllBRATION OF ' CONTAINMENT AIR RADIOGAS MONITOR RM-12 STP 1-100B1 6 1
  • CONTAINMENT AIR RAD 10 GAS MONITOR RM-12 REMOVAL FROM SERVICE STP 1-100B1 1 2 *** CONTAINMENT AIR. RAD 10 GAS MONITOR RM-12 REMOVAL FROM SERVICE STP l-100B2 1 1
  • ELECTRONIC AllGNMENT OF CONTAINMENT AIR RAD 10 GAS MONITOR RM-12 STP l-100B2 0 2
  • ELECTRONIC ALIGNMENT OF CONTAINMENT AIR RAD 10 GAS MONITOR v RM-12 .

STP l-100B3 3 1

  • RADIATION SOURCE PRESENTATION (ISOTOPIC) CALIBRATION OF CONTAINMENT RAD 10 GAS MONITOR RM-12 STP I-100B3 0 2
  • RADIATION SOURCE PRESENTATION (ISOTOPIC) CALIBRATION OF CONTAINMENT RAD 10 GAS MONITOR RM-12 STP l-10084 6 1
  • REINSTATEMENT 10 SERVICE: CONTAINMENT AIR RAD 10 GAS MONITOR RM-12 STP I-10084 1 2 *** REINSTATEMENT TO SERVICE: CONTAlHMENT-AIR RAD 10 GAS MONITOR RM-12 STP l-102A 5 1&2
  • FUNCTIONAL TEST OF LIQUID RADWASTE DISCHARGE. MONITOR RM-18 STP I-102B 2 1&2 *CAllBRATION OF THE LIQUID RADWASTE DISCHARGE MONITOR RM-18

1 [ - f 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 StTRVEILLANCE TEST PROCEDURES TABLE OF CONTENTS.  : NUMBER REV,. UNIT TITLE

  =============== === ====     ====..............................................=======

j STP l-102B1' 2 1&2

  • LIQUID RADWASTE DISCHARGE MONITOR RM-18: REMOVAL FROM' SERVICE f STP l-102B2 2 1&2
  • ELECTRONIC ALIGNMENT OF THE LIQUID RADWASTE DISCHARGE l MONITOR RM-18 STP l-102B3 5 1&2 *RADI ATION SOURCE PRESENTATION (ISOTOPIC) CALIBRATION OF LIQUID RADWASTE DISCHARGE MONITOR RM-18 STP l-10284 1 1&2
  • REINSTATEMENT 10 SERVICE: LIQUID RADWASTE DISCHARGE MONITOR RM-18 h- STP l-102B5 1 1&2 *SEM1 ANNUAL DISCRIMINATOR CHECK USING MULTICHANNEL ANALYZER
                                   - LIQUID RADWASTE DISCHARGE MONITOR RM-1B i   STP l-10286       2 1&2     *TO RESET HIGH ALARM SETPOINT.FOR LIQUID RADWASTE DISCHARGE-l                                   RADIATION MONITOR RM-18 l   STP l-103A        3 1&2
  • FUNCTIONAL TEST OF GAS DECAY TANK GAS DISCHARGE MONITOR I RM-22

) STP l-1038 1 1&2 *CAllBRATION OF THE GAS DECAY TANK- GAS DISCHARGE MONITOR l RM-22 l STP l-103B1 0 1&2

  • GAS DECAY TANK GAS DISCHARGE MONITOR RM-22 . REMOVAL FROM.

SERVICE STP l-103B2 0 1&2

  • GAS DECAY TANK GAS DISCHARGE MONITOR RM ELECTRONIC ALIGNMENT

) STP l-10333 3 1&2

  • RADIATION SOURCE PRESENTATION.(ISOTOPIC) CAL OF GAS DECAY TANK GAS DISCHARGE MONITOR RM-22 STP l-103B4 0 1&2
  • GAS DECAY TANK GAS DISCHARGE MONITOR RM REINSTATEMENT ,

TO SERVICE l STP I-104A 3 1&2

  • FUNCTIONAL TEST OF COMPONENT COOLING WATER PUMP HEADERS LIQUID PROCESS MONITORS RM-17A & 17B

) STP 1-104B 1 1&2

  • COMPONENT COOLING. WATER PUMP DISCHARGE LIQUID PROCESS MONITORS RM-17A &'178 - CAllBRATION STP l-10451 1 1&2
  • COMPONENT COOLING WATER PUMP DISCHARGE HEADERS LIQUID PROCESS MONITORS RM-17A & RM-178-REMOVE-FROM SERVICE STP l-104B2 2 1&2
  • COMPONENT COOLING WATER PUMP-DISCHARGE- HEADER LIQUID RAD MONITORS RM-17A & RM-17B: ELECTRONIC ALIGNMENT STP l-104B3 2 1&2
  • COMPONENT COOLING WATER PUMP DISCHARGE HEADERS LIQUID PROCESS MONITORS RM-17A & 178 -' RADIATION SOURCE PRESENTATION - ISOTOPIC - CAllBRATION STP l-104B4 1 1&2
  • REINSTATEMENT TO SERVICE-COMPONENT COOLING' WATER PUMP i DISCHARGE HEADER $L10VID PROCESS MONITORS RM-17A & 17B-l STP l-104BS 3 1&2
  • COMPONENT COOLING WATER PUMP DISCHARGING HEADERS MONITORS-

) RM-17A/17B: SEM1 ANNUAL. DISCRIMINATOR CHECK USING A MULTICHANNEL ANALY2ER l ! STP l-107A 6 1&2

  • FUNCTIONAL TEST HISCELLANE005 AREA RADI ATION MONITORS l RM-1,2,4,6,7 & 10 ..

l STP l-107B 1 1&2 *CAllBRATION OF MISCELLANE0US AREA RADIATION MONITORS l RM-1,2,4,6,7,10 ) L L

) 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS ) NUMBER REV UNIT TITLE

 =============== === ====    ===========================================================.        I l

STP I-107B1 2 1&2

  • REMOVAL FROM SERVICE - MISC-AREA RAD MONITORS RM-1, 2, 4, 6, 7 & 10

) STP I-107B2 1 1&2

  • ELECTRONIC ALIGNMENT OF MISCELLANEOUS AREA RADIATION MONITORS RM-1, 2, 4, 6, 7 & 10 l STP l-107B3 3 1&2 *RADI ATION SOURCE PRESENTATION . ISOT0Plc - CALIBRATION OF MISCELLANE0USAREA RADIATION MONITORS RM-1,2,-4, 6, 7, 8 &

10 . STP l-10784 1 1&2

  • REINSTATEMENT TO SERVICE - MISCELLANEOUS AREA RADIATION

) MONITORS RM-1, 2, 4, 6, 7, 8 & 10 STP I-108A 2 1&2

  • MISCELLANEOUS AIR PARTICULATE MONITORS RM-13 AND RM-21 FUNCTIONAL TEST STP I-108B 1 1&2
  • CALIBRATION OF MISCELLANEOUS AIR PARTICULATE MONITORS RM-13 & RM-21 STP l-108B1 2 1&2 ** MISCELLANEOUS AIR PARTICULATE MONITORS RM-13 & RM '

) REMOVAL FROM SERVICE STP l-108B2 0 1&2

  • ELECTRONIC ALIGNMENT OF MISCELLANE0US AIR PARTICULATE MONITORS RM-13 AND RM-21 STP l-10853 4 1&2 *MISCELLANE0US AIR PARTICULATE MONITORS RM-13 & RM-21:

RADIATION SOURCE PRESENTATION (ISOTOPIC) CALIBRATION STP l-108B4 2 1&2 ** REINSTATEMENT TO SERVICE: MISCELLANEOUS AIR. PARTICULATE ) MONITORS RM-13 & RM-21 STP l-108B5 2 1&2

  • MISCELLANEOUS AIR PARTICULATE MONITORS RM-13 L RM-21:

SEM1 ANNUAL DISCRIMINATOR CHECK USING MULTICHAt4NEL ANALYZER STP l-111A 4 1&2

  • FUNCTIONAL TEST OF STEAM GENERATOR BLOWDOWN SAMPLE EFFLUENT LIQUID MONITOR RM-19 q STP 1-111B 1 1&2 *CAllBRATION OF STEAM GENERATOR BLOWDOWN-SAMPLE. LIQUID

/ MONITOR RM-19 STP l-11181 2 1&2

  • STEAM GENERATOR BLOWDOWN SAMPLE. LIQUID MONITOR RM REMOVAL FROM SERVICE SlP I-11182 0 1&2
  • STEAM GENERATOR BLOWDOWN SAMPLE LIQUID MONITOR RM ! ELECTRONIC ALIGNMENT STP l-111B3 3 1&2
  • RADIATION SOURCE PRESENTATION'(ISOTOPIC) CAllBRATION OF STEAM GENERATOR BLOWDOWN SAMPLE LIQUID MONITOR.RM-19 .

2 1&2 STP l-111B4

  • REINSTATEMENT TO SERVICE - STEAM GENERATOR BLOWDOWN SAMPLE LIQUID MONITOR RM-19

! STP I-111B5 2 1&2

  • SEMI ANNUAL DISCRIMINATOR CHECK USING A MULTICHANNEL Af4ALYZER - STEAM GENERATOR BLOWDOWN -SAMPLE LIQUID MONITOR

! RM-19 ) STP l-118A 10 1&2 *** FUNCTIONAL TEST OF CONTROL ROOM PRESSURIZATION SYSTEM RADIATION MONITORS RM-51, 52, 53 AND 54 STP l-1188 2 1&2 *CAllBRATION OF CONTROL ROOM PRESSURIZATION SYSTEM RADIATION MONITORS RM-51 & 52 & 53 & 54 STP 1-118B1 2 1&2

  • REMOVAL FROM SERVICE OF THE CONTROL ROOM PRESSURIZATION i S) STEM RADIATION MONIT0RS RM-51 & 52 & 53 & 54 i

H i u

                                                                                                 \

\

l l 22 JUL 93 DIABLO CANYON POWER PLANT 1 UNITS 1 AND 2 , VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV U'N IT TITLE

 ===============   === ==== ===========================================================

STP I-11882 4 1&2 **lS0 TOPIC CAllBRATION OF CONTROL ROOM PRESSURIZATION SYSTEM RADIATION MONITORS RM-51, 52, 53 & 54 , ) STP l-11883 2 1&2

  • REINSTATING OF CONTROL ROOM PRESSURIZATION SYSTEM SUCTION
                                    . AIR RADIAT10NMONITORS RM-51 &.52 & 53 & 54 STP l-119A          8 1&2       *** FUNCTIONAL TEST:      FUEL HANDLING BUILDING AREA RADIATION MONITORS RIS-58/RIS-59 STP l-119B          2 1&2
  • CALIBRATION OF FUEL HANDLING BUILDING AREA RADIATION MONITORS RIS-58 & RIS-59

) STP I-119B1 2 1&2

  • FUEL HANDLING BUILDING AREA RADI ATION MONITOR RIS-5B &

RIS-59 REMOVAL FROM SERVICE STP l-11982 2 1&2

  • ELECTRONIC ALIGNMENT - FUEL HANDLING BUILDING AREA RADIATION MONITORS RIS-58 & RIS-59 STP l-11983 4 1&2 ** RADIATION SOURCE PRESENTATION (150.) CAL, FUEL HDLG.

BLDG. AREA RAD MONITORS RIS-58 & RIS-59 . ) STP l-11984 2 1&2

  • REINSTATEMENT TO SERVICE: FUEL HANDLING BUILDING AREA 1

RADIATION MONITOR RIS-58 AND RIS-59 STP l-120B 4 1

  • CALIBRATION OF CONTAINMENT AIR PARTICULATE MONITOR RM-11
                                                                     ~

STP l-1208 0 2

  • CALIBRATION OF CONTAINMENT AIR PARTICULATE MONITOR RM-11 '

STP l-120B1 8 1

  • CONTAINMENT AIR PARTICULATE MONITOR RM-11 REMOVAL FROM SERVICE j STP l-120B1 1 2 *** CONTAINMENT AIR PARTICULATE MONITOR RM-11 REMOVAL FROM SERVICE STP l-120B2 2 1
  • ELECTRONIC ALIGNMENT OF CONTAINMENT AIR PARTICULATE MONITOR RM-11 ,

STP l-120B2 0 2

  • ELECTRONIC AllGNMEni 0F CONTAINMENT AIR PARTICULATE MONITOR RM-11

) STP l-120B3 5 1 *RADI ATION SOURCE PRESENTATION (ISOTOPIC) CALIBRATION OF CONTAINMENT AIR PARTICULATE MONITOR RM-11 STP l-120B3 0 2

  • RADIATION SOURCE PRESENTATION (ISOTOPIC) CAllBRATION OF CONTAINMENT A]R PARTICULATE
STP l-120B4 6 1
  • REINSTATEMENT TO SERVICE: CONTAINMENT AIR. PARTICULATE l MONITOR RM-11 y STP l-120B4 1 2 *** REINSTATEMENT TO SERVICE: CONTAINMENT. AIR PARTICULATE MONITOR RM-11

! STP l-120B5 4 1 *SEMINANNUAL CHECK FOR DISCRIMINATOR DRIFT USING A I l MULTICHANNEL ANALYZER: CONTAINMENT AIR PARTICULATE DETECTOR RM-11 l STP l-120B5 0 2

  • SEMI ANNUAL CHECr. FOR DISCRIMINATOR DRIFT USING A j STP l-3-F50 1 1 MULTICHANNEL ANALYZER: CONTAINMENT AIR DETECTOR RM-11
  • AUX 1LIARY FEEDWATER TO STEAM GENERATOR 1-1 FLOW CHANNEL FT-50 CALIBRATION STP I-3-F60 0 2
  • AUXILIARY FEEDWATER TO STEAM GENERATOR 2-1 FLOW CHANNEL l FT-50 CAllBRATION
                                                            ..                       .. =.

l

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIl TITLE
     ===============  === ====  ===ma======================================================

STP l-3-F77 1 1

  • AUXILIARY FEEDWATER TO STEAM GENERATOR 1-2 FLOW CHANNEL FT-77 CAllBRATION STP l-3-F77 0 2
  • AUXILIARY FEEDWATER TO STEAM GENERATOR 2-2 FLOW CHANNEL FT-77-CAllBRATION STP l-3-F7B 1 1 *AUXILI ARY FEEDWATER TO STEAM GENERATOR l-3 FLOW CHANNEL -

FT-78 CAllBRATION STP l-3-F78 0 2

  • AUXILIARY FEECWATER TO STEAM GENERATOR 2-3 FLOW CHANNEL FT-78 CALIBRATION
,    STP l-3-F79         1   1
  • AUXILIARY FEEDWATER TO STEAM GENERATOR 1-4 FLOW CHANNEL FT-79 CAllBRATION STP l-3-F79 0 2
  • AUXILIARY FEE 0 WATER TO STEAM GENERATOR 2-4 FLOW CHANNEL. ,

FT-79 CALIBRATION STP I-4-F53.A 1 1

  • STEAM GENERATOR BLOWDOWN EFFLUENT LINE FLOW CHANNEL FT ,

FUNCTIONAL TEST ' { STP l-4-F53.A 2 2

  • STEAM GENERATOP BLOWDOWN EFFLUENT LINE FLOW CHANNEL FT-53 Fur 4CT10NAL TEST I

STP l-4-F53.B 1 1

  • STEAM GENERATOR BLOWDOWN EFFLUENT LINE FLOW CHANNEL FT-53 CAllBRATION STP l-4-F53.B 2 2
  • STEAM GENERATOR BLOWDOWN EFFLUENT LINE FLOW CHANNEL FT-53 <

CALIBRATION

 )

STP I-4-PCV19 3 1 ***10% STEAM. DUMP VALVE PCV-19 CAllBRATION STP 1-4-PCV19 2 2 ***10% STEAM DUMP VALVE PCV-19 CALIBRATION

                                                               ~

STP l-4-PCV20 2 1 ***10X STEAM DUMP VALVE PCV-20 CAllBRATION STP l-4-PCV20 2 2 ***10% STEAM DUMP VALVE PCV-20 CAtlBRATION STP I-4-PCV21 2 1 ***10% STEAM DUMP VALVE PCV-21 CALIBRATION STP l-4-PCV21 1 2 ***10% STEAM DUMP VALVE PCV-21 CALIBRATION STP l-4-PCV22 2 1 "*10% STEAM DUMP VALVE PCV-22 CAllBRATION

 )

STP l-4-PCV22 1 2 ***10% STEAM DUMP VALVE PCV-22-CAllBRAT10N STP 1-7-M455C.A 2 1 *PORV PCV-455C LTOP CHANNELS PT-403 AND TE-433B FUNCTIONAL TEST STP l-7-M455C.A 2 2 *PORV PCV-455C LTOP CHANNELS PT-403 AND TE 433B FUNCTIONAL TEST STP l-7-M455C.B 0 1 *PORV PCV-455C LTOP CHANNELS PT-403 AND TE-433B CAllBRATION -

  )

STP l-7-M455C.B 2 2 *PORV PCV-455C LTOP CHANNELS PT-403 AND TE-433B CALIBRATION STP l-7-M456.A 1 1 *PORV PCV-456 LTOP CHANNELS PT-405 AND TE-423B FUNCTIONAL TEST STP I-7-M456.A 1 2 *PORV PCV-456 LTOP CHANNELS PT-405 AND TE-423B FUNCTIONAL TEST STP l-7-M456.B 0 1 *PORV PCV-456 LTOP CHANNELS PT-405 AND TE-423B CAllBRATION

   )

STP l-7-M456.B 2 2 *PORV PCV-456 LTOP CHANNELS PT-405 AND TE-423B CAllBRATION STP l-7-PCV455C 0 1

  • PRESSURIZER PORV PCV'-455C POSITION INDICATION CHANNEL CALIBRATION STP 1-7-PCV455C 1 2
  • PRESSURIZER PORV PCV-455C POSITION INDICATION CHANNEL CAllBRATION
   )

I

22 JUL 93 DIABLO CANYON POWER PLANT UN2TS 1 AND 2 j VOLUME 6 5URVEILLANCE TEST PROCEDURES TABLE OF CONTENTS REV UNIT TITLE HUMBER

 ........=......   === ..==   ........................................................e==

STP l-7-PCV456 0 1

  • PRESSURIZER PORV PCV-456 POSITION INDICATION CHANNEL CALIBRATION STP l-7-PCV456 0 2
  • PRESSURIZER PORV PCV-456 POSITION INDICATION CHANNEL CAllBRATION STP l-7-PCV474 0 1
  • PRESSURIZER PORV PCV-474 POSITION INDICATION CHANNEL CALIBRATION STP l-7-PCV474 0 2
  • PRESSURIZER PORV PCV-474 POSITION INDICATION CHANNEL CAllBRATION STP l-8-F128 3 1
  • CHARGING PUMPS DISCHARGE HEADER FLOW CHANNEL FT-128 CAllBRATION S1P I-8-F126 2 2
  • CHARGING PUMPS DISCHARGE HEADER FLOW CHANNEL FT-128 CAllBRATION STP l-9-F917 1 1
  • CHARGING PUMPS DISCHAfdE (RCS INJECTION) FLOW CHANNEL FT-917 CALIBRATION i

