' 1901 Grat:ct $treet
?
Post'0Hice Su ta3
- St Lcurs. Mssourr 63166 314 421 3222 t
j s
l i
i
)
September 20, 1990 m
Mr.-Kenneth E. Perkins, Jr.
l Chief, operator Licensing Branch, OWFN-10D-22 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
t
Dear Mr. Perkins:
ULNRC-2291-CALLAWAY PLANT UNIT 1 i
OPERATOR LICENSING NATIONAL EXAMINATION SCHEDULE Pursuant to your request for information on operator licensing examination schedule, received as Generic Letter-90-07, dated August 10, 1990, the attached provides the.
required. responses.
t If there.are any questions, please contact us.
Very truly yours,
,t wa !
u
/
Donald F. Schnell sp~
DJW/kea i
Enclosures (3) y l
f 01 p
$8Ai!B82!388%3
' '\\\\
V 0v1JD q-,
gy e
.t I
cc T. A.
Baxter, Esq.
j Shaw, Pittman, Potts!& Trowbridge j
2300 N.
Street, N.W.
j Washington, D.C.
20037
]
Dr. J. O. Cermak CFA, Inc'.
4 Professional Drive (Suite 110)
Gaithersburg, MD'20879 i
R. C.
Knop Chief, Reactor Project Branch 1 1
U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road; Glen Ellyn, Illinois 60137 Bruce Bartlett Callaway Resident Office U.S. Nuclear Regulatory Commission RR#1 Steedman, Missouri 65077 Anthony T. Gody, Jr. (2)-
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission l' White Flint,' North, Mail Stop 13E21 11555 Rockville Pike Rockville, MD. 20852-Manager, Electric Department' Missouri Public Sersice Commission P.O. Box 360.
Jefferson City, MO 65102-b
.S. Nuclear Regulatory Commission U
ATTN:
Document Control Desk Washington, D.C.
20555 l
- .. ~
bec:
D. Shafer/A160.761
/QA Record (CA-758)
Nuclear Date-l T '
E210.01 DFS/ Chrono D. F. Schnell J. E. Birk J. V. Laux M. A. Stiller G. L. Randolph R. J. Irwin H. Wuertenbaccher W. R. Campbell A. C. Passwater R. P. Wendling D. E. Shafer D. J. Walker O. Maynard (WCNOC)-
N. P. Gool (Bechtel)
T. P. Sharkey NSRB (Sandra Aus+on)
A160.412 (90-07) i i
19 PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FORP.AT FACILITY Callaway Plant NRC REGION III FY 1991 FY 1992:
. FY 1993 FY 1994 (10/1/90 (10/1/91-(10/1/92-(10/1/93-9/30/91) 9/30/92) 9/30/93) 9/30/94) 1.
Assigned-Date (GL39-03) 2/91 8/92 2/94-
- RO 6
6 0
6
- SRO Instant _ 4 4
0 2
- SR0' Upgrade 1
0 0
2
- SRO Limited-0 0
0-0 2.
Assigned Date (GL89-03) t
- RO 1
- SRO Instant
-l
- 5R0 Upgrade
- SRO Limited Please i.ndicate initi'al cold license examinations by placing an asterisk (*) by the date.. Please indicate examinations intended to extend an operator's license to a second-or subsequent unit with two asterisks (**).
(For example, if Unit 1
.is in operation and Unit 2 is approaching fuel load, and three R0 candidates and five RO with no previous license are to be examined on both Units 1 and 2 candidateslicensedonUnitIaretobeexaminedtoextendtheirlicensesto l
Unit.2, then indicate "R0 3,5**.")'
I
'f s
(
p 1
..o PROPOSED REQUALIFICATION EXAMlHAT10f! SCHEDULE FORMAT FACILITY Callaway Plant NRC REG 10tl III
. FY 1991' FY 1992 FY 1993 FY 1994-(10/1/90-(10/1/91-(10/1/92-(10/1/93-9/30/91) 9/30/92) 9/30/93) 9/30/94) 1.
Date 8/91 2/92 2/93 8/94 2.
Date f
3.
Date 4
Date 5.
Date h
\\
i t
i I
i t
1 1
I
. a
...:.i.
PROPOSED GENERIC FVil0AMENTAL EXAMINATI0t: SCHEDULE FORMAT FACILITY Callaway Plant NRC REGION III OCTOBER 1990 FEBRUARY 1991 JUNE 1991 Estimated t: umber of 10 Candidates.
The Generic Fundamental Examination Schedule (GFES) is administered three times a year, on the Vednesday following the first Sunday in February, June, and October.
(
1 f
1-l
{
3 II 1
4' 1
. _. _.. _ _.. _ _