ML20059M333

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 931123 to Discuss Enforcement Conference Re Potential Containment Sump Inoperability
ML20059M333
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/15/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
EA-93-278, NUDOCS 9311190037
Download: ML20059M333 (3)


Text

g af %, UfetTED STATES NUCLEAR REGULATORY COMMISSION

[ \

. j j ~ '^ l j REGION IV 8 611 RYAN PLAZA DRIVE, SU6TE 400 ARLINGTON. TEXAS 760114064

+.. +

November 15, 1993 t

NOTICE OF SIGNIFICANT LICENSEE MEETING Name of Licensee: Entergy Operations, Inc.

Name of Facility: Arkansas Nuclear One r Docket: 50-313; 50-368 EA: 93-278 Date and Time November 23, 1993 of Meeting: 9 a.m.

Location of Meeting: Region IV Training Conference Room Purpose of Meeting: Enforcement conference regarding potential containment sump inoperability NRC Attendees: J. Milhoan, Regional Administrator J. Montgomery, Deputy Regional Administrator G. Sanborn, Enforcement Officer C. Hackney, State Liaison Officer J. Gilliland, Dublic Affairs Officer T. Gwynn, Deputy Director, Division of Reactor Projects (DRP)

T. Stetka, Chief, Project Section D, DRP L. Smith, Senior Resident Inspector, Arkansas Nuclear One W. Beckner, Director, Project Directorate IV-1, Office of Nuclear Reactor Regulation (NRR)

R. Azua, Resident Inspector, Fort Calhoun Station K. Kennedy, Acting Project Engineer, Project Section D, DRP S. Collins, Director, Division of Reactor Safety (DRS)

T. Alexion, Project Manager, NRR Licensee Attendees: J. Yelverton, Vice President, Operations J. Vandergrift, Plant Manager, Unit 1 R. Edington, Plant Manager, Unit 2 R. Lane, Director, Design Engineering R. King, Acting Director, Licensing

, B. Greeson, Acting Manager,

Mechanical / Civil / Structural Engineering J. Miller, Supervisor, Nuclear Safety Analysis J. Taylor-Brown, Coordinator, Quality I

i 9311190037 931115 PDR ADOCK 05000313 G pon

i IDII5 W Entergy Operations, Inc. -2  !

l 1

I NOTE: '

(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made known by COB on November 22, 1993, via telephone call to Tom Stetka 1 l

(817) 860-8247.

(2) Due to the subject matter and nature of this meeting, this meeting is not I open to attendance by members of the general public.

Approved By: ~

A. Bill Beach, Dir c Division of Reacto r ts l

?

Entergy Operations, Inc. 10/ I 5 E Distribution:

DMB (IE 45) \D J. H. Sniezek, EDR (MS 17G21)

H. L. Thompson, DEDS (MS 17G21)

T. E. Murley, D/NRR (MS 12D1)

W. T. Russell, ADT/NRR (MS 12G18)

J. G. Partlow, ADP/NRR (MS 12D9)

J. Lieberman, D/0E (MS 7H5)

L. J. Chandler, OGC (MS 15818)

D. L. Wigginton Project Manager, NRR OEDO RIV Cocrdinator (MS 17G21)

J. L. Milt;;n, "c J. " "cntg omc ry-9RA G. i. Sanborn, EO-C. A. i;sckary, RSLO J.

NRC Sillil eus, ['AO, Attendees R!t)

E-m#i/

RA Secretary Carol Gordon DivisionSecretary(88 [b>\

L. S. Ousley RIV File ,

l l

RIV:PE:DRP/ C:DRP/D' PA05 RSLO '"- E(7 f h: P KMKennedy:ww TFStetka JTGi'llil and CAHackney GFSinborn ABBeach 11/ 10 /93 11/g/93 11/{p/93 ll/ic./93 ll/)U/93 11/Jt/93 l 1800fG