STP l-9-F917 1 2

  • CHARGING PUMPS DISCHARGE (RCS INJECTION) FLOW CHANNEL FT-917 CAllBRATION STP l-9-F918 0 1
  • SAFETY INJECTION PUMP 1-1 DISCHARGE FLOW CHANNEL FT-918 CAllBRATION STP l-9-F91B 0 2
  • SAFETY INJECTION PUMP 2-1 DISCHARGE FLOW CHANNEL FT-918 CALIBRATION STP l-9-F922 0 1
  • SAFETY INJECTION PUMP 1-2 DISCHARGE FLOW CHANNEL FT-922 CAllBRATION STP l-9-F922 0 2
  • SAFETY INJECTION PUMP 2-2 DISCHARGE FLOW CHANNEL FT-922 CAllBRATION STP l-9-F970A 1 1
  • RESIDUAL HEAT EXCHANGER 1-1 OUTLET NARROW RANGE FLOW CHANNEL FT-970A CAtlBRATION STP l-9-F970A 1 2
  • RESIDUAL HEAT EXCHANGER 2-1 OUTLET NARROW RANGE FLOW CHANNEL FT-970A CAllBRATION STP l-9-F970B - 1 1
  • RESIDUAL HEAT EXCHANGER 1-1 OUTLET WIDE RANGE FLOW CHANNEL FT-970B CAllBPATION "

STP l-9-F970B 1 2

  • RESIDUAL HEAT EXCHANGER 2-1 OUTLET WIDE RANGE FLOW CHANNEL FT-970B CALIBRATION STP l-9-F971A 1 1
  • RESIDUAL HEAT EXCHANGER 1-2 OUTLET NARROW RANGE FLOW f CHANNEL FT-971A CAtlBRATION

! STP l-9-F971A 1 2

  • RESIDUAL HEAT EXCHANGER 2-2 OUTLET NARROW RANGE FLOW CHANNEL FT-971A CAllBRATION STP l-9-F9718 1 1
  • RESIDUAL HEAT EXCHANGER 1-2 OU ET WIDE RANGE FLOW LHANNEL l

FT-971B CAllBPATION l , STP l-9-F9718 1 2

  • RESIDUAL HEAT EXCHANGER i-2 OUTLET WIDE RANGE FLOW CHANNEL FT-9718 CAllBRATION STP I-9-L920 0 1
  • REFUELING WATER STORAGE TANK 1-1 LEVEL CHANNEL LT-920 i

CALIBRATION STP l-9-L921 0 1

  • REFUELING WATER STORAGE TANK 1-1 LEVEL-CHANNEL LT-921 i CAllBRATION l

I

22 JUL ~ 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 5URVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   ............... ... .... ===................................................========

STP l-9-L940 0 1

  • CONTAINMENT RECIRCULATION SUMP NARROW RANGE LEVEL CHANNEL LT-940 CAllBRATION STP l-9-L940 0 2 *CONIAINMENT RECIRCULATION SUMP NARROW RANGE LEVEL CHANNEL LT-940 CAllBRATION STP l-9-L941 0 1
  • CONTAINMENT RECIRCULATION SUMP NARROW RANGE LEVEL CHANNEL-LT-941 CAllBRATION STP l-9-L941 1 2
  • CONTAINMENT RECIRCULATION SUMP NARROW RANGE LEVEL CHANNEL LT-941 CAllBRATION STP l-9-L950.A 0 1
  • ACCUMULATOR NARROW RANGE LEVEL CHANNELS LC-950A/B THRU LC-957A/B FUNCTIONAL STP l-9-L950.A 0 2
  • ACCUMULATOR NARROW RANGE LEVEL CHANNELS LC-950A/B THRU ,

LC-957A/B FUNCTIONAL STP l-9-L950.B 0 1 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-950 CALIBRAT10N STP l-9-L950.B 1 2 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-958 CALIBRATION i STP l-9-L951.B 0 1 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-951 CALIBRATION STP l-9-L951.B 1 2 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-951 CALIBRATION STP I-9-L952.B 0 1 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-952 CALIBRATION STP l-9-L952.B 1 2 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-952 CALIBRATION STP l-9-L953.B 0 1 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL'LT-953 CALIBRATION STP l-9-L953.B 1 2 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-953 CALIBRATION , i STP l-9-L954.B 0 1 *** ACCUMULATOR NARROW RANGE-LEVEL CHANNEL LT-954 CALIBRATION STP I-9-L954.B 1 2 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-954 CAllBRATION l STP I-9-L955.B 0 1 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-955 CAllBRATION l STP l-9-L955.B 1 2 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL'LT-955 CAllBRATION STP I-9-L956.B 0 1 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-956 CALIBRATION STP l-9-L956.B 1 2 *** ACCUMULATOR' NARROW RANGE LEVEL CHANNEL LT-956 CAllBRATION STP l-9-L957.B 0 1 *** ACCUMULATOR NARROW RANGE LEVEL CHANEL LT-957 CAllBRAT10N ? STP l-9-L957.B 1 2 *** ACCUMULATOR NARROW RANGE LEVEL CHANNEL LT-957 CAllBRATION STP l-9-L95B 0 1 *** ACCUMULATOR 1-1 WIDE RANGE LEVEL CHANNEL LT-958 CAllBRATION STP l-9-L958 1 2 *** ACCUMULATOR 2-1 WlDE RANGE LEVEL CHANNEL LT-958 CALIBRATION i STP l-9-L959 0 1 *** ACCUMULATOR 1-2 WIDE RANGE LEVEL CHANNEL LT-959 ) CAllBRATION - STP l-9-L959 1 2 *** ACCUMULATOR 2-2 WIDE RANGE LEVEL CHANNEL LT-959 CAllBRATION STP l-9-L960 0 1 *** ACCUMULATOR 1-3 WlDE RANGE LEVEL CHANNEL LT-960 CAllBRATION l STP l-9-L960 1 2 *** ACCUMULATOR 2-3 WIDE RANGE LEVEL CHANNEL LT-960 ) CAllBRATION STP l-9-L961 0 1 *** ACCUMULATOR 1-4 WIDE RANGE

  • LEVEL CHANNEL LT-961 CALIBRATION .

STP I-9-L961 1 2 *** ACCUMULATOR 2-4 WIDE. RANGE LEVEL CHANNEL LT-961 CAtlBRATION b I

o 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS HUMBER REV UNIT TITLE

 ===============  === ==== ===========================================================

STP l-9-P960.A 0 1

  • ACCUMULATOR PRESSURE CHANNEL PC-960A/B THRU PC-967A/B FUNCTIONAL STP l-9-P960.A 0 2
  • ACCUMULATOR PRESSURE CHANNEL PC-960A/B THRU PC-967A/B FUNCTIONAL STP l-9-P960.B 0 1
  • ACCUMULATOR PRESSURE CHANNEL _PT-960 CALIBRATION STP l-9-P960.B 0 2
  • ACCUMULATOR PRESSURE CHANNEL'PT-960 CALIBRATION STP I-9-P961.B 0 1
  • ACCUMULATOR PRESSURE CHANNEL PT-961 CALIBRATION STP l-9-P961.8 0 2
  • ACCUMULATOR PRESSURE CHANNEL PT-961 CALIBRATION STP l-9-P962.B 0 1
  • ACCUMULATOR PRESSURE CHANNEL PT-962 CAllBRATION STP l-9-P962.8 0 2
  • ACCUMULATOR PRESSURE CHANNEL PT-962 CALIBRATION STP l-9-P963.8 0 1
  • ACCUMULATOR PRESSURE CHANNEL'PT-963 CAllBRATION STP l-9-P963.B 0 2
  • ACCUMULATOR PRESSURE CHANNEL PT-963 CALIBRATION STP I-9-P964.B 0 1
  • ACCUMULATOR PRESSURE CHANNEL PT-964 CAllBRATION STP I-9-P964.8 0 2
  • ACCUMULATOR PRESSURE CHANNEL PT-964 CALIBRATION STP l-9-P965.B 0 1
  • ACCUMULATOR PRESSURE CHANNEL PT-965 CALIBRATION STP l-9-P965.B 0 2
  • ACCUMULATOR PRESSURE CHANNEL PT-965 CAllBRATION STP l-9-P966.6 0 1
  • ACCUMULATOR PRESSURE CHANNEL PT-966 CALIBRATION STP I-9-P966.6 0 2
  • ACCUMULATOR PRESSURE CHANNEL PT-966 CALIBRATION STP l-9-P967.B 0 1
  • ACCUMULATOR PRESSURE CHANNEL PT-967 CALIBRATION STP I-9-P967.B 0 2
  • ACCUMULATOR PRESSURE CHANNEL PT-967 CALIBRATION-STP l-19-F40 2 1
  • CONTAINMENT STRUCTURE SUMP 1-1 DISCHARGE FLOW CHANNEL FT-40 CAllBRATION STP l-19-F40 1 2
  • CONTAINMENT STRUCTURE SUMP 2-1 DISCHARGE FLOW CHANNEL FT-40 CAllBRAT10N STP l-19-F41 3 1
  • CONTAINMENT STRUCTURE SUMP 1-2 DISCHARGE FLOW CHANNEL FT-41 CAllBRATION STP l-19-F41 1 2
  • CONTAINMENT STRUCTURE SUMP 2-2 OlSCHARGE FLOW CHANNEL l

) FT-41 CAllBRATION STP 1-19-F42 0 1

  • REACTOR CAVITY SUMP 1-1 DISCHARGE FLOW CHANNEL F1-42 CAllBRATION ,

STP l-19-F42 0 2

  • REACTOR CAVITY SUMP 2-1 DISCHARGE FLOW CHANNEL FT-42 )

CALIBRATION j STP l-19-F43 0 1

  • REACTOR COOLANT DRAlH TANK 1-1 DISCHARGE FLOW CHANNEL FT-43 CAllBRATION STP l-19-F43 0 2
  • REACTOR COOLANT DRAlH TANK 2-1 DISCHARGE FLOW CHANNEL FT-43 CAllBRATION STP l-19-F243.A 1 1&2
  • LIQUID RADWASTE EFFLUENT LINE FLOW CHANNEL FIT-243 FUNCTIONAL TEST STP l-19-F243.B 1 IL2 ***LlQUID RADWASTE EFFLUENT LINE FLOW CHANNEL FIT-243

) CAllBRATION STP l-19-L60 0 1

  • CONTAINMENT STRUCTURE SUMP 1-1 LEVEL CHANNEL LT-60 CAllBRATION STP l-19-L60 0 2
  • CONTAINMENT STRUCTURE SUMP 2-1 LEVEL CHANNEL LT-60 CALIBRATION

) I

J 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   ===============              ==, ====       ======.......................=====....=............=..====

STP I-19-L61 0 1

  • CONTAINMENT STRUCTURE SUMP 1-2 LEVEL CHANNEL LT-61 CAllBRATION STP l-19-L61 0 2
  • CONTAINMENT STRUCTURE SUMP 2-2 LEVEL CHANNEL LT-61 CAllBRATION . .

STP l-27-F251.A 1 1&2 *0lLY WATER SEPARATOR SYSTEM FLOW CHANNEL FT-251 FUNCTIONAL. TEST

  • STP l-27-F251.B 0 1&2 *0lLY WATER SEPARATOR SYSTEM FLOW CHANNEL FT-251 CAllBRATION STP l-39-F12.B 2 1
  • PLANT VENT IS0 KINETIC SAMPLE SYSTEM SKID:CAllBRATION STP l-39-F12.B 3 2
  • PLANT VENT IS0 KINETIC SAMPLE SYSTEM SKID CAllBRATION I

STP 1-39-R14F.A 1 1

  • PLANT VENT NOBLE GAS RADIATION MONITOR RM-14R FUNCTIONAL '
                                                   . TEST STP l-39-R14R.A                0 2
  • PLANT VENT NOBLE GAS RADIATION MONITOR.RM-14R FUNCTIONAL TEST STP l-39-R14R.B 2 1
  • PLANT VENT DISCHARGE REDUNDANT NOBLE GAS RM-14R RADIATION MONITOR CAllBRATION .
                                                                                                                      ~

) 2 2

  • PLANT VENT DISCHARGE REDUNDANT NOBLE GAS RM-14R'RADIAT10N t STP l-39-R14R.B MONITOR CALIBRATION STP l-39-R14.A 1 1
  • PLANT VENT NOBLE GAS RADIATION MONITOR RM-14 FUNCTIONAL TEST STP l-39-R14.A 0 2
  • PLANT VENT NOBLE GAS RADIATION MONITOR RM-14 FUNCTIONAL TEST ,

) 2 1 '* PLANT VENT DISCHARGE N0BLE GAS RM-14 RADI ATION MONITOR. STP l-39-R14.B CALABRATION STP l-39-R14.B 1 2

  • PLANT VENT DISCHARGE NOBLE GAS RM-14 RADIATION MONITOR CALIBRATION l STP l-39-R14.C 1 2
  • HEAT TRACE CONTROLLER CAllBRATION PLANT-VENT RM-14/14R' Li STP 1-39-R15R.A 2 1 *CDNDENSER AIR IJECTOR DISCHARGE RM-15R FUNCTIONAL TEST

) STP l-39-R15R.A 0 2

  • CONDENSER AIR EJECTOR DISCHARGE RM-15R FUNCTIONAL TEST STP l-39-R15.A 2 1
  • CONDENSER AIR EJECTOR DISCHARGE RM-15 FUNCTIONAL TEST ,

STP l-39-R15.A 0 2

  • CONDENSER AIR EJECTOR DISCHARGE RM-15 FUNCTIONAL TEST 6 1 l l STP l-39-R15.B
  • CONDENSER AIR EJECTOR DISCHARGE RM15/15R RADIATION MONITOR CALIBRATION STP l-39-R15.B 1 2 *(OTSC 6-25-93/G0FF) CONDENSER AIR EJECTOR DISCHARGE l RM15/15R RADIATION i STP l-39-R24R.A 1 1
  • PLANT VENT 10 DINE RADIATION MONITOR RM-24R FUNCTIONAL TEST l STP l-39-R24R.A 0 2
  • PLANT VENT 10 DINE RADIAT10N' MONITOR RM-24R FUNCTIONAL TEST STP l-39-R24R.B 2 1
  • PLANT VENT DISCHARGE 10 DINE REDUNDANT RM-24R RADIATION l MONITOR CAllBRATION' j STP I-39-R24R.B 2 2
  • PLANT VENT DISCHARGE 10 DINE REDUNDANT RM-24R RADIATION MONITOR CAllBRATION-l STP l-39-R24.A 1 1
  • PLANT VENT 10DlHE RADIATION MONITOR RM-24 FUNCTIONAL ~ TEST STP l-39-R24.A 0 2
  • PLANT VENT 10 DINE RADIATION MONITOR RM-24 FUNCTIONAL TEST STP l-39-R24.B 2 1
  • PLANT VENT DISCHARGE 10 DINE RM-24 RADIATION MONITOR.

CAtlBRATION

 )

q t

l 1 ) 22 JUL 93 DIABLO CANYON POWER PLANT l UNITS 1 AND 2 j VOLUME 6 SURVEILLANCE TEST PROCEDURES l TABLE OF CONTENTS  ; ) NUMBER REV UNIT TITLE f ............... ... .... ........................................................... i STP l-39-R24.B 1 2

  • PLANT VENT DISCHARGE 10 DINE RM-24 RADIATION MONITOR CAllBRATION h 1 1
  • PLANT VENT PARTICULATE RADIATION MONITOR RM-28R FUNCTION STP I-39-R28R.A TEST STP l-39-R28R.A 0 2
  • PLANT VENT PARTICULATE RADI ATION MONITOR RM-28R FUNCTIONA TEST '

, STP l-39-R28R.B 2 1

  • PLANT VENT DISCHARGE PARTICULATE RM-28R REDUNDANT RADI ATION MONITOR CAllBRATION f STP l-39-R28R.B 2 2
  • PLANT VENT DISCHARGE PARTICULATE RM-28R REDUNDANT RADIATION MONITOR CALIBRATION STP I-39-R28R.C 2 1 *** PLANT VENT DISCHARGE REDUNDANT NORMAL RANGE IS0 KINETIC FLOW CONTROL CALIBRATION STP l-39-R28R.C 1 2
  • PLANT VENT DISCHARGE REDUNDANT NORMAL RANGE.ISOKlHETIC FLOW CONTROL CAllBRATION '

} STP l-39-R28.A 2 1

  • PLANT VENT PARTICULATE RADIATION MONITOR RM-28 FUNCTIONAL TEST STP l-39-R28.A 0 2
  • PLANT VENT PARTICULATE RADIATION MONITOR RM-28 FUNCTIONAL TEST-STP l-39-R28.B 2 1
  • PLANT VENT DISCHARGE PARTICULATE RM-28 RADIATION MONITOR l

j STP l-39-R28.B 1 2 CAllBRATION

  • PLANT VENT DISCHARGE PARTICULATE RM-28 RADIATION MONITOR CALIBRATION STP ?-39-R28.C 2 1 *** PLANT VENT DISCHARGE NORMAL RANGE SKID IS0 KINETIC FLOW r

CONTROL CAllBRATION STP l-39-R28.C 1 2

  • PLANT VENT DISCHARGE NORMAL RANGE SKID IS0 KINETIC FLOW CONTROL CALIBRATION

) STP l-39-R30 B 0 1

  • CONTAINMENT HIGH RANGE AREA MONITOR RM-30 CALIBRATION STP l-39-R30.B 0 2
  • CONTAINMENT HIGH RANGE AREA MONITOR RM-30 CALIBRATION STP I-39-R31.B 0 1
  • CONTAINMENT HIGH RANGE AREA MONITOR RM-31 CAllBRATION STP l-39-R31.B- 0 2
  • CONTAINMENT HIGH RANGE AREA MONITOR RM-31 CALIBRATION l STP l-39-R34.A 1 1
  • PLANT VENT AREA RADIATION MONITOR RM-34 FUNCTIONAL TEST STP l-39-R34.A 1 2
  • PLANT VENT AREA RADIATION MONITOR RM-34 FUNCTIONAL TEST +

STP l-39-R34.B 2 1

  • PLANT VENT AREA RADI ATION MONITOR RM-34 CALIBRATION STP l-39-R34.B 2 2
  • PLANT VENT AREA RADIATION MONITOR RM-34 CALIBRATION STP l-39-R40.A 0 1
  • PLANT VENT HIGH RANGE GRAB SAMPLER RX-40 FUNCTIONAL 1LST STP l-39-R40.A 1 2
  • PLANT VENT HIGH RANGE GRAB SAMPLER RX-40 FUNCTIONAL TEST STP l-39-R44A.A 1 1
  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44A FUNCTIONAL TEST

)- STP I-39-R44A.A 0 2

  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44A  ;

FUNCTIONAL TEST STP I-39-R44A.B 2 1

  • CONTAINMENT VENTILATION EXHAUST RM-44A RADI ATION MONITOR CALIBRATION- . .

