ML20059M271
| ML20059M271 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/17/1993 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| OLA-2-A-003, OLA-2-A-3, NUDOCS 9311190008 | |
| Download: ML20059M271 (3) | |
Text
-- _ ___ _ _ - _ -
& - 2 75 3 z3 -6ck-e p3 EXHIBII_).
ualut) 05NP.C PROFESSIONAL QUALIFICATIONS
..PS:/;0-OF-cn c :;; ii.GfIM.Y DAVID A. VOSBURG, Duchi W.;V W pi ;.Mce
.t i
Nt! CLEAR RECULATORY COMM15310N Docket No bO-J'f5-OL A omeist exh. no.
A in the mettu of kuntC.b S %) k Lf.7Il 6 dd
- Staff ____ __
IDENilftED W
Ap;;ir.n.
V Mnt v!CD ink r e RU 04LD -
Ce - '*
Canor.x Arw2hMontt J..l_df v.m.s
- Fe crkr
' l# d4 931119000s 930s17
- [ --
g()
PDR ADOCK (15000275 I'
O PDR-
RESUME-WORK PLANNING DIRECTOR David A. Vosburg i
1.
Birthdate - October 22, 1952_
)
2.
Citizenship - USA i
I 1
3.
Education - B.S.,
Nuclear Engineering, University of.
California, Santa Barbara, 1977 4.
Employment History - Joined PG&E in December 1979.
a.
June 1977 to March 1979 - Employed by the Bechtel-Power Corporation _as a Nuclear Engineer. assigned to j
the Arkansas Nuclear One - Unit.2~ project during the final construction and initial startup phases.of the facility.
- l b.
March 1979 to November 1979 - Employed by the General ~
Electric Company as a Design. Engineer involved;in_the j
thermal design and environmental qualification of.
Solid State Nuclear Plant Protection Systems.
'l c.
December 1979 to April 1980 - Employed by PG&E d.
Apr3.1 1980 - Assigned as a Shift Technical. Advisor at j
DCPP.
s e.
January 1983 - Promoted to Shift Foreman in,the Operations Department.
f.
August 1986 - Promoted to Engineering Manager.
g.
January 1987 - Transferred to the_ Operations Department as a Shift Supervisor.
l h.
April 1992 - Promoted to. Operations' Superintendent.
j i
i.
August 1992 - Promoted to-Work Planning Director.
5.
Nuclear Experience I
a.
Bechtel Power Corporation - Responsible Systems 4
Engineer for the Chemical and Volume Control,~ Safety.
Injection, Regenerative Waste and: Solid Radwaste' Systems.
Participated in the development 1of the Plant Technical Specifications, Fire Hazards. Analysis and-l High Energy Pipe Break. Analysis.
b.
General Electric Company - Involved in the' thermal design and environmental qualificationLof safety-related electronic equipment.used in nuclear power facilities.
Additional-responsibilities?were in-l r
- -. -. =.
)
the area-of radiation shielding of electronic H
equipment.
~
c.
Pacific Gas and Electric, DCPP - Power Production
)
Engineer (Staff) engaged in revising.the Site Emergency Plan and in the preparation of Emergency H
Proc,edures.
Worked in the Operations Department throughout the pre-license, startup and power.
ascension phases of both Unit 1 and'2 as a Shift' l
Technical Advisor, Shift Foreman, Shift Supervisor and
)
Operations Superintendent.
Work Planning Director responsible for the maintenance work planning and work scheduling activities for DCPP during normal operation and outage periods.
j d.
Senior Reactor Operator License for!DCPP maintained p
from April 1982 (Unit 1), April 1984 (Unit 2)'through September 1992 -
l 4
6..
Formal Training Courses a.
Westinghouse Shift Technical Advisor Training program
]
for transient and accidental analysis (27 week program, 1980).
b.
Simulator Training - Westinghouse Nuclear Training.
Center, Option III (14 day course, 1980).
}
c.
Westinghouse Operation PWR Training Program,~ Phase II (10 week courst, 1981).
d.
Westinghouse PWR--Simulator Training Program, Phase III (11 week course, 1981).
)
1 I
l
)
)
1 I
)
i