Forwards Insp Rept 50-155/93-20 on 931025-29.No Violations Noted
ML20059M335
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 11/10/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Donnelly P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20059M336 List:
References
NUDOCS 9311190038
Download: ML20059M335 (2)


See also: IR 05000155/1993020

Text

_

.

.

/p mug'o,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

8N

REGION III

o

5

E

799 nOOSEVELT ROAD

-

"o,

GLEN ELLYN. ILUNotS 60137-5927

s****~*/

NOV 101993

Docket No. 50-155

Consumers Power Company

ATTN: Mr. P. M. Donnelly

Plant Manager

Big Rock Point Nuclear Plant

10269 US 31 North

Charlevoix, MI 49720-9435

Dear Mr. Donnelly:

This refers to the special electrical distribution system followup inspection

conducted by M7ssrs. D. Butler and R. Winter of this office on October 25-29,

1993. The inspection included a review of activities authorized for your Big

Rock Point Nuclear Plant. We discussed our inspection findings with you and

,

'

others of your staff at the conclusion of the inspection.

Arear. examined during the inspection are identified in the report. These

areas consisted primarily of a review of your actions on previously identified

inspection items from the electrical distribution systea functional inspection

(EDSFI) conducted in 1992. Within these areas, the inspection consisted of a

selective examinatior of procedures and representative records, field

walkJowns and interviews with personnel. The inspection identified an

engineering weakness (Inspection Followup Item No. 155/93020-01) regarding the

lack of emergency diesel generator (EDG) cooling water suction heater design

information. This issue was of concern since operations personnel were

verifying the functionality of the heater each shift in a manner that was not

indicative of the actual control circuit operation. We request that you

submit within 45 days of the date of the letter transmitting this inspection

report, a written rt.sponse detailing the steps that will be taken to address

this item.

No violations of NRC require

+s were identified during the course of this

inspection.

In accordance with 10 CFi

.P of the Commission's regulations, a copy of

this letter and the enclo- .e inspection report will be placed in the NRC .

Public Document Room.

We will gladly discuss ar.y questions you have concerning this inspection.

Sincerely,

/

-

9311190038 931110

/

{DR

ADOCK 05000155

C

PDR

G. C. Wright, hief

Engineering Branch

Enclosure:

Inspection Report

No. 50-155/93020 (DRS)

'see Attached Distribution

1

Pabyc.zaJ

..

.

Consumers Power Company

2

NOV 10 ES3

Distribution

.

cc w/ enclosure:

David P. Hoffcan, Vice President,

,

Nuclear Operations

0C/LFDCB

Resident Inspector, RIII

James R. Padgett, Michigan

Public Service Commission

Michigan Department of

Public Health

Big Rock Point LPM, NRR

Palisades SRI

E. Imbro, NRR

.

e