STP l-39-R44A.B 0 2

  • CONTAINMENT VENTILATION EXHAUST RM-44A RADIM10N MONITORl CAllBRATION

) l r l

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES l TABLE OF CONTENTS NUMBER REV UNIT TITLE

      ===============   === ==== ===========================================================

STP I-39-R44A.C 4 1

  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44A TIME RESPONSE TEST STP l-39-R44A.C 4 2
  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44A TIME RESPONSE TEST STP I-39-R448.A 1 1
  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44B l

FUNCTIONAL TEST j STP l-39-R44B.A 0 2

  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44B l FUNCTIONAL TEST l STF 1-39-R44B.B 2 1
  • CONTAINMENT VENTILATION EXHAUST RM-44B RADIATION MONITOR j CAllBRATION i STF 1-39-R448.B 0 2
  • CONTAINMENT VENTILATION EXHAUST RM-448 RADIATION MONITOR I CAllBRATION STP I-39-R44B.C 4 1
  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44B TIME RESPONSE TEST-STP l-39-R448.C 3 2
  • CONTAINMENT VENTILATION EXHAUST RAD MONITOR RM-44B TIME i RESPONSE TEST STP l-39-R71.A 0 1 *** FUNCTIONAL TEST OF MAIN STEAM LINE RADIATION MONITOR RM-71 STP l-39-R71.A 0 2 *** FUNCTIONAL TEST OF MAIN STEAM LINE RADIATION MONITOR RM-71 STP l-39-R71.B 0 1 *** MAIN STEAM LINE RADIATION MONITOR RM-71 CALIBRATION STP I-39-R71.B 1 2 *** MAIN STEAM LINE RADIATION MONITOR RM-71 CAllBRATION STP l-39-R72.A 0 1 *** FUNCTIONAL TEST OF MAIN STEAM LINE RADI ATION MONITOR ,

RM-72 STP l-39-R72.A 0 2 *** FUNCTIONAL TEST OF MAIN STEAM LINE-RADI ATION MONITOR RM-72 ) STP l-39-R72.B 0 1 *** MAIN STEAM LINE RADIATION MONITOR RM-72 CALIBRATION t STP l-39-R72.8 1 2 *** MAIN STEAM LINE RADIATION MONITOR RM-72 CALIBRATION STP 1-39-R73.A 0 1 *** FUNCTIONAL TEST OF MAIN STEAM LINE RADIATION MONITOR i RM-73 STP I-39-R73.A 0 2 *** FUNCTIONAL TEST OF MAIN STEAM LINE RADIATION MONITOR i RM-73  !

 )

STP l-39-R73.B 0 1 *** MAIN STEAM LINE RADIATION HONITOR RM-73 CALIBRATION l STP l-39-R73.B 1 2 *** MAIN STEAM LINE RADIATION MONITOR RM-73 CALIBRATION STP l-39-R74.A 0 1 *** FUNCTIONAL TEST OF MAIN STEAM LINE RADIATION MONITOR. i , RM-74 l STP I-39-R74.A 0 2 *** FUNCTIONAL TEST OF MAIN STEAM LINE RADIATION MONITOR f RM-74 l I STP l-39-R74.8 0 1 *** MAIN. STEAM LINE RADIATION MONITOR.RM-74 CALIBRATION STP l-39-R74.B 1 2 *** MAIN STEAM LINE RADI ATION MONITOR- RM-74 CALIBRATION l STP I-39-RB7.B 2 1 *** PLANT VENT DISCHARGE N0BLE GAS HIGH RANGE RM-87 RADIATION MONITOR CALIBRATION ' STP l-39-RB7.B 2 2

  • PLANT VENT DISCHARGE NOBLE GAS HIGH RANGE RM-87 RADIATION; M3NITOR CAllBRATION I

l

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNil TITLE

 =============== === ====     ===========================================================

3 1&2 *** PRIMARY METEOROLOGY WIND DIRECTION, WIND SPEED, AND AIR STP l-40-M559.B TEMPERATURE / DELTA-T CAllBRATION STP l-52-M.1 2 1&2

  • EMERGENCY RESPONSE FACILITIES DATA SYSTEM FUNCTIONAL CH AND VERIFICATION STP V-2 7 1&2
  • EXERCISING AND POSITION VERIFICATION OF POWER OPERATED VALVES STP V-2Al 0 1&2
  • AUXILIARY SALTWATER CROSS CONNECT HEADER VALVES STP V-2A2 0 1&2
  • AUXILIARY SALTWATER CROSSTIE VALVE FCV-601 STP V-2A3 0 1&2
  • AUXILIARY SALTWATER DEMUSSELING VALVES STP V-2E 5 1&2 *EXERCISlNG AND POSITION VERIFICATION OF VALVES 9001A AND 9001B STP V-2B2 3 1&2 *EXERCISlNG AND POSITION VERIFICATION OF VALVES 9003A AND l

9003B STP V-2C 8 1

  • CHARGING INJECTION LINE VALVES 8803A AND 8803B STP V-2C 2 2
  • CHARGING INJEC110N LINE VALVES 8803A AND 8803B STP V-20 5 1&2 *RHR PUMP RECIRCULATION VALVES STP V-202 2 1&2
  • EXERCISING AND POSITION VERIFICATION OF VALVES 8700A AND 8700B STP V-203 1 1&2
  • EXERCISING AND POSITION VERIFICATION OF VALVES 8701 AND 8702 STP V-2E1 0 1&2
  • CONTAINMENT VENTILATION VALVE FCV-661 (0C)

STP V-2E2 0 1&2

  • CONTAINMENT VENTILATION VALVE RCV-12 (OC)

STP V-2E3 0 1&2

  • CONTAINMENT VENTILATION VALVES FCV-663 AND FCV-Ff 4 (OC)

STP V-2f 4 1&2

  • COMPONENT COOLING WATER VALVES STP V-2G 8 1&2
  • SPRAY ADDITIVE TANK OUTLET VALVES STP V-2H 9 1&2
  • MISCELLANEOUS AUXILIARY BUILDING VALVES

, SlP V-211 4 1&2

  • CHARGING AND LETDOWN VALVES STP V-212 3 1&2
  • CHARGING AND LETDOWN VALVES STP V-2J1 1 1&2 *0UTSIDE CONTAINMENT SAMPLE ISOLATION VALVES STP V-2J2 1 1&2 *0UTSIDE CONTAINMENT COMPONENT COOLING WATER ISOLATION VALVES STP V-2J3 4 1&2 *0UTSIDE CONTAINMENT RESIDUAL HEAT REMOVAL ISOLATION VALVES SlP V-2J4 2 1&2 *0UTSIDE CONT AINMENT STEAM GENERATOR ISOLATION VALVES STP V-235 1 1&2 *0UTSIDE CONTAINMENT RADWASTE ISOLATION VALVES STP V-2J6 5 1&2 *0UTSIDE CONTAINMENT SAFETY INJECTION AND CHARGING INJECTION ISOL ATION VALVES STP V-?J7 1 1&2 *0UTSIDE CONTAINMENT MISCELLANE0US ISOLATION VALVES STP V-2J8 0 1&2
  • EXERCISING OUTSIDE CONTAINMENT LETDOWN ISOLATION VALVE CVCS-8152

! STP V-2K 5 1&2 *(0TSC 07/15/93 - NELSON) CVCS BORAT10N VALVES FCV-110A, FCV-111A, FCV-1108B, FCV-111B, AND CVCS-8104 STP V-2L 5 1&2 *EXERCIS!NG PRESSURIZER SPRAY VALVES STP V-2M1 1 1&2

  • PRESSURIZER RELIEF TANK TO REACTOR COOLANT DRAIN TANK VALVE 8031 l

l l l

      .      -.   ~. . . .                     .. . - -           -     -     .     -             .   .     .

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS  ! l l NUMBER REV UNIT TITLE  ! E3E333333333333 EEE W3E3 5355333E55335EE53E3333333E333335ESEEEEEEEEB33SEESSEBREEEEEE l STP V-2M2 0 1&2

  • SIS HOT LEGS 1.AND 2 TEST lSOLATION l STP V-2M3 0 1&2 *RHR RETURN TO HOT LEG VALVE 8703 l STP V-2M4 0 1&2 *RCS TO EXCESS LETDOWN VALVES 8166 AND 8167 . .
                                                                                                               )

i STP V-2N1 0 1&2

  • EXERCISING STEAM GENERATOR BLOWDOWN VALVES FCV-760, FCV-761 FCV-762 FCV-763 l STP V-2N2 0 1&2
  • EXCESS LETDOWN VALVES HCV-123 AND CVCS-8143-l STP V-201 1 1&2 *lNSIDE CONTAINMENT LEAK TEST ISOLATION VALVES l STP V-202 2 1&2 *lNSIDE. CONTAINMENT COMPONENT COOLING WATER ISOLATION VALVES

! STP V-203 2 1&2. *lNSIDE CONTAINMENT SAMPLE ISOLATION VALVESs l STP V-204 1 1&2 *lNSIDE CONTAINMENT CHILLED WATER AND PRT. ISOLATION VALVES STP V-205 1 1&2 *1NSIDE' CONTAINMENT RADWASTE ISOLATION VALVES STP V-206 2 1&2

  • EXERCISING AND' POSITION VERIFICATION OF. VALVES 8982A AND 89828 l STP V-2P 3 1&2
  • EXERCISING ACCUMULATOR CHECK VALVE LEAK. TEST VALVES AND

! REACTOR VESSEL FLANGE LEAK OFF VALVE l STP V-2P1 1 1&2

  • EXERCISING ACCUMULATOR ISOLATION VALVE l STP V-20 7 1&2
  • CONTAINMENT VENTILATION VALVES (IC)

! STP V-25 7 1&2 *CVCS VALVES STP V-2T1 3 1&2

  • PRESSURIZER POWER OPERATED RELIEF VALVES

! STP V-2T2 11 1 *** EXERCISING & POSITION INDICATOR VERIFICATION OF REACTOR l VESSEL HEA3 VENT VALVES RCS-1-8078A, B, C, AND D STP V-2T2 4 2 *** EXERCISING AND POSITION INDICATOR VERIFICATION OF REACTOR VESSEL HEAD VENT VALVES RCS-2-8078A, B, C, AND D STP V-2U1A 0 1&2

  • EXERCISING S/G NO. 1 MSIV AND BYPASS VALVE STP V-201B 0 1&2
  • EXERCISING S/G NO. 1 10% STEAM DUMP VALVE PCV-19 -

STP V-2UIC 1 1&2 *EXERCISlNG S/G NO.1 FEEDWATER ISOLATION AND ~ CONTROL VALVES i STP V-2010 1 1&2

  • EXERCISING S/G NO. 1 AFW. SUPPLY VALVES LCV-106 AND LCV-110
STP V-202A 0 1&2
  • EXERCISING S/G-NO. 2 MSIV AND BYPASS VALVE STP V-2U2B 0 1&2
  • EXERCISING S/G NO. 2.10% STEAM DUMP VALVE PCV-20 l STP V-202C 0 1&2 -
  • EXERCISING S/G NO. 2 FEEDWATER ISOLATION AND CONTROL VALVES STP V-202D 1 1&2
  • EXERCISING S/G NO. 2 AFW SUPPLY VALVES LCV-107 AND LCV-111 STP V-202E O 1&2
  • EXERCISING S/G NO. 2 AFW TURBINE STEAM SUPPLY VALVE FCV-37 STP V-2U3A 0 1&2
  • EXERCISING S/G NO. 3 MSIV AND' BYPASS VALVE.

STP V-2U3B 0 1&2

  • EXERCISING S/G NO.'3 10% STEAM DUMPLVALVE PCV-21 STP V-203C 0 1&2
  • EXERCISING S/G NO. 3 FEEDWATER ISOLATION AND CONTROL VALVES STP V-203D 1 1&?
  • EXERCISING S/G NO. 3 AFW SUPPLY. VALVES LCV-108 AND LCV-115-STP V-203E O 1&2 *EXERCISlNG S/G N0. 3 AFW TURBINE STEAM SUPPLY VALVE FCV-38 STP V-204A 0 1&2
  • EXERCISING S/G NO. 4 MSIV AND BYPASS VALVE STP V-2U4B 0 1&2
  • EXERCISING 5/G NO. 4 10% STEAM DUMP VALVE PCV-22 STP V-204C 0 1&2 , *EXERCISING-5/G NO. 4 FEEDWATER ISOLATION AND CONTROL VALVES-STP V-2U4D 1 1&2
  • EXERCISING'S/G NO. 4 AFW SUPPLY VALVES LCV-109 AND LCV-113 STP V-2 USA 0' 1&2
  • EXERCISING AFW VALVES FCV-436 AND FCV-437.

STP V-2USB 0 1&2 -* EXERCISING AFW STEAM SUPPLY VALVES FCV-95 AND FCV-152 l' I

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV, UNIT TITLE

   ===============              === ====    ===========================================================

STP V-2V1 2 1&2

  • EXERCISING AND POSITION VERIFICATION OF VALVES 8804A AND 8804B STP V-2V2 2 1&2
  • EXERCISING AND POSITION VERIFICATION OF VALVES 8974A AND 8974B STP V-2W 2 1&2
  • BORIC ACID STORAGE TANK RECIRCULATION VALVES STP V-2X 12 1&2
  • EXERCISING CONTAINMENT HYDROGEN PURGl' ISOLATION VALVES STP V-2Y 11 1&2
  • REGENERATIVE HEAT EXCHANGER LETDOWN 10LET AND LETDOWN ORIFICE ISOLATION VALVES i

STP V-22 4 1&2 *RWST TO CHARGING PUMP SUCTION VALVLS STP V-3 9 1&2

  • EXERCISING SAFETY RELATED VALVES - GENEAAL PROCEDURE STP V-3El 9 1&2
  • EXERCISING VALVE FCV-110A BORIC ACID TO BLENDER STP V-3E2 3 1&2
  • EXERCISING VALVE FCV-1108 BLENDER TO CHAk31NG HEADER STP V-3E5 5 1
  • EXERCISING VALVES 8104 AND 8445, EMERGENCY BORATE VALVES STP V-3E5 1 2
  • EXERCISING VALVES 8104 AND 8445, EMERGENCY BORATE VALVES STP V-3E6 2 1&2
  • EXERCISING CVCS-FCV-128 CENTRIFUGAL CHARGING PUMP FLOW CONTROL VALVE STP V-3E7 3 1
  • VERIFICATION OF BORIC ACID FLOWPATH FROM BORIC ACID TANKS TO RCS STP V-3E7 1 2
  • VERIFICATION OF BORIC ACID FLOWPATH FROM BORIC ACID TANKS TO RCS 1 STP V-3E9 3 1 *EXERCISlNG CHARGING INJECTION LINE VALVES, SI-1-8801A AND SI-1-8801B STP V-3E9 2 2
  • EXERCISING CHARGING INJEC110N LINE VALVES, SI-2-8801A AND S1-2-8801B STP V-3E11 0 1&2
  • EXERCISING CHARGlNS INJECTION ISOLATION VALVES, SI-8803A AND SI-8803B
)   SlP V-3F1                       8 1&2
  • EXERCISING VALVE FCV-495 ASW PUMP 2 CROSSTIE VALVE STP V-3F2 8 1&2
  • EXERCISING VALVE FCV-496 ASW PUMP 1 CROSSTIE VALVE STP V-3F3 9 1&2
  • EXERCISING VALVE FCV-601, UNITS 1 AND 2 ASW CROSSTIE- l l

STP V-3F4 8 IL2

  • EXERCISING VALVE FCV-602 CCW HX NO. 1 SALTWATER INLET STP V-3F5 7 1&2
  • EXERCISING VALVE FCV-603 CCW HX NO 2 SALTWATER INLET STP V-3G1 5 1&2
  • EXERCISING FCV-410, GAS DECAY TANK TO PLANT VENT

) STP V-3H3 4 1&2

  • EXERCISING VALVE FCV-355, CCW HEADER C SUPPLY ISOLATION STP V-3H4 4 1&2 *EXERCISlNG VALVE FCV-356 CCW SUPPLY TO RCP'S AND REACTOR VESSEL SUPPOR1 COOLERS STP V-3HS 4 1&2
  • EXERCISING FCV-357, RCP THERMAL BARRIER CCW RETURN 150 OUTSIDE CONTAINMENT STP V-3H6 4 1&2
  • EXERCISING FCV-363, RCP OlL COOLER CCW RETURN ISO OUTSIDE

) CONTAINMENT STP V-3H7 4 1&2

  • EXERCISING VALVES FCV-364 & FCV-365 RHR HEAT EXCHANGER CCW I RETURN VALVES l STP V-3HB 7 1&2
  • EXERCISING FCV-430 & FCV 431, CCW HEAT EXCHANGER OUTLET ISOL VALVES ,

) )

! 22 JUL 93 DIABLO CANYON POWER PLANT l j UNITS 1 AND 2 '! VOLUME 6 SURVEILLANCE TEST PROCEDURES l t i TABLE OF CONTENTS 3 NUMBER REV UNIT TITLE

       ...........=..= ... .... ...........................................................

l STP V-3H9 6 1&2

  • EXERCISING VALVE FCV-750, RCP THERMAL BARRIER CCW RETURN ISOLATION INSIDE CONTAINMENT STP V-3H10 4 1&2
  • EXERCISING VALVE FCV-749, RCP OIL COOLER CCW RETURN ISOLATION INSIDE CONTAINMENT STP V-3H11 12 1&2
  • EXERCISING VALVES LCV-69 AND LCV-70 MAKE-UP WATER TO CCW SURGE' TANK STP V-3H12 2 1&2
  • EXERCISING RCV-16, CCW SURGE TANK VENT VALVE STP V-311 9 1&2
  • EXERCISING VALVES 8998A AND 8998B CONTAINMENT' SPRAY i

