UNIVERSITY OF WASIIINGTON SEATTLE, WASillNGTON 98195 College of Engineering, Ofice of the Dean, FH-10 November 5,1993 (206) 543-0340 Theodore S. hiichaels, Senior Project hinaager Non-Power Reactors, Decommissioning and Environmental Project Directorate Division of Advanced Reactors and Special Projects Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Subjcet: Possession-Only-License Rcqucst and Current Status of the University of Washington Reactor Decommissioning Pn>gmm
Reference:
(1) hieeting at NRC Headquarters, between F. Trejo (NES) and T. hiichaels (NRC) on September 16,1993 (2) Technical Specifications for the University of Washington Nuclear Reactor, dated April 12,1972, Amendment No.15 (3) NRC License No. R-73/ Docket No. 50-139
Dear hir. hiichaels:
The University of Washington is hereby requeste, a Possession-Only-License (POL) status for the facility covered by the above NRC license.
!, imrein, lists the requested changes :n Technical Specifications in support of the POL-
[
request, such that all of the decommissioning activities will be performed under 10 CFR 30. In -
addition, Enclosure 2 provides the current status and planned activities of the University's Decom-missioning Program. It is our understanding that hir. Trejo gave you an overview of the University Decommissioning Program during the above referenced meeting.
{
Please be informed that the upcoming submittal of the University's reactor Decommissioning Plan will replace in its entirety all of our previous submittals.
Sincerely yours, k
y Mky
& pd T h, J. Ray Bowen
'1)on G. Brown, Dinctor i
Dean Environmental Health & Safety
{
l cc: Oversight Committee Technical & Safety Committee
Enclosures:
Possession-Only License Request Status Report 9311180255 93110,5',
17Wknzdu li oa aoocx o5000 3 e
s m c...,._-.
4.;
g PDR g
4
.e Universi'ty of Washington November 3,1993
! - Possession Only License Request A. PURPOSE i
It is the objective of the University of Washington (UW) to request and obtain a Possession-Only-License (POL) since all of the reactor fuel (unirradiated and spent) i was shipped off-site as of February 14, 1990, and the University has taken administrative and functional steps to decommission its research reactor. (See i, herewith.)
B. POL ACTIVITIES The University of Washington requests to perform all reactor decommissioning activities under 10 CFR 30 upon receipt of its Decommissioning Order.
C. CHANGES TO THE UW'S REACTOR TECHNICAL SPECIFICATIONS The University is hereby requesting the following changes in the Technical l
Specification for Facility License No. R-73, Dated April 12,1972 and as changed per i
Amendments No.14 and No.15:
I
- 1)Section II.B: Delete 2,3,4, and 5 Basis for Request: There is no fuel present at all in the reactor. There are no i
off. gas releases nor gaseous activities. The University does continue to
-l conduct air supply operations inside the reactor area.
1
'l
- 2) Section III: Delete this section in its entirety Basis for Request: The University has no plans to re-start this reactor. The University plans to decommission ti.is facility and obtain a license termination for its reactor.
- 3) Section IV: Delete this section in its entirety Basis for Request: See 2) above.
- 4)Section V.B: Delete this section in its entirety Basis for Request: See 1) above.
- 5)Section V.C: Change to read: "The radiation monitors in item A shall be calibrated at least annually."
H i
- 6) Section VI: Delete this section in its entirety Basis for Request: See 1) and 2) above.
J
- 7) Section Vil: Delete this section in its entirety Basis for Request: See 2) above.
.l
c
..i
(;
University of Washington November 3,1993 Page 2 - Possession Only License Request
- 8)Section VIII.B, D and E: Delete these sections in their entirety.
- 9)Section VIII.C: Change: " Reactor Facility Advisory Committee" to read
" Technical k Safety Committee."
1 l
- 10)Section VIII.G: Change to read: "A Technical and Safety Committee shall provide oversight of activities performed under the University's Research Reactor Decommissioning Project. Committee members shall be appointed by R
the Dean of the College of Engineering and shall include the University's Radiation Safety Oflicer and a representative of the University's Environmental Health and Safety Department. The Committee shall keep written records ofits meetings. The Committee shall report directly to the Dean of the College of Engineering."
l Basis for Hequest: See 1) and 2) above.
- 11) Section Vill.J.1: Change: " Reactor Facility Advisory Committee" to read
" Technical & Safety Committee."
_[
..~ - - ~
=- -
4
.a li Universfty of Washington November 3,19931
! - Status Report 1
University of Wasnington Reactor Decommissioning Program A. GENERAL
~
l The University of Washington (UW) has retained the services of NES, Inc to fulfill l
the role of Executive Engineer / Owner's Representative for this project. On August l
24,1993 UW and NES had a Project Kick-off Meeting to review the anticipated activities to be performed as part of the D&D program.
-j i
On September 14,1993 UW and NES met with the City-University-Community Advisory Committee (CUCAC) and informed them of WU's plans regarding the decommissioning of UW's Resear_a Reactor.
On September 16,1993 NES, on behalf of WU, met with Mr. Theodore S. Michaels,
- i NitC Project Manager, to present the University's approach and schedule toward
'l obtaining a license termination for UW's Research Reactor. Specifically, that NES i
was going to conduct a site characterization of the reactor site to collect radiological data for the preparation of the deco-missioning plan. NES was informed that the NRC did not need to review or approve the NES Site Characterization Plan.
llowever, the NRC expects that the Site Characterization Plan and Report will be part of the Decommissioning Plan as well as the financial assurance instrument. Mr.