EDUCTOR CHECK VALVES STP V-312 4 1&2

  • SPRAY ADDITIVE TANK OUTLET VALVES CS-8994A AND CS-8994B STP V-313 4 1&2
  • FULL STROKE EXERCISE OF CONTAINMENT SPRAY VALVES CS-9001A AND CS-9001B S1P V-314 2 1&2
  • EXERCISING RHR OUTLET TO SPRAY HEADER VALVES 9003A AND 9003B
 >      STF V-3J1         7   1&2
  • EXERCISING THE BLOCK VALVES TO THE PRESSURIZER PORV'S VALVES RCS-8000A 80008,.8000C STP V-3J2 3 1&2
  • EXERCISING PRESSURIZER POWER OPERATED RELIEF VALVES PCV-455C 456 & 474 STP V-3K2 4 1&2
  • EXERCISING RCP SEAL RETURN ISOLATION VALVES CVCS-8100 AND CVCS-8112 STP V-3K3 3 1&2
  • EXERCISING VALVES 8141A, B, C & D RCP.NO 1 SEAL LEAK 0FF
  )

STP V-3v4 4 1&2 *EXERCISlNG VALVE CVCS-8142 REACTOR COOLANT PUMPS NO 1 SEAL BYPASS . STP V-3K5 12 1&2 *EXERCISlNG VALVES 8146 NORMAL CHARGING & 8147 ALTERNATE CHARGING AND CHECK VALVES 8378A,B,C AND 8379 A, B STP V-3K6 4 1&2

  • EXERCISING VALVES 8166 AND 8167 REACTOR COOLANT SYSTEM EXCESS LETDOWN
 )                                    *EXERCISlNG' LETDOWN ORlFICE STOP VALVE CVCS-8149A, B, AND C STF V-3K7A       11    1&2 STP V-3K7B         3   1&2
  • EXERCISING LETOOWN ISOLATION VALVE 8152 STP V-3K7C 1 1&2
  • STROKE TIMING OF PRESSURIZER LEVEL CONTROL VALVES CVCS-LCV-459, AND 460 STP V-3KB 5 1&2
  • EXERCISING VALVES 8377, 8145 & 8148 PRESSURIZER AUXILIARY SPRAY
  )
  • EXERCISING VALVES 8105 & 8106, CENTRIFUGAL CHARGING PUMP STP V-3K9 4 1&2 RECIRCULATION STP V-3K10 6 1&2
  • EXERCISING OF REFUELING WATER SUPPLY TO CHARGING PUMP SUCTION CHECK VALVE 8924 STP V-3K11 2 1&2
  • EXERCISING RWST TO CHARGING PUMP VALVES-SI-8805A AND 51-8805B
  )

STP V-3K12 0 1&2 *EXERCISlNG VCT OUTLET ISOLATION VALVES LCV-112B & LCV-112C-STP V-3K13 5 1&2 *EXERCIS!NG CVCS CHARGING ISOLATION VALVES 8107 AND 8108 STP V-3L1 11 1&2

  • EXERCISING VALVES 8802A AND 8802B, SAFETY INJECTION PUMP DISCHARGE ISOLATION TO RCS HOT LEGS-
   )

4

   )

1

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

    ==..======.....         ... ..==      ......=== .............................................====

STP V-3L2 5 1&2

  • EXERCISING VALVES 8821A & 8821B SAFETY INJECTION PUMP DISCHARGE TO RCS COLD LEGS STP V-3L3 7 1&2
  • EXERCISING VALVES 8807A & 8807B SAFETY INJECTION CHARGING PUMP SUCTION CROSSTIE STP V-3L4 6 1&2
  • EXERCISING VALVES 8808A, B C, AND D ACCUMULATOR DISCHARGE 150!ATION VALVES.

STP V-3LS 9 1&2

  • EXERCISING VALVES 8809A AND 8809B, RHR TO COLD RCS LEGS-STP V-3L6 7 1&2
  • EXERCISING VALVE-8835, SAFETY INJECTION COLD LEGS ISOLATION STP V-3L10 6 1&2
  • EXERCISING VALVES 8923A AND 8923B, SAFETY INJECTION PUMP SUCTION VALVES 5TP V-3L13 8 1&2
  • EXERCISING VALVE 8976. RWST TO SAFETY INJECTION PUMP .

STP V-3L14 7 1&2

  • EXERCISING VALVE 8980 RWST.TO RHR PUMP SUCTION STP V-3L15 5 1&2
  • EXERCISING SAFETY INJECTION PUMP RECIRCULATION:TO RWST VALVES 8974A AND 8974B STP V-3L16 1 1&2
  • EXERCISING RHR OUTLET TO SI AND CHARGING PP VALVES 8804A-AND 8804B STP V-3L17 2 1&2
  • EXERCISING CONTAINMENT RECIRC SUCTION VALVES 8982A AND 8982B STP V-3M1 5 1&2 *EXCERCISING VALVES RHR-FCV-641A AND RHR-FCV-641B..RHR. PUMP RECIRCULATION VALVES STP V-3M? 10 1&2
  • EXERCISING VALVES RHR-HCV-637 AND RHR-HCV-638 RHR HEAT EXCHANGER OUTLET' VALVES STP V-3M4 7 1&2
  • EXERCISING RHR PUMP SUCTION VALVES 8700A AND 8700B S1P V-3MS 6 1&2
  • EXERCISING VALVES RHR-8701 AND RHR-8702, REACTOR COOLANT LOOP 4 TO RHR PUMP SUCTION STP V-3M6 8 1&2 *EXERCISlNG VALVE RHR-8703, RHR TO RCS HOT LEGS l' AND 2 STP V-3M7 7 1&2
  • EXERCISING VALVES RHR-8716A AND RHR-8716B, RHR TRAIN CROSSTIE VALVES STP V-301 3 1&2
  • EXERCISING VALVES DEG-121, DEG-135 AND DEG-149 DIESEL TURB0 AIR COMPRESSOR DISCHARGE CHECK VALVES STP V-302 4 1&2
  • EXERCISING VALVES DEG-214, 225, 236, 247, 258 AND 269, l

DIESEL STARTlHG AIR COMPRESSOR DISCHARGE CHECK STP V-303 5 1&2

  • EXERCISING VALVES LCV-85 THRU 90 DIESEL-fuel Dil DAY TANK I l LEVEL CONTROL
STP V-3P1 11 1&2 *** EXERCISING MAIN FEEDWATER REGULATING VALVES AND BYPASS .

l VALVFR . j STP V-3P2 5 1&2

  • EXERCISING MAlh FEEDWATER ISOLATION VALVES FCV-438, 439, i L

440 AND 441

>     STP V-3P3                10 1
  • EXERCISING MAlb FEEDWATER CHECK VALVES-STP V-3P3 2 2
  • EXERCISE MAIN FEEDWATER CHECK VALVES STP V-3P4 7 1&2 ***EXERCISlNG AFW VALVES FOR ALTERNATE AUXILIARY FEEDWATER i SUPPLIES .

STP V-3P5 7 1&2

  • EXERCISING AND TIMING OF VALVES LCV-106 107, 108, AND 109 ,

AUXILIARY FEEDWATER PUMP. DISCHARGE I ) [

22 JUL 93 DIABLO CANYON POWER PLANT' l UNITS l'AND 2 i VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

    ===============             === ====      =======r.=============================================n=====                         ,

STP'V-3P6 8 1&.?

  • EXERCISING VALVES LCV-110, 111,'115 AND 113 AUXILIARY.

FEEDWATER' PUMP DISCHARGE STP V-301 10 1&2.

  • EXERCISING FIRE SUPPRESSION SYSTEM SECTIONAllZING._

ISOLATION. AND SUPPLY VALVESS STP V-3P1 7 1&2

  • EXERCISING 10% ATMOSPHERIC DUMP VALVES PCV-19, 20, 21,.22 i STP V-3R2 6 1&2
  • EXERCISING MAIN STEAM ISOLATION VALVES i STP V-3R3 2 1&2
  • EXERCISING STEAM GENERATOR. BLOWDOWN INSIDE-CONTAINMENT ~

ISOLATION' VALVES FCV-760, FCV-761 FCV-762 FCV-763 , STP V-3R4 1 1&2

  • EXERCISING MAIN STEAM ISOLATION BYPASS VALVES FCV-22 . -
                                                  ,FCV-23,'FCV-24 AND FCV-25 STP V-3R5                     7 1&2
  • EXERCISING STEAM SUPPLY TO AUXILIARY FEEDWATER PUMP TURBINE STOP VALVE,FCV STP V-3R6 2 1&2
  • EXERCISING STEAM SUPPLY TO AUXILIARY FEEDWATER PUMP 1 TURBINE lSOLATION VALVES,- FCV-37: AND FCV-38 STP V-351 6 1&2
  • EXERCISING-PHASE A CONTAINMENT ISOLATION VALVES 1 '

STP V-352 5 1&2-

  • EXERCISING PHASE A CONTAINMENT ISOLATION VALVES (STEAM.

GENERATOR BLOWDOWN) STP V-353 8 1&2

  • EXERCISING PHASE A CONTAINMENT ISOLATION VALVES (RCOT -

SUMP' ISOLATION) STP V-354 9 1&2

  • EXERCISING PHASE A CONTAINMENT ISOLATION VALVES.(GROUP '

K613) . STP V-355 3 1&2 *EXERCIS!NG PHASE A CONTAINMENT-ISOLATION VALVES (ECCS TEST) ?* STP V-356 0 1&2

  • EXERCISING PHASE A CONTAINMENT ISOLATION VALVE FCV-361 STP V-357 4 1
  • EXERCISING PHASE-A CONTAINMENT ISOLATION. VALVE RCS-8029' STP V-357 1 2 *EXERC",1NG PHASE A CONTAINMENT ISOLATION VALVE RCS-2-8029 - 4 STP V-358 1 1&2
  • EXERCISING PHASE A CONTAINMENT ISOLATION VALVES. .

STP V-3T1 61&2

  • EXERCISING CONTAINMENT ATMOSPHERE SAMPLING. VALVES STP V-3T3 11 1&2 *EXERCISlNG OF CONTAINMENT:H2 SAMPLE' VALVES'AND CONTAINMENT l H2 EXTERNAL RECOMBINER VALVES STP V-314 7 1&2
  • EXERCISING 0F CONTAINMENT ATMOSPHERE SAMPLE (POST LOCA) i VALVES-I STP V-3T5 5 1&2
  • EXERCISING REACTOR CAVITY SUMP SAMPLE SUPPLY ~ CONTAINMENT  !

l ISOLATION VALVES FCV-696 AND FCV-697 . J STP V-3T6 3 1&2

  • EXERCISING CONTAINMENT VENTILATION ISOLATION._ VALVES .

FCV-660, FCV-661,: FCV-662, FCV-663 FCV-664, RCV-11'& ' i= RCV-12 I STP V-301 2 .1&2

  • EXERCISE AND LEAK' CHECK 0F HYDRAZINE MIXING: CHECK VALVE. l MU-1555 STP V-3U2 5 1
  • EXERCISING VALVES 1-965, 0-968, 1-971 AND 1-1565..-MANE-UP
                                                   -WATER CHECKS' STP V-302                    7.2
  • EXERCISING VALVES 2-965, 0-970, 2-971 AND 2-1565, MAKE-UP.

WATER' CHECKS STP V-4A 13 1

  • FUNCTIONAL TEST OF RHR CHECK VALVES. .

STP V-4A 4 2

  • FUNCTIONAL TEST OF RHR_ CHECK' VALVES' -j L

1 l

l 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 UOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

   .....=.........     ... ....      .....................................................======

STP V-4B 9 1

  • FUNCTIONAL TEST OF THE ECCS CHECK VALVES AT COLD SHUTDOWN STP V-4B 3 2
  • FUNCTIONAL TEST'0F THE ECCS CHECK VALVES AT. COLD SHUTDOWN STP V-5A1 1 1&2
  • EMERGENCY CORE COOLING SYSTEM CHECK VALVE. LEAK TEST,.

POST-REFUELING

                                                               / POST-MAINTENANCE VALVES 8819 A-D AND 8956 A-D STP V-5A2             1   1&2
  • EMERGENCY CORE COOLING SYSTEM CHECK VALVE LEAK TEST, POST-REFUELING /PCST-MAINTENANCE VALVES 8948 A-D AND 8818  !

A-D STP V-5C 7 1&2

  • EMERGENCY CORE COOLING SYSTEM HOT LEG CHECK VALVE LEAK TEST '

STP V-6 9 1 *VERiflCATION OF PROPER ALIGNMENT OF PENETRATION TEST CONNECTION VALVES, SPARE INSTRUMENT LINES AND EQUIPMENT HATCH FOR CONIAINMENT INTEGRITY STP V-6 7 2

  • VERIFICATION OF PROPER ALIGNMENT OF PENETRATION TEST CONNECTION VALVES, SPARE INSTRUMENT LINES AND EQUIPMENT

! HATCH FOR CONTAINMENT ~lNTEGRITY. STP V-7B 15 1&2

  • TEST OF ENGINEERED SAFEGUARDS, VALVE-INTERLOCKS AND RHR PUMP TRIP FROM RWST LEVEL CHANNELS STP V-7C 8 1 *** LEAK TEST OF RHR SUCTION VALVES 8701 AND 8702 STP V-7C 5 2 *** LEAK TEST OF RHR SUCTION VALVES 8701 AND 8702.

STP V-70 4 1&2 *** LEAK TEST OF RHR PUMP DISCHARGE TO HOT LEG ISOLATION VALVE, RHR-8703 STP V-7E 5 1&2 *** LEAL TEST OF S1 PUMP DISCHARGE TO HOT LEG ISOLATION VALVES 8802A AND 8802B STP V-8 6 1&2 ** MAIN STEAM ISOLATION VALVE, MSIV BYPASS, AND STM. GEN BLOWDOWN VALVE TIME RESPONSE DETERMINATION STP V-9 9 1&2

  • REFUELING CVI SYSTEM OPERABILITY DEMONSTARTION

, STP V-11 7 1&2

  • CONTAINMENT ISOLAT10N PHASE B VALVES FCV-355, FCV-356, FCV-357, FCV-363 FCV-749, AND FCV-750 STP V-13A 0 1 ***CCW FLOW BALANCING STP V-13A 0 2 *CCW FLOW BALANCING STP V-14 6 1&2 ***ECCS THROTTLE VALVE POSITION VERiflCAT10N l STP V-15 8 1 ***ECCS FLOW BALANCE TEST ,

STP V-15 3 2 ***ECCS FLOW BALANCE TEST l STP V-16 4 1&2

  • CONTAINMENT PURGE VALVE ACTUATION ON A CONTAINMENT VENTILATION ISOLATION TEST SIGNAL STP V-18 6 1&2
  • CHECK VALVE INSPECTION _ . l l STP V-19 4 1&?
  • FUNCTIONAL TEST OF RHR ALARM - VALVES 8701/8702 NOT FULLY

! CLOSED IN CONJUNCTION WITH HIGH RCS PRESSURE i 5 STP V-21 1 1&2 ** LEAK TEST OF SPRA) ADDITIVE TANK OUTLET LINE. CHECK VALVES j 8998A AND 8996B STP V-23 s 0 1&2

  • HOT STR0KE TEST OF PCV-19, 20, 21 AND 22 STP V-24 0 1&2
  • LEAK TEST OF SAFETY. INJECTION PUMP RECIRCULATION VALVES 8974A AND 8974B STP V-603 11 1 *** GENERAL' CONTAINMENT ISOLATION. VALVE LEAK TESTS-

? A

22 JUL 93 DIABLO CANYOH POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

 =============== === ==== . . = = = = = = = = = = . . . . . . . . . . . . . . . . . . . . = = = = . . . . . . . . . . . . . . . . - = = = = = =

STP V-600 6 2 *** GENERAL CONTAINMENT ISOLATION VALVE LEAK TESTS STP V-619 8 1 *** PENETRATION 19 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-619 3 2 *** PENETRATION 19 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-620 1 1 *** PENETRATION 20 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-620 1 2 *** PENETRATION 20 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-621 2 1 *** PENETRATION 21 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-621 2 2 *** PENETRATION 21 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-623 7 1 *** PENETRATION 22 AND 23 CONTAINMENT ISOLATION VALVE LE AK TEST STP V-623 1 2 *** PENETRATION 22 f.ND 23 CONTAINMENT ISOLATION VALVE LEAK TEST STP V-630 12 1 *** PENETRATION 30 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-630 8 ? *** PENETRATION 30 CONTAINMENT ISOLATION VALVE LEAV TESTING STP V-631 4 1 *** PENETRATION 31 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-631 4 2 *** PENETRATION 31 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-635 13 1 *** PENETRATION 35 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-635 10 2 *** PENETRATION 35 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-641 9 1 *** PENETRATION 41, 42, 43 AND 44 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-641 5 2 *** PENETRATIONS 41, 42, 43, AND 44 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-645 13 1 *** PENETRATION 45 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-645 8 2 *** PENETRATION 45 CONTAINMENT ISOLATION VALVE LEAK TESTING l STP V-646 10 1 *** PENETRATION 46 AND 47 CONTAINMENT ISOLATION VALVE LEAK l TESTING i STP V-646 5 2 *** PENETRATION 46 AND 47 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-649 10 1 *** PENETRATION 49 CONTAINHENTL ISOLATION VALVE LEAK TESTING STP V-649 4 2 *** PENETRATION 49 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-650 9 1 *** PENETRATION 50 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-650 4 2 *** PENETRATION 50 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-651A 3 1 *** PENETRATION 51A CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-651A 3 2 *** PENETRATION 51A CONTAINMENT ISOLATION. VALVE LEAK TESTING STP V-651B B 1 *** PENETRATION 51B CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-651B 6 2 *** PENETRATION 51B CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-651C 3 1 *** PENETRATION SIC CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-651C 2 2 *** PENETRATION SIC CONTAINMENT ISOLATION VALVE LEAK TESTING l STP V-6510 2 1 *** PENETRATION 510 CONTAINMENT ISOLATION VALVE LEAK TESTING l STF V-651D 2 2 *** PENETRATION 510 CONTAINMENT ISOLATION VALVE LEAK TEST]NG STP V-652A 2 1 *** PENETRATION 52A CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-652A 4 2 *** PENETRATION 52A CONTAINMENT ISOLATION VALVE LEAK TESTING l STP V-652B 2 1 *** PENETRATION 52B CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-652B 2 2 *** PENETRATION 52B CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-652D 2 1 *** PENETRATION 520 CONTAINMENT ISOLATION VALVE LEAK TESTING i

22 JUL 93 DIABLO CANYON POWER PLANT UNITS I AND 2 VOLUME 6 SURVEILLANCE-TEST PROCEDURES TABLE OF CONTENTS I NUMBER REV,, UNIT TITLE STP V-652D 2 2 *** PENETRATION 520 CONTAlHMENT ISOLATION VALVE LEAK TESTIN STP V-654 8 1 *** PENETRATION 54 CONTAINMENT ISOLATION VALVE LEAK TESTING

)    STP V-654         4 2     *** PENETRATION 54 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-656       10 1      ***PENETRAITON 56 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-656         2   2   *** PENETRATION 56 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-657         7   1   *** PENETRATION 57 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-657         6   2   *** PENETRATION 57 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-659A        2   1   *** PENETRATION 59A CONTAINMENT ISOLATION VALVE LEAK TESTIN
)    STP V-659A        2   2   *** PENETRATION 59A CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-659B        2   1   *** PENETRATION 59B CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-659B        2   2   *** PENETRATION 59B CONTAlhMENT ISOLATION VALVE LEAK TESTING STP V-659C        2   1   ***PENTRATION 59C CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-659C        2   2   *** PENETRATION 59C CONTAINMENT ISOLATION-VALVE LEAK TESTING STP '/-661        9   1   *** PENETRATION 61 CONTAINMENT ISOLATION VALVE LEAK TESTING
)    STP V-661         0   2   *** PENETRATION 61 CONTAINMENT ISOLATION VALVE LEAK TESTlHG STP V-662         6   1    *** PENETRATION 62 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-6C2         0   2    *** PENETRATION 62 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-663         8   1    *** PENETRATION 63 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-663         1    2   *** PENETRATION 63 CONTAINMENT ISOLATION VALVE LEAK TESTlHG SlP V-668         9 1      *** PENETRATIONS 68 AND 69 CONTAINMENT ISOLATION VALVE LEAK

.) TESTING STP V-668 4 2 ***PENE'IRATIONS 68 AND 69 CONTAINME,NT ISOLATION VALVE LEAK TESTING STF V-670 8 1 *** PENETRATION 70 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-670 4 2 *** PENETRATION 70 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-671 11 1 *** PENETRATION 71 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-671 6 2 *** PENETRATION 71 CONTAINMENT ISOLATION VALVE LEAK TESTING

)

STP V-676A 2 1 ***PENTRATION 76A CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-676A 2 2 *** PENETRATION 76A CONTAINMENT ISOLATION VALVE LEAK TESTINGL STP V-676E 3 1 ***PENTRATION 76B CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-676B 3 2 *** PENETRATION 76B CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-678 7 1 *** PENETRATIONS 52 AND 78 CONTAINMENT ISOLATION VALVE LEAK TESTING

 )

STP V-678 6 2 *** PENETRATIONS 52 AND 78 CONTAINMENT ISOLATION VALVE LEAK TEST ING STP V-679 9 1 *** PENETRATION 79 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-679 6 2 *** PENETRATION 79 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-681 2 1 *** PENETRATION 81 CONTAINMENT ISOLATION VALVE LEAK TESTING

 )    STP V-681          3   2    *** PENETRATION 81 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-682A         2   1    *** PENETRATION 82A CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-682A        3   2    *** PENETRATION 82A CONTAINMENT ISOLATION VALVE LEAK TEST STP V-682B        2   1    *** PENETRATIONS 828 AND B2C CONTAINMENT ISOLATION VALVE LEAK TESTING
  )
  )

22 JUL 93 DIABLO CANYON POWER PLANT i UNITS 1 AND 2' VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

     ...............    ... ....   .........................................................==

STP V-6828 3 2 *** PENETRATIONS 82B AND 82C CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-6820 2 1 *** PENETRATIONS 82D AND 83 CONTAINMENT ISOLATION VALVE LEAK TESTING - STP V-6820 2 2 *** PENETRATIONS 82D AND 83A CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-6B3 12 1 *** PENETRATION 83 CONTAINMENT ISOLATION VALVE LEAK TESTING STP V-683 5 2 *** PENETRATION 83B CONTAINMENT ISOLATION VALVE LEAK TESTING STP P-1A 5 1&2 *(OTSC 07/21/93 - SPENCER) PERFORMANCE TEST OF SAFETY INJECTION PUMPS iTP P-1E 16 1&? *** ROUTINE SURVEILLANCE TEST OF SAFETY INJECTION PUMPS STP P-2A 2 1&2 ** PERFORMANCE OF CENTRIFUGAL CHARGING PUMPS STP P-26 15 1&2 *** ROUTINE SURVEILLANCE TEST OF CENTRIFUGAL CHARGING PUMPS STP P-3A 9 1&2 *** PERFORMANCE TEST OF RESIDUAL HEAT REMOVAL PUMPS STP P-38 22 1&2 *** ROUTINE SURVEILLANCE TEST OF RHR PUMPS STP P-4B 16 1&2 *** ROUTINE SURVEILLANCE TEST OF CONTAINMENT SPRAY PUMPS STP P-5A 8 1&2 *** PERFORMANCE TEST OF MOTOR-DRIVEN AUXILLARY FEED PUMPS ' STP P-5B 20 1&2 *** ROUTINE SURVEILLANCE TEST OF MOTOR-DRIVEN AUXILIARY FEEDWATER PUMPS .

                                                                                                      +

STP P-6A 4 1&2 **(OTSC 07/21/93 -SPENCER) PERFORMANCE TEST.0F STEAM-DRIVEN AUXILIARY FEED PUMP . STP P-6B 27 1&2 ***(0TSC 07/21/93 - NELSON) ROUTINE SURVEILLANCE TFST OF - TURBINE-DRIVEN AUXILIARY FEEDWATER PUMP STP P-6C 8 1 *0VERSPEED TRIP OF STEAM DRIVEN AUXILI ARY FEED PUMP l STP P-6C 4 2 *0VERSPEED TRIP OF STEAM DRIVEN AUXILIARY FEED PUMP STP P-7A 7 1&2 *** PERFORMANCE TEST OF AUXILIARY SALTWATER PUMP STP P-7B 24 1&2 *** ROUTINE SURVilLLANCE TEST OF AUXILIARY SALTWATER PUMPS I STP P-8A 0 1&2

  • PERFORMANCE TEST OF COMPONENT COOLING WATER PUMPS STP P-8B 24 1&2 *** ROUTINE SURVEILLANCE TEST OF COMPONENT COOLING WATER PUMP STP P-11B 4 1&2 ** SPENT FUEL POOL PUMP 1-1(2-1) AND HEAT EXCHANGER '

i PERFORMANCE VERIFICATION STP P-11C 5 1&2 *** SPENT FUEL POOL PUMP 1-2 (2-2) PERFORMANCE VERIFICATION , i STP P-12B1 4 1&2 *** ROUTINE SURVEILLANCE TEST OF DIESEL FUEL OIL TRANSFER PUMP 0-1 STP P-12B2 4 1&2 *** ROUTINE SURVEILLANCE TEST OF DIESEL FUEL OIL TRANSFER PUMP 0-2 STP P-12B3 4 1&2

  • ROUTINE SURVEILLANCE OF PORTABLE FUEL OIL TRANSFER PUMP l STP P-13A 10 1&2 ***(OTSC 07/21/93 - SPENCER) FIRE PUMPS PERFORMANCE TEST STP P-13B 17 1&2 *** FIRE PUMPS 0-1 AND 0-2 ROUTINE SURVEILLANCE I STP P-13C 3 1&2 ** FIRE PUMPS 0-3 AND 0-4 PERFORMANCE TEST STP P-14B 18 1 *** ROUTINE SURVEILLANCE TEST OF BORIC ACID TRANSFER PUMPS STP P-14B 15 2 *** ROUT.INE SURVEILLANCE TEST'0F BORIC ACID TRANSFER PUMPS )

STP P-15A 0 1&2

  • PERFORMANCE TEST OF-MAKE-UP WATER TRANSFER PUMPS STP P-15B 12 1&2 *** ROUTINE SURVEILLANCE TEST OF MAKEUP WATER TRANSFER PUMPS I

A i

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS l HUMBER REV UNIT TITLE

 =============== === ==== ===========================================================

STP P-17B 20 1&2 *** SURVEILLANCE TEST OF RECIPROCATING CHARGING PUMP l STP P-23A 2 1&2 *** ACCELERATION TIMING 0F SAFETY RELATED PUMPS ACTUATED BY SSPS TRAIN A STP P-23B 3 1&2 ** ACCELERATION TIMING OF SAFETY RELATED PUMPS ACTUATED BY SSPS TRAIN B STP P-23C 7 1&2 *** ACCELERATION TIMING OF TURBINE DRIVEN AUXILIARY ! FEEDWATER PUMP ! STP P-24 6 1&2 ***(0TSC 7/21/93-NELSON) TESTING OF THE PORTABLE LONG TERM COOLING PUMPS STP R-1A 10 1&2

  • EXERCISING FULL-LENGTH CONTROL RODS STP R-lE 13 1&2 ** ROD DROP MEASUREMENT STP R-lC 4 1&2
  • DIGITAL ROD POSITION INDICATOR FUNCTIONAL TEST STP R-281 4 1&2 *PPC OPERATOR HEAT BALANCE STP R-222 2 1&2
  • MANUAL OPERATOR HEAT BALANCE STP R-2C 8 1&2
  • DETERMINATION OF REACTOR POWER LEVEL BELOW 5%

STP R-3A 8 1&2 *USE OF FLUX MAPPING EQUIPMENT STP R-3B 7 1&2

  • FLUX MAP DATA TRANSMISSION

! STP R-3C 11 1&2

  • FLUX MAP DATA REDUCTION

! STP R-3D 12 1&2

  • ROUTINE MONTHLY FLUX MAP l STP R-3E 4 1&2 ** REPLACEMENT Of AN INCORE DETECTOR STP R-4 6 1&2
  • EVALUATION OF CCRE REACTIVITY STP R-5 5 1&2 *BURNUP TRACKING l STP R-6 5 1&2 ** LOW POWER RELOAD PHYSICS TEST l STP R-7A B 1&2
  • DETERMINATION OF MODERATOR TEMPERATURE COEFFICIENT AT HZP, BOL l STP R-7B 11 1&2
  • DETERMINATION 0F MODERATOR TEMPERATURE COEFFICIENT AT POWER ,

STP R-7C 0 1&2 ** ROD WITHDRAWAL LIMITS CALCULATION l STP R-8A 6 1&2

  • REACTOR C00LANI SYSTEM OPERATIONAL PRESSURE LEAK TEST l STP R-8C 1 1&2
  • CONTAINMENT WALKDOWN FOR EVIDENCE OF BORIC ACID LEAKAGE  !

STP R-9 1 1&2

  • DETERMINATION OF ROD POSITION USING THE MOVEABLE INCORE DETECTOR SYSTEM (MIDS) l STP R-10 6 1&2
  • REACTOR COOLANT SYSTEM LEAKAGE EVALUATION STP R-10C 9 1 ** REACTOR COOLANT SYSTEM WATER INVENTORY BALANCE STP R-10C 1 2 ** REACTOR COOLANT SYSTEM WATER INVENTORY BALANCE STP R-10D 0 1&2 *RCP #3 SEAL LEAKAGE EVALUATION STP R-11 5 1&2
  • QUADRANT POWER TILT RATIO DETERMINATION BY MOVABLE INCORE DETECTORS STP R-12 4 1&2
  • BORON CONCENTRATION DURING REFUELING STP R-13 B 1&2 ** NUCLEAR POWER RANGE INCORE/EXCORE POWER RANGE M'J LTIPLE-POINT CAllBRATION STP R-13A 1 1&2 **BEGINNING 0F CYCLE INCORE-EXCORE CALIBRATION DATA STP R-138 0 1&2
  • NUCLEAR POWER RANGE INCORE/EXCORE POWER RANGE I MULTIPLE-POINT CAllBRATION STP P-14 2 1&2
  • PERIODIC ADJUSTMENT OF FEEDWATER FLOW N0ZZLE COEFFICIENTS l

l

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES , TABLE OF CONTENTS NUMBER REV UNil TITLE

   ===============  ==4   ==== ===========================================================

STP R-15 0 1&2 ** SPENT FUEL RACK ABSORBER SURVEILLANCE STP R-17 9 1&2

  • ESTIMATED CRITICAL POSITION (ECP)

STP R-19 11 1&2

  • SHUTDOWN MARGIN DETERMINATION STP R-20 13 1&2
  • BORIC ACID INVENTORY STP R-21 1 1&2
  • REACTOR INTERNALS VIBRATION MONITORING STP R-22 2 1&2
  • THIMBLE TUBE INSPECTION PROGRAM STP R-23 8 1&2 ** DETERMINATION & UPDATE OF TARGET AXIAL FLUX DIFFERENCE STP R-24 4 1&2 ** REMOVAL AND LOADING OF 1RRADIATED REACTOR VESSEL MATERIAL SURVEILLANCE CAPSULES STP R-25 12 1&2
  • CALCULATION OF QUADRANT POWER TILT RATIO STP R-26 11 1&2 *RCS PRIMARY COOLANT FLOW MEASUREMENTS STP R-27 8 1&2 *lNCORE THERMOCOUPLES AND RCS RTD CROSS CALIBRATION STP R-28 6 1&2
  • DETERMINATION OF HIGH FLUX AT SHUTDOWN ALARM SETPOINT STP R-30 7 1&2 ** RELOAD CYCLE INITIAL CRITICALITY STP R-31 3 1&2 ** ROD' WORTH MEASUREMENTS USING ROD SWAP METHOD STP R-32 2 1&2 ** ROD WORTH MEASUREMENTS USING BORAT10N OR DILUTION STP R-40 10 1&2
  • RELOAD POWER ASCENSION TESTING STP R-41 3 1&2
  • REACTOR COOLANT SYSTEM TEMPERATURE INSTRUMENTATION DATA STP R-42 3 1&2
  • STEAM AND FEEDWATER FLOW CALIBRATION DATA STP R-43 2 1&2
  • REACTOR COOLANT SYSTEM REFERENCE TEMPERATURE DATA- '
                                                                                               ^

STP M-1 7 1&2 *** AIR TEST OF CONTAINMENT SPRAY N0ZZLES STP M-2 7 1 *** CONTAINMENT HYDROGEN PURGE VENTILATION SYSTEM - DOP AND HALIDE PENETRATION TESTS STP M-2 0 2 *** CONTAINMENT HYDROGEN PURGE VENTILATION SYSTEM - DOP AND HAL1L: PENETRATION TESTS , STP M-3A 8 lE2 ** AUXILLARY BUILDING VENTILATION SYSTEM - DOP & HAllDE PENETRATION TEST STP M-35 7 1&2 *** AUXILIARY VENTILATION SYSTEM - DAMPERS M2A AND M2B LEAK RATE TEST . STP M-3C 8 1&2 *** AUX 1LIARY BUILDING VENTILATION SYSTEM CHARC0AL PREHEATER TEST

STP M-4 14 1&2
  • ROUTINE SURVEILLANCE TEST OF THE AUXILIARY BUILDlHG SAFEGUARDS AIR FILTRATION SYSTEM STP M-5 12 1&2
  • ROUTINE SURVEILLANCE TEST OF THE FUEL HANDLING BUILDING VENTILATION SYSTEM STP M-6A 15 1&2
  • ROUTINE SURVEILLANCE TEST OF CONTROL ROOM VENTILATION SYSTEM STP M-6B 3 1&2
  • CONTROL ROOM VENTILATION SYSTEM CHARC0AL PREHEATER TEST j STP M-7 13 1&2 *** CONTAINMENT INTEGRATED LEAKAGE RATE TEST (ILRT),: TYPE A SlP M-7E O 2 *** CONTAINMENT PENETRATION VALVE LINEUP FOR THE-INTEGRATED LEAKAGE RATE TEST (ILRT)

STP M-8Al 1 1 ***0VERALL LEAK RATE TESTING OF THE PERSONNEL AIR LOCK > STP M-RAl 0 2 ***0VERALL LEAK RATE TESTING 0F THE PERSONNEL AIR LOCK STP M-8A2 0 1 ***0VERALL LEAK RATE TESTING OF THE EMERGENCY AIR' LOCK

 )

b

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE j

 =============== ===     mazz   a s = = = = = = = = = = = = = m = = = = s = = = = = === = = m m a s s ss a z z m as s a m a s a s s mu s = = = j l

STP M-BA2 0 2 ***0VERALL LEAK RATE TESTING OF THE EMERGENCY AIR LOCK l STP M-88 8 1&2 *LEAKRATE TESTING OF ELECTRICAL PENETRATIONS STP M-8C1 1 1&2

  • LEAK RATE TESTING 0F THE EQUIPMENT HATCH SEAL STP M-8C2 0 1
  • LEAK RATE TESTING OF THE FUEL TRANSFER TUBE SEAL STP M-8C2 0 2
  • LEAK RATE TESTING OF THE FUEL TRANSFER TUBE SEAL STP M-8C3 0 1
  • LEAK RATE TESTING PENETRATION 58 MINI EQUIPMENT HATCH SEAL STP M-8C3 0 2
  • LEAK RATE TESTING PENETRATION 58 MINI EQUIPMENT HATCH SEAL STP M-8C4 0 1
  • LEAK RATE TESTING 0F PENETRATION 60 MINI EQUIPMENT HATCH SEAL STP M-8C4 0 2
  • LEAK RATE TESTING OF PENETRATION 60 MINI EQUIPMENT HATCH SEAL STP M-8D 6 1
  • COMBINED TYPE 8 AND C LEAKAGE EVALUATION STP M-8D 1 2
  • COMBINED TYPE B AND C LEAKAGE EVALUATION STP M-BE1 0 1
  • PERSONNEL AIR LOCK 000R INTERLOCK VERIFICATION STP M-8El 0 2
  • PERSONNEL AIRLOCK DOOR INTERLOCK VERIFICATION STP M-SE2 0 1
  • EMERGENCY AIR LOCK 000R INTERLOCK VERIFICATION STP M-8E2 0 2
  • EMERGENCY AIRLOCK 000R INTERLOCK VERIFICATION STP M-8F1 1 1 ***ALRM LEAK RATE TESTING OF PERSONNEL AIR LOCK SEALS STP M-8Fl 1 2 ***ALRM LEAK RATE TESTING OF PERSONNEL AIR LOCK SEALS STP M-8F2 0 1 ***PLTM LEAK RATE TESTING OF PERSONNEL AIR LOCK SEALS STF M-8F2 0 2 ***PLTM LEAK RATE TESTING OF PERSONNEL AIR LOCK SEALS STP M-8C 5 1 ** LEAK RATE TESTING OF EMERGENCY AIR LOCK SEALS STP M-83 1 2 ***LE AK RATE TESTING OF EMERGENCY AIR LOCK SEALS STP M-8H 0 2
  • LEAK RATE TESTING SPARE INSTRUMENT TEST LINES STP M-9A 25 1&2 *** DIESEL ENGINE GENERATOR ROUTINE SURVEILLANCE TEST STP M-9B 11 IL2 *0VERSPEED TRIP TEST OF DIESEL GENERATORS STP M-9] 12 IL2
  • DIESEL GENERATOR LOAD REJECTION TEST STP M-9E 5 IL2
  • DIESEL GENERATOR TRIP CIRCUITRY BYPASS VERiflCATION STP M-93 16 1&2
  • DIESEL GENERATOR 24-HOUR LOAD TEST STP M-9h 6 1&2
  • DIESEL GENERATOR INTERDEPENDENCE TEST STP M-91 6 1&2
  • DIESEL GENERATOR TESTING FREQUENCY DETERMINATION STP M-9L 13 IL2
  • DIESEL GENERATOR SHUTDOWN LOCK 0UT RELAY TEST STP M-9M 5 1
  • VERIFICATION OF AUTO-CONNECTED LOADS LESS THAN 2750 KW STP M-9M 3 2
  • VERIFICATION OF AUTO-CONNECTED LOADS LESS THAN 2750 KW l STP M-9x 2 IL2
  • DIESEL GENERATOR OPERABILITY VERiflCATION STP M-9Y l 1&2 *** DETERMINATION OF DIESEL LOADING TIME ON A REAL DEMAND '

l ! SITUATION STP M-10A 8 IL2 ** DIESEL FUEL Olt STORAGE TANK INVENTORY l STP M-10B 9 IL2

  • DIESEL FUEL Oil ANALYSES l STP M-11A 8 IL2 ** MEASUREMENT OF STATION BATTERY PILOT CELL VOLTAGE AND SPECIFIC GRAVITY STP M-11B 11 1&2
  • MEASUREMENT OF STATION BATTERY VOLTAGE AND SPECIFIC GRAVITY j STP M-llc 8 1&2 ** STATION BATTERY TERMlHAL RESISTANCE MEASUREMENT AND INSPECT]ON
                                                                                                                                               )

i I

22 JUL 93 DIABLO CANYON POWER PLANT  ! l UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES-TABLE OF CONTENTS NUMBER REV UNIT TITLE l