Michaels was also informed of the intent to request the Possession-Only-_ License j
st atus.
l
. B. PROJECT ORGANIZATION The University of Washington as the licensee of a' facility has total responsibility for the activities performed by its representatives a. d subcontractor, and as such, j
~
the University has selected to appoint a Technical and Safety Committee to set i
policy
~' provide oversight of subcontractor and D&D activities. This particular comn.-
wnds to function in place of the Reactor Facility Advisory Committee.
Most oi o, wmbers of the Technical and Safety Committee were part of the Reactor Facility Advisory Committee, and the rest of the members come from the Environmental Health and Safety Department of the University. There is one additional member representing the University's Facility Management i:
Operations / Capital Projects Organization and who acts as the Project Manager for the D&D project. All specialized subcontractors report to this individual.
1 C. SITE ACTIVITIES i
l NES will be performing a radiological and hazardous characterization of the facility l
the week of October 18.
,j 3
i
.h p.
1
-w
4 ATTACIIMENT TO ENCLOSURE 2 I
9 3
L F
1 i
i
,,TM jy/ M yk #j( JW
- e. R.
+
N.4 i
UNIVERSITY OF WASIIINGTON RESEARCII REACTOR DECOMMISSIONING PROJECT PROPOSED PROJECT PERFORMANCE
SUMMARY
BY
}
n
df(f( 9n!ED ENVIRON @=NIAL SER*!!%S A
N/s A Division of 44 Shelter Rock Road
)
Danbury, CT 06810 (203) 796-5268
UW RESEARCH REACTOR DECOMMISSIONING PROJECT APPROACH WORKEREAKDOWN STRUCTURE (WBS)
/
AWARD OF CONTRACT I
if V
Review of Project File Pmject Cent l$& QAPP V
If i
g]fA Task ri ations
[
n d) l V
Y
/
Project Personnel Assignments 7
Tast Budgets Responsibilities l
J V
I Y
/
'/
/
Report Formats f
Resource Loading &
_,,,____________,_j
/
% Spent vs. % complete
/
Schedule Fon-cast y
if 1r
/
Kick-Off Meeting Representatives)
/
(8/24/93)
/
Y
'I On-going
' ASSURANCE OF 41 completed
- END-PRODUCT DELIVERABLES 7-
PROJECT PLANNING P,ERFORSLLNCE
,.-s 3
(PHASE I) ist U.S. NRC
//
UW Community In
/
~
Contact (9/14/93)
(9/16/93)
, /
e V
'If V
Rad Characterization Survey Plan Outline of Cost Est. Model (PreplSubmittal/ Review by UW)
D&D Plan (DECOL Inputs Reqs)
V V
V Review fTechniques, Approaches Rad Characterization Survey m
Performance Specific Site Conditions V
V V
l I^"
Rad Charactenzation Report m e Drsh I
V_
Decom p
V e
Financial s m ance-DeterInination of Source Term, Inventory y
Rad Waste Volumes Decom Plan & Estimate Rev.0 (Review by UW) p l
Submission to -
U.S. NRC For D.O. Request I
i On-going y
COMPLETE REVIEW & APPROVAL PROCESS
-F
//A Con 1plete'd g
g
3*
PROJECT DESIGN PERFORMANCE IES/UWNR (PHASE II)
U Outline of Tech. Specs.
Bid Documents (Review w/tnV)
U Establish Qualification Criteria For Decom Operations Contractor (DOC) 1I Draft Tech. Specs.
(PmplSubmittal/ Review w/UW)
V Bi&iers Exp. ol Interest V
Bid Package Ready To Go Out V-AWAITING U.S. NRC's D.O.
4
' PROJECT IMPLEMENTATION PERFORMANCE
'J
- DOC /ES/UW (PHASEIII)
Receipt of U.S. NRC's D.O.
V Bidding Pmcess Selection of DOC
- 1r 1r II QA Compliance D&D of UWNR Executive Engineering Surveillance IES/UW by DOC IES If Final Survey Recor Subruittal to NRC Verification
- Release Survey i-By U.S. NRC/OR1SE If-License Termination 1
p_
E_ND-OF-PROJECTJ L
Il-
se:
Urmrersrty Of Wsetmgton Propct Sche &Ao g,,
l s.
to Parum Durwon Aug l Sep l Oct l Nov l Dec Jan l Feb l 54ar [ Apr l May l.han l Jul l Aug l Sep l Oct l Nov { Dec Jam j Feb l h4ar l Apr M,ag 1
kutwl Platuurig 13d g 2-.....
Rewsw Lustog inforstate tw g
i 3
Ptarnr.g tw g
4 Setup Contros l
I 2d l
5 Keckoff Meetina 3d j
I 6
Diaracter tatum l
75d y
y 7
Prepare Pla i 3w g
p 8
liecew of P!an 4w g
9
' Perform C5Iacteestates 4w
~
~
l g
g 10 Remove floor THe Zw I
g 11
_ _ _ _ _.= Propero Report 4w 12 Documerit Proparation -
82d l
13 D$c~ommesseneg Plan Sw l
14 Cost Estwnste 6w g
f g
16 Sutmt to USNRC t
So i
L_
l r
1 L
t
~ ~.. ~ - - -.
Page 1-s m..
,.. _ ~.. -.,,...
UNIVERSITY OF WASHINGTON REACTOR DECOMMISSIONING PROJECT
_ ORGANIZATION & RESPONSIBILITIES U.S. NUCLEAR REGULATORY COMMISSION (USNRC)
Licensing Authority
- Approves Plans and Approach UNIVERSITY OF WASHINGTON
~
- Licensee
- Radiation Safety Committee
- Reviews all Documents Prior to Submittal to USNRC e
NESilES
- Technical Support Contractor
- Perform Planning
- Executive Engineer Decommissioning Operations Contractor
- To Be Determined
- Pe:Torm Actual Dismantlement of Reactor