 ............=.= ..= ....    ........=................................................=.         )

STP M-11C12 0 1 ** BATTERY TERMINAL RESISTANCE MEASUREMENT AND INSPECTION FOR STATION BATTERY 12 STP M-11C21 0 2 *** BATTERY TERMINAL RESISTANCE MEASUREMENT AND INSPECTION FOR STATION BATTERY 21 STP M-12A11 0 1 *** STATION BATTERY 11 PERFORMANCE TEST STP M-12A12 0 1 *** STATION BATTERY 12 PERFORMANCE TEST . STP M-12A13 0 1 *** STATION BATTERY 13 PERFORMANCE TEST STP M-12A21 12 *** STATION BATTERY 21 PERFORMANCE TEST STP M-l?A22 0 2 *** STATION BATTERY 22 PERFORMANCE TEST ~ STP M-12A23 0 2 *** STATION BATTERY 23 PERFORMANCE TEST STP M-12B 6 1&2 *** BATTERY CHARGER PERFORMANCE TEST STP M-12C11 0 1 ** STATION BATTERY 11 SERVICE TEST STP M-12Cl2 0 1 ** STATION BATTERY 12 SERVICE TEST STP M-12C13 1 1 *** STATION BATTERY 13 SERVICE TEST STP M-12C21 0 2 ** STATION BATTERY 21 SERVICE TEST ' STP M-12C22 1 2 *** STATION BATTERY 22 SERVICE TEST STP M-12C23 2 2 *** STATION BATTERY 23 SERVICE TEST STP M-13A 2 1&2 *0FFSITE POWER TO 4KV VITAL BUSSES STP M-13B1 4- 1&2 *ENGD SFGDS AUTO TIMERS SETTING VERF-LOADS-STARTED SSPS RELAY K608 TRAIN A STP M-13B2 4 1&2 *ENGD SFGDS AUTO TIMERS SETTING VERF LOADS STARTED SSPS RELAY K608 TRAIN B STP M-13B3 4 1&2 *ENGD SFGDS AUTO TIMERS SETTING VERF LOADS STARTED SSPS l RELAY K609 TRAIN A STP M-13B4 4 1&2 *ENGD SFGNS. AUTO TIMERS SETTING VERF-LOADS STARTED SSPS_ RELAY K-609 TRAIN B

STP M-13C 5 1&2
  • ENGINEERED SAFEGUARDS AUTOMATIC TIMERS SETTING l VERIFICATION FOR CONTAINMENT SPRAY PUMPS i

STP M-13F 8 1&2 ***4KV BUS F NON-SI AUTO-TRANSFER TEST l STP M-13G 7 1&2 ***4KV BUS G NON-SI AUT0-TRANSFER TEST 4 STP M-13H 5 1&2 ***4KV BUS H NON-SI AUTO-TRANSFER TEST STP M-15 19 1&2 *1NTEGRATED TEST 0F ENGINEERED SAFEGUARDS AND DIESEL-GENERATORS l STP M-16 6 1&2

  • SAFEGUARDS ACTIVE COMP 0NENT OPERATION BY/ SLAVE RELAY l OPERATION STP M-16A 19 1&2 *0PERATION OF TRAINS A AND B SLAVE RELAYS K603 (SAFETY INJECTION) AND K605~(PHASE A ISOLATION)'

STP M-16C 10 1&2 *0PERATION OF TRAIN-A SLAVE-RELAY K608 (SAFETY INJECTION) I STP M-16D 11 1&2 *0PERATION OF TRAIN B SLAVE RELAY K608'(SAFETY INJECTION) STP M-16E 5 1&2 *0PERATION OF TRAIN A SLAVE RELAYS K609 (SAFETY = INJECTION) K633A (MOTOR DRIVEN AFW PUMP START) STP M-16F 4 1&2 ***(0TSC 07/10/93-ROLLER) OPERATION OF TRAIN B SLAVE RELAYS K609 (SAFETY INJECTION) K633 (MOTOR DRIVEN AFW PUMP STA j

                                                                                          /

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV, UNIT TITLE

 ==...........== === .... .........................................................=.

STP M-16G 8 1&2 **0PERATION OF TRAIN A & B SLAVE RELAYS K610 AND K617 (BLOCK NON-PROTECTION GRADE PUMP STARTS) STP M-161 9 1&2 *0PERATION OF TRAINS A AND B SLAVE RELAY K606 (PHASE A CONTAINMENT ISOLATION) STP M-16] 7 1&2 *0PERATION OF TRAIN B SLAVE RELAY K612 (CONTAINHENT PHASE A ISOLATION) STP M-16K 10 1&2 *0PERATION OF SSPS TRAINS A&B SLAVE RELAY K613 (CONTAINMENT PHASE A ISOLATION) STP M-16L 8 1&2 *0PERATION OF TRAINS A AND B SLAVE RELAY K614 (PHASE A CONTAINMENT ISOLATION) STP M-16M 7 1&2 *0PERATION OF TRAIN A & B SLAVE RELAYS K622 AND K625 STP M-16N 11 1&2 *0PERATION OF TRAINS A AND B SLAVE RELAYS K632 AND K634 STP M-160 9 1&2 *0PERATION OF TRAINS A AND B SLAVE RELAY K631 (P-12 STEAM 00MP INTERLOCF) STP M-16P1 9 1&2

  • CONTINUITY TESTING OF TRAIN A/B SLAVE RELAYS K627, K628 AND K635 STP M-16P2 8 1&2
  • CONTINUITY TESTING OF SSPS TRAINS A & B SLAVE RELAYS K601,K620, K636 & K621 STP M-16P3 9 1&2
  • CONTINUITY TESTING OF SSPS TRAINS A & B SLAVE RELAYS K616 AND K623 (MAIN STEAM ISOLATION)

STP M-16P4 7 1&2

  • CONTINUITY TESTING OF SSPS TRAINS A&B SLAVE RELAYS K611, K607 & K619 STP M-1601 3 1&2
  • SLAVE RELAY FUNCTIONAL TESTING OF RCP TRIP CIRCUlTS STP M-1602 3 1&2
  • SLAVE RELAY FUNCTIONAL TEST Of UNIT TRIP 86G RELAYS STP M-16Q3 2 1&2
  • FUNCTIONAL TESTING OF BUSSES H, F AND G AUT0 TRANSFER TO STARTUP POWER STP M-16Q4 6 1&2
  • FUNCTIONAL TESTING Of MAIN TURBINE TRIP, MAIN FEEDWATER PUMP TRIP AND MAIN FEEDWATER ISOLATION VALVES STP M-16QS 5 1&2
  • FUNCTIONAL TESTING OF RCP SEAL RETURN CONTAINMENT ISOLATION VALVES 8100AND 8112 STP M-1606 3 1&2
  • FUNCTIONAL TESTING OF CCW HEADER C ISOL. VALVES FCV-355, FCV-356, FCV-363, FCV-357, FCV-749, AND FCV-750 STP M-16BA 1 1&2 *0PERATION OF TRAIN A SLAVE RELAY K604 (SAFETY INJECTION)

STP M-16BB 1 1&2 *0PERATION OF TRAIN B-SLAVE RELAY K604 (SAFETY INJECTION) STP M-16HA 1 1&2 ***0PERATION OF SSPS TRAIN A SLAVE RELAYS K644 AND K645 (CONTAINMfNT SPRAY PUMP 2) STP M-16HB 1 1&2 ***0PERATION OF SSPS TRAIN 8 SLAVE RELAYS K644 AND K645 (CONTAINMENT SPRAY PUMP 1) l STP M-17Al 2 1

  • FUNCTIONAL TEST OF THE COMMUNICATION SYSTEM STP M-17Al 0 2
  • FUNCTIONAL TEST OF THE COMMUNICATION SYSTEM STP M-17A2 3 1
  • FUNCTIONAL TEST OF THE COMMUNICATION SYSTEM IN CONTAINMENT STP M-17A2 0 2
  • FUNCTIONAL TEST OF THE COMMUNICATION SYSTEM IN CONTAlHMENT STP M-1781 3 1 *** FUNCTIONAL TEST OF EMERGENCY DC LIGHTING SYSTEM STP M-1781 3 2 *** FUNCTIONAL TEST OF EMERGENCY DC LIGHTING SYSTEM l

l l

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES

                                                                                                               ]

TABLE OF CONTENTS ) NUMBER REV UNIT TITLE

      ......=========   ... ....            ....................................................==<=

STP M-1782 2 1 *** FUNCTIONAL TEST OF EMERGENCY DC' LIGHTING SYSTEM IN i i CONTAINMENT-STP M-17B2 2 2 *** FUNCTIONAL TEST OF EMERGENCY DC LIGHTING SYSTEM IN l CONTAINMENT STP M-17B3 3 1 *** FUNCTIONAL TEST OF UNINTERRUPTIBLE POWER SUPPLY FOR-CONTROL ROOM LIGHTING SYSTEM STP M-1783 3 2 *** FUNCTIONAL TEST OF UNINTERRUPTlBLE POWER SUPPLY FOR. CONTROL ROOM LIGHTING SYSTEM STP M-1784 2 1 *** BATTERY SERVICE TEST.FOR UNINTERRUPTIBLE' POWER; SUPPLY. b BATTERY PACK FOR-CONTROL-ROOM LIGHTING SYSTEM . STP M-1784 2 2 *** BATTERY-SERVICE-TEST FOR UNINTERRUPTIBLE POWER SUPPLY i BATTERY PACK FOR CONTROL ROOM LIGHTING SYSTEM STP M-17C1 5 1&2

  • FUNCTIONAL TES1 0F THE EMERGENCY BATTERY OPERATED LIGHTING SYSTEM STP M-17C2A 1 1 *** DISCHARGE TEST OF THE EMERGENCY BATTERY OPERATED-

)- LIGHTING SYSTEM STP M-17C2A 1 2 *** DISCHARGE TEST OF THE EMERGENCY BATTERY O'PERATING LIGHTING SYSTEM-STP M-17C2B 1 1 *** DISCHARGE TEST OF THE EMERGENCY BATTERY OPERATED LIGHTING SYSTEM STP M-17C2B 1 2 *** DISCHARGE TEST OF THE EMERGENCY BATTERY OPERATED - ) LIGHTINfi SYSTEM t I STP M-17C3 1 1 ** CHECK OF THE EMERGENCY AC LIGHTING SYSTEM FOR SAFE ! SHUTDOWN ROUTE ILLUMINATION STP M-17C3 1 2 ** CHECK OF THE EMERGENCY AC LIGHTING SYSTEM FOR SAFE SHUTDOWN ROUTE ILLUMINATION STP M-1B 2 1&2

  • FUNCTIONAL TESTING OF TURBlNE TRIP FROM REACTOR TRIP (P-4)

CIRCUlT STP M-19A 10 1&2 *HALON STORAGE TANK WEIGHT & PRESSURE VERIFICATION STP M-19B 12 1&2 **HALON FIRE SUPPRESSION SYSTEM FUNCTIONAL TEST-STP M-21A 13 1&2

  • MAIN TURBINE / GENERATOR FUNCTIONAL TESTS 4

STP M-21B 10 1&2

  • MAIN TURBINE SEMI-ANNUAL OVERSPEED TESTS STP M-21C 17 1&2
  • MAIN TURBINE VALVE TESTING

) STP M-22A 2 1&2

  • FUNCTIONAL TESTING OF TURBINE TRIP FROM AMSAC OUTPUT RELAY-l ACTUATION l STP M-22B 2 1&2
  • FUNCTIONAL TESTING OF MOTOR-DRIVEN AUXILI ARY FEEDWATER l PUMPS START _AND BLOWDOWN ISOLATION FROM AMSAC OUTPUT l RELAY ACTUATION l i STP M-22C 2 1&2
  • FUNCTIONAL TESTING OF TURBINE DRIVEN AUX FEEDWATER PUMP -

) STARTS FROM AMSAC OUTPUT RELAY ACTUATION i STP M-25A 9 1&2'

  • LEAK RATE TEST FOR UNDERGROUND FUEL OIL STORAGE TANKS STP M-25B 0 1&2
  • PERFORMANCE TEST FOR TLS-250 MONITOR STP M-26 11 1&2 ***ASW SYSTEM FLOW MONITORING 1:

I o

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS ) NUMBER REV UNIT TITLE

               ===============                  === ===. = = = = = = = = = = = = = = = = = = = = = = = . . . . . . . . . . . = = = = = . . . . . . . . . . . . . = = = = = = =       ;

STP M-26A 1 1&2 ***FCV-601, ASW UNIT 1 AND 2 CROSS-TIE DIVIDING VALVE, FLOW TEST STP M-27 13 1&2 *** FUEL HANDLING SYSTEM INTERLOCK VERiflCATION AND . ) FUNCTIONAL STP M-39Al 2 1&2 *** ROUTINE SURVEILLANCE TEST OF DIESEL GENERATOR 1-1 (2-1)- ROOM CARBON DIOXIDE FIRE SYSTEM OPERATION STP M-39A2 3 1&2 *** ROUTINE SURVEILLANCE TEST OF DIESEL GENERATOR 1-2 (2-2) ROOM CARBON DIOXIDE FIRE SYSTEM OPERATION STP M-39A3 1 1&2 *** ROUTINE SURVEILLANCE TEST OF DIESEL GENERATOR 1-3 ROOM ? CARBON 010XIDEFIRE SYSTEM OPERATION-STP M-39B 10 1&2 *** ROUTINE SURVEILLANCE TEST Of CABLE SPREADING ROOM CARBON i DIOXIDE FIRESYSTEM OPERATION i STP M-39C 6 -1&2 *** ROUTINE SURVEILLANCE TEST OF TURBINE LUBE OIL. ROOM CARBON 010X1DE FIRE SYSTEM OPERATION: i 4 1&2 - STP M-39D *** ROUTINE SURVEILLANCE TEST OF' CARBON DIOXIDE HOSE REELS ) STP M-39E 1 1&2 *** ROUTINE SURVEILLANCE TEST OF TURBINE GENERATOR BEARING f

                                                                                #10 CARBON D10X1DE FIRE SYSTEM OPERATION STP M-41                           10 1                   *** FUEL. HANDLING BUILDING VENTILATION SYSTEM - 00P AND HALIDE PENETRATION TESTS-STP M-41                            0 2                   *** FUEL HANDLING BUILDING VENTILATION SYSTEM - DOP:AND l                                                                                HALIDE ~ PENETRATION TESTS                            -

) STP M-41A 0 1&2

  • MEASUREMENT OF FUEL HANDLING BUILDING RELATIVE PRESSURE

, STP M-42 5 1&2 ** LOAD TEST - MANIPULATUR CRANE & AUXILIARY HOIST , STP M-43 8 1 ** FUEL HANDLING BUILDING OVERHEAD CRANE INTERLOCK VERIFICATION STP M-43 0 2 ** FUEL HANDLING BUILDING OVERHEAD CRANE INTERLOCK 5 VERIFICATION ) STP M-45A 41 ***CONTAlHMENT INSPECTION PRIOR TO ESTABLISHING CONTAINMENT INTEGRITY STP M-45A 3 2 *** CONTAINMENT INSPECTION PRIOR TO ESTABLISHING CONTAINMENT INTEGRITY i l STP M-45B 2 1

  • CONTAINMENT INSPECTION WHEN CONTAINMENT -lHTEGRITY IS l ESTABLISHED  :/ -l '

) STP M-45B 2 2

  • CONTAINMENT INSPECTION WHEN CONTAINMENT INTEGRITY 15 l ESTABLISHE0 l STP M-45C 1 1 *0UTAGE MANAGEMENT CONTAINMENT INSPECTION-l STP M-45C 1 2 *0UTAGE MANAGEMENT CONTAINMENT-INSPECTION STP M-46 1 'l&2 **EXPLOS10 METER SURVEY OF.-GENERATOR, EXCITER.& HYDROGEN-SYSTEM

) STP M-48 8 1 *** GENERATOR AIR TEST STP M 0 2 *** GENERATOR AIR TEST STP M-51 15 1

  • ROUTINE SURVEILLANCE TEST OF CONTAINMENT FAN COOLER UNITS STP M-51 4 2
  • ROUTINE SURVEILLANCE TEST OF CONTAINMENT FAN COOLER: UNITS X

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

  =============== === ==== ===========================================================

S1P M-53 7 1&2 ** CONTROL ROOM VENTILATION SYSTEM - DOP AND HALIDE PENETRATION TESTS STP M-54 9 1&2

  • MEASUREMENT OF REACTOR COOLANT PUMP SEAL INJECTION FLOW STP M-55 5 1&2
  • RECORDING OF CYCLIC FATIGUE OR TRANSIENTS STP M-56 4 1&2
  • VERIFICATION OF FLOW PATH FROM CONTAINMENT SPRAY ADDITIVE TANK 1-1 (2-1)

STP M-60 6 1&2

  • PERIODIC INSPECTION OF ABOVEGROUND OIL TANKS STP M-63A 13 1&2
  • FIRE WATER SYSTEM TEST STP M-64 4 1&2
  • DELUGE SYSTEM FUNCTIONAL TEST STP M-65 8 1&2
  • SPRINKLER / DELUGE SYSTEM VISUAL VERIFICATION STP M-66A 0 1
  • DELUGE SYSTEM N0ZZLE PROOF TEST STARTUP TRANSFORMERS STP M-66A 0 2
  • DELUGE SYSTEM N0ZZLE PROOF TEST-STARTUP TRANSFORMERS STP M-66B 0 1
  • DELUGE SYSTEM N0ZZLE PROOF TEST MAIN AND AUXILIARY TRANSFORMERS

( STP M-66B 2 2

  • DELUGE SYSTEM N0ZZLE PROOF TEST MAIN AND AUXILIARY TRANSFORMERS STP M-67A 13 1&2
  • WEEKLY FIRE VALVE INSPECTION STP M-67B1 1 1
  • CONTAINMENT FIRE HOSE REEL STATION INSPECTION STP M-6782 1 2
  • CONTAINMENT FIRE HOSE REEL STATION INSPECTION STP M-6783 3 1
  • CONTAINMENT FIREWATER FLOW PATH VALVE INSPECTION STP M-6784 4 2
  • CONTAINMENT FIREWATER FLOW PATH VALVE INSPECTION STP M-67C 4 1&2
  • MONTHLY HOSE REEL STATION AND HYDRANT INSPECTION STP M-69A 12 1&2
  • MONTHLY FIRE EXTINGUISHER INSPECTION STP M-69B 4 162
  • MONTHLY CO2 HOSE REEL & DELUGE VALVE INSPECTION STP M-69C 4 1&2 *MONTHi" FIRE EXTINGUISHER INSPECTICN OUTSIDE THE PROTECTED AREA

$ STP M-70 15 1&2 **lNSPECTION OF FIRE BARRIER PENETRATIONS STP M-71 5 1&2 *FIPEWATER SYSTEM FLOW TEST STP M-72 2 1&2 ***EXERCIS!NG VLVS FCV-200, 201 & 203 THRU 207, FWP TURBINES, MN TURBINE BEARINGS & H2 SEAL Oil DELUGE STP M-73 2 1&2 *** AUTO START OF CCW PUMPS ON LOW PRESSURE STP M-74 2 1&? ** AUTO START OF THE ASW PUMPS ON LOW PRESSURE STP M-75 14 1&2 ***4KV VITAL BUS UNDERVOLTAGE RELAY CAllBRATION

)

STP M-76 6 1&2

  • PERIODIC TURBINE VALVE DISASSEMBLY STP M-77 10 1&2
  • SAFETY AND RELIEF VALVE TESTING STP M-7EA 11 1&2
  • SNUBBER VISUAL INSPECTION STP M-76B 10 1&2
  • SNUBBER FUNCTIONAL TESTING STP M-78C 0 1&2
  • TRANSIENT EVENT EVALUATION

) STP M-79 10 1&2 *lND00R FIRE HOSE lhSPECTION, GASKET REPLACEMENT AND RERACKING STP M-80A 7 1&2 *00TD00R FIRE HOSE ANNUAL OPERABILITY AND HYDROSTATIC TEST STP M-80B 8 1&2 *lND00R FIRE H0SE OPERABILITY AND HYDROSTATIC TEST STP M-80C 1 1&2 *LONG TERM COOLING WATER PUMP HOSE ANNUAL OPERABILITY AND HYDROSTATIC TEST ) )

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

              .....==........         ... ..==            .......................................... .........======

STP M-81A 3 1&2 *** DIESEL ENGINE GENERATOR INSPECTION (18 MONTH INTERVALS)- STP M-81B 1 1&2

  • DIESEL ENGINE GENERATOR INSPECTION 36 MONTH' INTERVALS) 1 STP M-81C 2 1&2
  • DIESEL ENGINE GENERATOR INSPECTION 54 MONTH INTERVALS)

STP M-810 0 1&2

  • DIESEL ENGINE GENERATOR INSPECTION 72 MONTH INTERVALS)

STP M-81E 1 1&2

  • DIESEL ENGINE GENERATOR INSPECTION 90 MONTH INTERVALS)

STP M-81F 0 1&2

  • DIESEL ENGINE GENERATOR INSPECTION (108 MONTH INTERVALS) ,

STP M-81G 1 1&2

  • DIESEL ENGINE GENERATOR INSPECTION-(ELECTRICAL 18-MONTH INTERVALS)

STP M-81H 0 1&2

  • DIESEL ENGINE GENERATOR INSPECTION (ELECTRICAL-36 MONTH INTERVALS) '

STP M-811 0 1L2

  • DIESEL ENGINE GENERATOR INSPECTION (ELECTRICAL 72. MONTH INTERVALS) l STP M-83A 13 IL2
  • PENETRATION OVERCURRENT PROTECTION

) STP M-83B 9 1&2

  • PENETRATION CONDUCTOR OVERCURRENT PROTECTION MAINTENANCE -

STP M-84B 5 IL2

  • MOTOR OPERATED VALVE. THERMAL OVERLOAD RELAY. CAllBRATION STP M-84F 1 1&2
  • BUS F MOTOR OPERATED VALVE THERMAL OVERLOAD BYPASS RELAY.

l TRIP ACTUATION DEVICE OPERATIONAL TEST-l STP M-84G 2 1&2

  • BUS G MOTOR OPERATED VALVE THERMAL OVERLOAD BYPASS RELAY TRIP ACTUATION DEVICE. 0PERATIONAL TEST l

STP M-84H 3 1&2

  • BUS H MOTOR OPERATED VALVE THERMAL'0VERLOAD BYPASS RELAY ,

TRIP ACTUATION DEVICE OPERATIONAL' TEST  : STF M-86 7 IL?

  • LEAK REDUCTION OF SYSTEMS OUTSIDE-CONTAINMENT LIKELY TO )

l l CONTAIN RADI0 ACTIVE MATERIALS FOLLOWING AN ACCIDEN1 (NUREG-0578-TMI-2) STP M-86A 13 1L2 *NUREG-0578: SAFETY INJECTION SYSTEM LEAK REDUCTION: STP M-86C 8 1 ***NUREG-0578: RHR PUMP 1 SUBSYSTEM LEAK REDUCTION ) STP M-86C 1 2 ***NUREG-0578: RHR PUMP 1 SUBSYSTEM LEAK REDUCTION l STP M-860 8 1 ***NUREG-0578: RHR PUMP 2 SUBSYSTEM LEAK REDUCTION l i STP M-860 1 2 ***NUREG-0578: RHR PUMP 2 SUBSYSTEM LEAK REDUCTION STP M-86E 11 1 *NUREG-0578 NSS SAMPL]NG SYSTEM LEAK REDUCTION-l STP M-86E 3 2 *NUREG-0578 NSS SAMPLING SYSTEM LEAK REDUCTION ' STP M-86F 1 2 **GASE0US RADWASTE SYSTEM LEAK REDUCTION - INITIAL PLAN j STP M-86G 7 1&2 *NUREG-0578: CHARGING SYSTEM (SUCTION) LEAK REDUCTION AND LEAK CHECK 0FCVCS-8440,-VCT OUTLET CHECK TO CHARGING , PUMPS SUCTION

l. STP M-87 1 1&2 *0PERATIONAL LEAK INVENTORY.0F SYSTEMS OUTSIDE CONTAINMENT-THAT ARE PART0F THE ECCS POST-LOCA RECIRCULATION FLOW PATHE STP M-87A 0 1&2 *SPECIAL ECCS POST-LOCA REClRCULATION PATH COMPONENT LEAKAGE MEASUREMENT
)

STP M-88A 6 1&2

  • ELECTRICAL HYDROGEN RECOMBlHERS- FUNCTIONAL TEST .(EHRS 1, 2) .

STP M-88B 3 1&2 **CAllBRATION OF TEMPERATURE INDICATORS FOR ELECTRIC' HYDROGEN RECOMBINERS (EHRS'1,2) . STP M-8BC 10 1&2 ** CHANNEL' CAllBRATION OF INTERNAL-HYDROGEN RECOMBINER POWER . METER, HEATER INSPECTION AND HEATUP TEST-

 )

? I -r- = n , -- - - , . , , , , , - - ~ - - , , - -n- - -, , ,

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 l VOLUME 6 SURVEILLANCE TEST PROCEDURES' TABLE OF CONTENTS NUMBER REV UNIT TITLE o============== === ==== =========================================================== STP M-89 16 1 *ECCS SYSTEM VENTING STP M-B9 4 2 *ECCS SYSTEM VENTING STP M-90 3 1&2 ** SURVEILLANCE OF DIABLO CANYOH BREAKWATERS STP M-91 7 1&2

  • DIESEL FUEL'OlL TRANSFER SYSTEM, PIPING AND COMPONENT INSPECTION STP M-91A 1 1&2
  • DIESEL FUEL Olt STORAGE TANKS INSPECTION AND CLEANING-STP M-92 7 1 *** LOST LOCA SAMPLING CENTER VENTILATION SYSTEM - DOP AND HALIDE PENETRATION TESTS STP M-92 0 2 *** POST LOCA SAMPLING CENTER VENTILATION SYSTEMS '- 00P AND HALIDE PENETRATION TESTS i

STP M-93A 6 1 ***18 MONTH SURVEILLANCE - CONTAINMENT FAN COOLER SYSTEM. I STP M-93A 2 2 ***18 MONTH SURVEILLANCE - CONTAINMENT ~ FAN COOLER SYSTEM STP M-938 0 IL2 *10 DINE REMOVAL UNIT FILTER = TEST STP M-94 1 1&2

  • LAUNDRY FACILITY VENTILATION - DOP PENETRATION TEST STP M-95 4 1&2
  • SOLID RADWASTE STORAGE FACILITY VENTILATION TEST STP M-96 2 1&2 **TSC VENTILA110N SYSTEMS - 00P AND HALIDE. PENETRATION TESTS l STP M-97 2 1&2
  • RESISTANCE TEMPERATURE DETECTOR BYPASS LOOP FLOW MEASUREMENT ,

STP M-98 3 1

  • COMPARISON OF FINAL FEEDWATER FLOW'N0ZZLES TO ASME FLOW N0ZZLES STP M-98 4 2
  • COMPARISON OF flNAL FEEDWATER FLOW N0ZZLES TO ASME FLOW N0ZZLES STP M-99 5 1&2 *** TEST OF BACKUP NITROGEN ACCUMULATOR SYSTEM CHARGING i HEADER FLOW CONTROL VALVE HCV-142 STP M-100 5 1&2 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO 9351A AND 9351B, RCS SAMPLE ISOLATION VALVES FOR LOOPS 1 AND 2 STP M-101 3 1 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO RCS SAMPLE l INSIDE CONTAINMENT ISOLATION VALVE 9356A l STP M-101 3 2 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO RCS SAMPLE INSIDE CONTAINMENT ISOLATION VALVE.9356A STP M-102 7 1&2 *** TEST OF BACKUP NITROGEN ACCUMULATOR SYSTEM TO SPRAY VALVE AND CHARGING VALVES 8145, 8146, AND 8147 STP M-103 3 1 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO RCS SAMPLE OUTSIDE CONTAINMENT ISOLATION VALVE 9356B STP M-103 2 2 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO RCS SAMPLE OUTSIDE CONTAINMENT ISOLATION VALVE 9356B STP M-104 7 1&2 *** TEST OF BACKUP NITROGEN ACCUMULATOR- SYSTEM TO SPRAY l VALVE BYPASS VALVE CVCS-B148 i STP M-105 6 1&2 *** TEST OF BACKUP N11ROGEN ACCUMULATOR SYSTEM TO PRESSURIZER POWER OPERATED RELIEF VALVE PCV-455C STP M-106 6 1&2 *** TEST OF BACKUP NITROGEN ACCUMULATOR SYSTEM T0 PRESSURIZER POWER OPERATED RELIEF VALVE PCV-456 STP M-107 2 1&2 ** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO FCV-364 RHR HEAT-EXCHANGER CCW RETURh VALVE

?' i

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV. UNIT TITLE j

   ===============      === ====          ===============...........................==.......========

STP M-108 2 1&2 ** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO FCV-365 RHR HEAT EXCHANGER CCW RETURN VALVE STP M-109 4 1&2 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO FCV-602, CCW HEAT EXCHANGER NO.1 SALTWATER INLET VALVE STP M-110 4 1&2 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO FCV-603, CCW HEAT EXCHANGER NO. 2 SALTWATER INLET VALVE STP M-111A 1 1 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM-T0 MAIN STEAM ISOLATION STP M-lllA 2 2 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO MAIN STEAM ISOLATION VALVE FCV-41 l STP M-lllB 1 1 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO MAIN STEAM ISOLATION VALVE FCV-42 STP M-lllB 2 2 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO MAIN STEAM ISOLATION VALVE FCV-42 l STP M-111C 1 1 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO MAIN STEAM l ISOLATION VALVE FCV-43 STP M-111C 2 2 *** TEST OF BACKUP AIR ACCUMUALTOR SYSTEM TO MAIN STEAM ISOLATION VALVE FCV-43 STP M-1110 1 1 *** TEST OF BACKUP AIR ACCUMULATOR SYSTEM TO MAIN STEAM ISOLATION VALVE FCV-44 STP M-1110 2 2 *** TEST OF BACKUP AIR ACCUMUALTOR SYSTEM TO MAIN STEAM ISOLATION VALVE FCV-44 STP M-ll4 5 1 *** VERIFICATION OF SEISMIC QUAllFICATION OF CONTAINMENT , SPRAY PIPING STP M-114 0 2 ***VERlrlCATION OF SEISMIC QUALIFICATION OF CONTAINMENT SPRAY PIPING STP M-115 1 1&2

  • TEST FOR LOW FLOW ALARM ON CONTAINMENT PURGE FAN E-3 STP M-ll6 1 1&2
  • BLOWDOWN AND TEST RUN OF BREATHING AIR SYSTEM .

STP M-238 1 1&2 ** LEAK TEST OF SAFETY INJECTION PIPING DOWNSTREAM OF 8802A&B STP G-8A 7 1&2 **CAllBRATION & USE OF ANALOG REACTIVITY COMPUTER STP G-8B 3 1&2

  • SETTING OF REACTIVITY COMPUTER STP G-8C 5 1&2 **0PERATIONAL CHECK 0UT OF THE REACTIVITY COMPUTER h STP G-80 7 1&2 ***CAllBRATION AND USE OF THE DIGITAL REACTIVITY COMPUTER l

STP G-8E O 1&2 ***CAllBRATION AND USE OF THE MULTI-CHANNEL DIGITAL REACTIVITY COMPUTER WITH MIDS DETECTORS STP G-9 7 1&2

  • GENERAL HEPA FILTER BANK PENETRATION TEST l STP G-10 6 1&2
  • GENERAL CHARCOAL FILTER BANK PENETRATION TEST l

STP G-ll 4 1&2 *** PROCEDURE FOR OBTAINING CHARC0AL FILTER MEDIA FOR ) LABORATORY TESTING (METHYL 10 DINE). STP G-12 3 1&2 *0PERATION OF THE PORTABLE LEAK TEST MONITOR STP G-13 3 1&2 **0PERATION &-USE OF PRESSURE TIME RESPONSE TESTER STP G-14 10 1&2 *0PERABILITY DETERMINATION OF POST ACCIDENT SAMPLING PROGRAM STP G-15B 2 1&2 *** DETERMINATION Of VALVE STROKE TIMES WITH EQUIPMENT. TIMERS-

 )

I s_.. . . , , ,

22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 U0LUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV UNIT TITLE

 .==============         ... ==== = = = = = . . . = = = = . . . . . . . . . . . . . . . . . . . . . . . . = = = = = = = = = . . = = = = = = = = =

STP G-16 2 1&2

  • ALTERNATE METHODS OF MONITORING FOR HIGH-RANGE POST-ACCIDENT RADIATION MONITORS STP G-17A 4 1&2
  • EMERGENCY EQUIPMENT FOR ENVIRONMENTAL MONITORING INVENTORY SURVEILLANCE STP G-178 4 1&2
  • EVACUATION KIT INVENTORY SURVEILLANCE STP G-17C 4 1&2
  • HOSPITAL KIT INVENTORY SURVEILLANCE STP G-170 3 1&2 *K1 INVENTORY STP G-17E 6 1&2
  • EMERGENCY PROCEDURES PHONE NUMBER VERIFICATION.

STP G-17F 2 1&2

  • CONTROL ROOM EMERGENCY EQUIPMENT AND SUPPLIES STP G-17G 4 1&2 ** TECHNICAL SUPPORT CENTER EMERGENCY EQUIPMENT AND SUPPLIES STP G-17H 2 1&2 *0PERATIONAL SUPPORT CENTER EQUIPMENT INVENTORY SURVElLLANCE STP G-171 8 1&2
  • EMERGENCY OPERATIONS FACILITY (E0F)

STP G-17) 3 1&2

  • DECONTAMINATION FACILITY EQUIPMENT SURVEILLANCE STP G-17K 6 1&2 ***J0 INT MEDIA CENTER PHONE-0PERABILITY CHECK STP G-17L 4 1&2 **0NSITE ASSEMBLY AREAS EMERGENCY INSTRUCTIONS STP G-17N 1 1&2
  • SITE EMERGENCY SIGNAL-0UTLYING AREAS SURVEILLANCE STP G-17P 1 1&2 *TSC RADIATION MONITOR CHECK STP G-170 0 1&2 *ERDS CHECK STP G-18 0 1&2 ** SITE EMERGENCY SIGNAL AND FIRE SIGNAL AUDIBILITY AND FUNCTIONAL TEST -INSIDE THE PROTECTED AREA STP G-19 0 1&2' *RADI0 ACTIVE SOURCE LEAK TESTING.

STP S-1A 5 1&2 ** MEASUREMENT OF STATION SECURITY SYSTEM BATTERY PILOT CELL ' VOLTAGE AND SPECIFIC GRAVITY STP S-le 6 1&2

  • MEASUREMENT OF STATION SECURITY SYSTEM BATTERY V0LTAGE AND SPECIFIC GRAVITY-STP S-1C 2 1&2
  • SECURITY BATTERY TERMINAL RESISTANCE MEASUREMENT &

INSPECTION STP C-1 2 1&2

  • SPRAY ADDITIVE SYSTEM CHEMICAL INVENTORY q STP C-2 4 1&2
  • ACCUMULATOR CHEMICAL CONCENTRATION i STP C-3 0 1&2
  • SPENT FUEL POOL BORON CONCENTRATION '!

STP X-1 1 1&2

  • VISUAL EXAMINATION OF THE REACTOR VESSEL INTERIOR STP X-2 0 1&2
  • VISUAL INSPECTION OF REACTOR UPPER INTERNALS AND FUEL ASSEMBLY GUIDE PINS STP X-100 0 1&2 *ISI HYDROSTATIC PRESSURE TEST PROGRAM ,

STP X-101 0 1

  • REACTOR COOLANT SYSTEM PRESSURE BOUNDARY-HYDROSTATIC PRESSURE TEST (ASME CLASS 1)

STP X-107A 0 1

  • REACTOR COOLANT PUMP 1-1. SEAL' WATER INJECTION / BYPASS HYDROSTATIC TEST (ASME CLASS 1)

STP X-107B 0 1

  • REACTOR COOLANT PUMP 1-2 SEAL WATER INJECTION / BYPASS HYDROSTATIC PRESSURE TEST (ASME CLASS 1)

STP X-107C 0 1

  • REACTOR COOLANT PUMP 1-3, SEAL WATER INJECTION / BYPASS HYDROSTATIC PRESSURE TEST (ASME CLASS I)

STP X-107D 0 1

  • REACTOR COOLANT PUMP 1-4. SEAL WATER INJECTION / BYPASS HYDROSTATIC PRESSURE TEST (ASME CLASS !)

I 1 1

    ._  _________m_.____        _

,. - .- - .- .- . - - - -~ 22 JUL 93 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS , NUMBER REV UNIT TITLE  : r

  ===============      === ==== = = = = = = . . . . . . . . = = = = = = = = = = = . . . . . . . . . . . . = = . . . . . . . . . . . . = = = = = = =

STP X-200 0 1&2 *151 INSERVICE / FUNCTIONAL' PRESSURE TEST PROGRAM . STP X-209 i 0 1 *151 HYDROSTATIC PRESSURE TEST OF RCS SAMPLE LINES (LOOPS 1 # AND 4. HOT 1EGS) STP X-210 0 1 *151 HYDROSTATIC PRESSURE TEST OF PRESSURIZER SAMPLE LINES S-1673/8 AND S-1674-3/8 STP X-211 0 1 *151 HYDROSTATIC PRESSURE TEST OF 0F EXCESS LETDOWN HEAT EXCHANGER 1-1 TUBE SIDE AND INLET /0UTLET PIPE STP X-213 0 1

  • REACTOR COOLANT PUMP SEAL WATER BYPASS PIPING FROM R0-34, ,

35, 36 & 40 TO VALVE.CVCS-1-8142 STP X-214 0 1 *151 HYDROSTATIC PRESSURE TEST OF RCP SEAL WATER INLET ~' PIPING . . STP X-218 0 1 *151 HYDROSTATIC PRESSURE TEST OF CVCS RECIPROCATING CHARGING PUMP.1-3 ' l STP X-226A 0 1 *151 HYDROSTATIC PRESSURE TEST OF ACCUMULATOR INJECTION LOOP #1 STP X-226B 0 1 *151 HrJROSTATIC PRESSURE TEST OF ACCUMULATOR INJECTION LOOP #2 STF X-226C 0 1 *151 HYDROSTATIC PRESSURE TEST OF ACCUMULATOR INJECTION LOOP #3 STP X-226D 0 1 *ISI HYDROSTATIC PRESSURE TEST OF ACUMMULATOR INJECTION LOOP #4 . , STP X-227 3 1&2

  • SIS TEST iYSTEM PIPING PRESSURIZATION FOR 151 INSPECTION '
STP X-229 0 1 *151 HYDROSTATIC-PRESSURE TEST OF ACCUMULATOR SAMPLE
LINES STP X-234 0 1 ** CHARGING INJECTION SYSTEM PIPING PRESSURIZATION I STP X-234 0 2 ** CHARGING INJECTION SYSTEM PIPING PRESSURIZATION- I TP X-2SB 2 1 *ISI PRESSURE TEST OF CONTAINMENT SPPAY PUMP DISCHARGE PIPING 00 X-258 1 2 *151 PRESSURE TEST OF CONTAINMENT SPRAY PUMP DISCHARGE I

PIPING ST' X-261 0 1 *151 PRESSURE TEST OF SPRAY ADDITIVE TANK AND PIPING j PP X-262A 0 1 *151 HYDROSTATIC PRESSURE TEST OF CONTAINMENT FAN COOLER 1-1 CCW SUPPLY AND RETURN PIPING' , STP X-2628 0 1 *151 HYDROSTATIC PRESSURE TEST OF CONTAINMENT FAN COOLER 1-2 CCW SUPPLY AND RETURN PIPING STP X-262C 0 1 *151 HYDR 0STAllC. PRESSURE TEST OF CONTAINMENT; FAN COOLER 1 l 1-5 CCW SUPPLY AND RETURN PIPING STP A-263A 0 1 *ISI HYDROSTATIC PRESSURE TEST OF: CONTAINMENT FAN COOLER 1 1-3 CCW SUPPLY AND RETURN PIPING STP X-263B 0 1 *151 HYDROSTATIC PRESSURE < TEST OF CONTAINMEhT FAN COOLER 4 CCW SUPPLY AND PETURN PIPING STP X-264A 0 1 *151 HYDR 0 STAT 3r PRESSURE TEST Of RCP CCW OIL COOLER SUPPLY i LINE CONTAINMENT PENETRATION 19 STP X-264B 0 1 *151 HYDROSTATIC PRESSURE TEST OF RCP CCW OIL' COOLER. RETURN LINE CONTAINMENT PENETRATION 20 l t w w , ,+ e-

I 22 JUL 93 [ 4 DIABLO CANYON POWER PLANT UNITS 1 AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS NUMBER REV' UNIT TITLE

 ===============     === ==== ===========================================================

t STP X-265 0 1 *151 HYDROSTATIC PRESSURE TEST OF RCP CCW THERMAL BARRIER RETURN LINE CONTAINMENT PENETRATION 21 =; STP X-266 0 1 *151 HYDROSTATIC. PRESSURE' TEST OF EXCESS LETDOWN HEAT EXCHANGER 1-1 SHELL SIDE STP X-268 1 1 *151 PRESSURE 1 TEST-0F N2 SUPPLY T0 STEAM GENERATORS-STP X-268 1 2 *lSI PRES $URE TEST'0F N2 SUPPLY TO STEAM GENERATORS STP X-271 1 1 *ISI PRESSURE TEST OF_ PRESSURIZER RELIEF TANK HITROGEN SUPPLY LINE STP X-272 0 1 *151 HYDROSTATIC PRESSURE-TEST OF PRIMARY WATER SUPPLY -, PIPING TO PRESSURIZER RELIEF TANK STP X-275 1 1 *151 PRESSURE TEST OF ACCUMULATOR TANKS' NITROGEN SUPPLY HEADER STP X-279 0 1 *151 PRESSURE TEST OF AUX STEAM CONTAINMENT: PENETRATION STP X-279 0 2 *151 PRESSURE-TEST OF AUX STEAM CONTAINMENT PENETRATION .. SlP x-280 0 1 *151 PRESSURE TEST OF FIREWATER SUPPLY PIPING'FROM FP-1 TCV-633 10 ~D-1-180-

  • STP X-284 0 1 *151 PRESSURE TEST OF NITROGEN TO REACTOR COOLANT. DRAIN  ;

TANK 1-1 i STP X-310 0 1 *10 YEAR ISI HYDR 0 STATIC TEST OF'CCW SUPPLY AND RETURN HEADERS A, B AND C AND ASSOCIATED COMPONENTS-SlP x-310 0 2 *10 YEAR 1S1 HYDROSTATIC TEST OF CCW SUPPLY AND RETURN l HEADERS A,.B AND C AND ASSOCIATED-COMPONENTS-STP X-3100 0 2 +10 YEAR 151 HYDROSTATIC PRESSURE TEST OF CCW CONTAINMENT SUPPLY HEADER STP x-310R 0 1 *10 YEAt 151 HYDROSTATIC PRESSURE TEST OF CCW RCP 1-2 UPPER AND LOWER BEARING LUBE OIL COOLER SUPPLY AND RETURN PIPING. STP x-310F 0 2 *10 YEAR 151 HYDROSTATIC PRESSURE TEST OF CCW RCP 2-2 UPPER AND LOWER BEARING LUBE OIL-COOLER SUPPLY AND RETURN PIPING STP x-3105 . 1 *10 YEAR 151 HYDROSTATICLPRESSURE TEST OF CCW RCP-1-3 UPPER: , AND LOWER BEARING LUBE OlL COOLER SUPPLY AND RETURN PIPlHG STP X-3105 <

                                   *10 YEAR 151 HYDROSTATIC PRESSURE TEST OF CCW RCP 2-3 UPPER AND LOWER BEARING LUBE OlL COOLER SUPPLY AND RETURN PIPING        :

! STP X-3101 0 1 *10 YEAR 151 HYDROSTATIC PRESSURE TEST OF CCW RCP-1-4 UPPER i ' AND LOWER BEARING LUBE OIL COOLER SUPPLY AND RETURN' PIPING STP x-310T 0 2 *10.YLAR 151 HYDROSTATIC PRESSURE. TEST OF CCW RCP 2-4 UPPER-AND LOWER BEARING LUBE OIL COOLER SUPPLY AND RETURN PIPING' STP x-3100 0 1 *10 YEAR 151 HYDROSTATIC PRESSURE TEST OF CCW RCP 1-1' UPPER AND L0kER BEARING LUBE Olt COOLER SUPPLY AND RETURN PlPING STP X-3100 0 2 *10 YEAR 151 HYDROSTATIC PRESSURE TESI 0F CCW RCP 2-1 UPPER-ANL LOWER BEARING LUBE OIL COOLER SUPPLY AND RETURN PlPING STP X-310V 0 2 *10 YEAF. ISI HYDROSTATIC PRESSURE TEST OF.CCW REACTOR VESSEL COOLING PLATES STP X-311A 1 1 *10 YEAR 151 HYDROSTATIC PRESSURE TEST OF CCW RCP 1-2 THERMAL BARRIER AND~RE1 URN' HEADER l l

22 JUL 93 DIABLO CANYON POWER PLANT I UNITS 1 AND 2 j VOLUME 6 SURVEILLANCE TEST PiCCEDURES

                                                                                                         )

TABLE OF CONTENTS NUMBER REV UNIT TITLE

   =============== === ====         ================u==========================================

STP X-311A 0 2 *10 YEAR 151 HYDROSTATIC PRESSURE; TEST OF CCW RCP 2-2 THERMAL BARRIER AND RETURN HEADER STP X-311B 1 1 *10 YEAR ISI HYDR 0 STATIC PRESSURE TEST OF CCW RCP 1-3 THERMAL BARRIER PIPING STP X-3118 0 2 *10 YEAR ISI HYDROSTATIC PRESSURE TEST OF CCW RCP 2-3 THERMAL BARRIER PIPING i STP X-311C 1 1 *10 YEAR ISI HYDR 0 STATIC PRESSURE TEST OF CCW RCP 1-4 - THERMAL BARRIER PIPING STP X-311C 0 2 *10 YEAR ISI HYDROSTATIC PRESSURE TEST OF CCW RCP 2-4 THERMAL BARRIER PIPING-STP X-311D 1 1 *10 YEAR ISI HfDR0 STATIC PRESSURE TEST OF CCW RCP 1-1 THERMAL BARRIER PIPING STP X-3110 0 2 *10 YEAR ISI HYDROSTATIC PRESSURE TEST OF CCW RCP 2-1 THERMAL BARRIER PIPlNG STP X-400 1 1&2 *151 TEST PROGRAM FOR CLASS 1 AND CLASS 2 COMPONENTS STP X-500 1 IL2 *ISI TEST PROGRAM FOR CLASS 1 PIPING SYSTEMS AND CLASS'2 PIPE SUPPORTS STP X-600 1 1&2 *151 TEST PROGRAM FOR CLASS 2 PIPING SYSTEMS EXCEPT-SUPPORTS STP X-700 1 1&2 *]SI TEST PROGRAM FOR CLASS 3 COMPONENTS STP X-800 0 1&2 *ISI TEST PROGRAM FOR STEAM GENERATOR TUBES STP X-900 0 1&2 *lSI TEST. PROGRAM FOR CLASS 1 AND CLASS'2 COMPONENTS REQUIRING SUCCESSIVE INSPECTION i STP X-2105 0 1 *151 PRESSURE TEST OF SERVICE AIR PENETRATION l STP X-2105 0 2 'ISI PRESSURE TEST OF SERVICE AIR PRESSURE STP X-2106 0 1 *151 PRESSURE TEST OF INSTRUMENT AIR SUPPLY HEADER STP PEP 00A 0 1&2

  • DEVELOPMENT AND IMPLEMENTATION GUIDELINES FOR PERFORMANCE ENGINEERING PROCEDURES STP PEP 00B 0 1&2
  • PERFORMANCE MONITORING BASELINE / PERIODIC PROGRAM STP PEP 00C 0 1&2
  • VIBRATION IMPLEMENTATION AND MONITORING GUIDELINES STP PEP 03-01 0 1
  • MAIN FEEDWATER PUMP 1-2 DISCHARGE CHECK VALVE TEST STP PEP 03-02 1 1&2
  • DETERMINATION AND. VALIDATION OF THE N0ZZLE FOULING FACTOR-STP PEP 04-01 0 1&2 *10% ATMOSPHERIC DUMP-VALVES OPERATIONAL CHECK OF BALANCING 1 CHAMBERS (PCV-19, 20, 21 & 22)

STP PEP 04-R 2 162

  • MAIN FEEDWATER TURBINE OVERSPEED TRIP TEST, )

STP PEP 05-01 0 1&2 ***FEEDWATER HEATER PERFORMANCE EVALUATION i i STP PEP l-80.01 0 1&2

  • CALIBRATION OF THE ABL-4000 RESPIRATORY AIR LINE MONITORS AT BLAST / PAINT FACILITY STP PEP M-12A15 1 1 ** BATTERY 15 PERFORMANCE TEST-

, STP PEP M-12A16 1 1 ** BATTERY 16 PERFORMANCE TEST i STP PEP M-12A17

                 ~

0 1 *** BATTERY 17 PERFORMANCE TEST STP PEP M-12A25 0 2 ** PLANT ENGINEERING PROCEDURE BATTERY 25 PERFORMANCE TEST l STP PEP M-12A26 0 2 ** PLANT ENGINEERING PROCEDURE BATTERY 26 PERFORMANCE TEST- , t STP PEP M-12A27 0 2 *** BATTERY 27 PERFORMANCE TEST  ; STP PEP R-1 3 1&2 *PETRIEVAL.0F UNDERWATER DEBRIS I l

i 22 JUL 93. DIABLO CANYON. POWER PLANT UNITS l'AND 2 VOLUME 6 SURVEILLANCE TEST PROCEDURES TABLE OF CONTENTS' NUMBER' REV UNIT TITLE-

  =======.....===        === ==== .................................................==========-
                                                                                                  )

STP PEP 20-01 1 1&2 ***EH CONTROL SYSTEM HP ACCUMULATOR PRECHARGE PRESSURE- l CHECKS I

                                                                                           ,f .

i i t t f l I-t

,. - - . -. . .- .-. . - - = . - . _ - [ ) f DIABLO CANYON LOOP TEST REPORT , (NOT' INCLUDED) l ) 1 1 For Both Units, including Unit 1-and Unit 2 unique tests, common Area Tests and Unit 1 & 2 Combined, the total number of loop tests is approximately 3,200. Due to'the' size of this exhibit ) (approximately 150 pages) a copy of the entire list'is'not j included with this testimony. -However, a copy of the first page-of the list is attached for illustration purposes. ;The complete ~ list will be furnished at-the hearing for inclusion in the- j record. , )' I

                                                                                          )

l l l l

)

l s i ,, ,.;, .

DCPP Loon Test Report

 ' Unit Test Number Rev            Approval                     Title 0           2-69     0        08/14/91 COMPLT BACKWASH SUMP 01 LEVEL CHANNEL .

LS 114A/B CALIBRATION 0 2 124 0 09/07/90 COMPLT PRECOAT FILTER DEhEN 0-1 BACKWASH - AIR FCV Il54 CALIBRATION 0 2-125 0 07/12/90 COMPLT PRECOAT FILTER DEh0N 01 DRAIN FCV-1155 CALIBRATION 0 2 127 0 07/26/92 COMPLT BACKWASH WATER FLUSH AND FILL TO ' PRECOAT FILTERDEh0N 01 FCV 1157 CALIBRATION l 0 2 132 0 01/27/93 COMPLT PRECOAT FILTER DEMINERALIZER 0-1 INLET FCV ll62 CALIBRATION 0 2153A 2 06/04/93 COMPLT PRECOAT FILTER DEMIN 0-2 OUTLET FLOW CHANNEL FT-1251 CALIBRATION ) O 2 161 0 05/06/92 COMPLT PRECOAT FILTER DEMIhTRALIZER 0 2 DRAIN FCV-1255 CALIBRATION l 0 2 300 0 02/05/91 COMPLT BACKWASH SLURRY TANK 0-1 LEVEL CHANNEL LI 300 CALIBRATION l ' O 6-4 A 0 01/24/92 COMPLT AUXILIARY BOILER O-1 WATER LEVEL CONTROL CHANNEL LS 346 h ' CALIBRATION O 6-4 B 0 01/24/92 COMPLT AUXILIARY BOILER 01 WATER LEVEL CONTROL CHANNEL LS 344 CALIBRATION f 0 6 7A 1 05/13/93 COMPLT AUX BLDG AUX STEAM SUPPLY HEADER PRESSURE CHANNEL PC-Il3 ) CALIBRATION 0 6-10D 0 06/14/90 COMPLT REBOILER 01 DRIP POT LEVEL SWITCH CHANNEL CALIBRATION 0 6-12B 0 07/16/90 COMPLT WASTE CONC 0-1 DRIP POT LEVEL SWITCH CHANNEL CALIBRATION 0 613B 0 06/14/90 COMPLT REBOILER 0-1 LEVEL SWITCH CHANNEL ' h CALIBRATION 0 6-14B 0 07/16/90 COMPLT BUILDING HEATING DRAIN RECEIVER 01 LEVEL SWITCH CHANNEL' CALIBRATION  ; 0 6 23A 0 03/30/87 COMPLT AUXILIARY BOILER FUEL OIL PP l 01 IhTK ' ) 0 6 604 0 07/16/90 COMPLT PACKAGE BOILER 0-2 HIGH ANDLOW WATERLEVEL ALARM _i CHANNEL CALIBRATION _ l l 0 6-606 0 07/16/90 COMPLT PACKAGE BOILER 0-2 LOW WATER F.O. . CUT OFF CHANNEL CALIBRATION 0 6-608 0 07/23/90 COMPLT PACKAGE BOILER 0-2 LO LO WATER ) LEVEL CHANNEL CALIBRATION  ! O 6-970 0 05/08/91 COMPLT PACKAGE BOILER 0 2 FUEL OIL' STORAGE TANK LEVEL CHANNEL LT 970 CALIBRATION 0 8 7A 0 04/27/88 COMPLT LlQUID HOLD-UP TANK 0-1 LEVEL 0 8-7B 0 12/13/88 COMPLT LlQUID HOLD-UP TANK 01 LEVEL )

0 8 7C 0 11/18/88 COMPLT LlQUID HOLD-UP TANK 01 LEVEL i

I l Page I of XX l

}}